13 November 2015
Mountain View Gold Project (ML5559)
In line with the announced refocus of Dart Mining NL toward low-cost gold development
and production, Dart Mining has been progressing the evaluation of the Mountain View
Gold Project, some 35km south-west of Corryong, Victoria.
As part of the ongoing geological and economic assessment and project development
program on the Mountain View Gold Project, Dart has applied a systematic approach to
the evaluation of the project, including:
the development of a detailed geological model utilizing results from past mining
(1990’s) of the near surface mineralization (open pit) and the extensive drilling
below the mined area;
the engagement of an experienced and respected mining engineering to develop a
preliminary mine design and economic model, which indicates further development
is justified with the next step being a metallurgical recovery test program;
the engagement of a highly experienced metallurgist to design and oversee a
representative ore sampling program, gold recovery test work program and produce
a report detailing the test gold recovery achieved and recommended optimal
processing route(s).
To undertake the above, Dart Mining has recently received the Work Plan approval
required to extract the required metallurgical samples from below the existing Mountain
View open pit.
Dart Mining is greatly encouraged by the recent identification of additional Arsenic soil
geochemical anomalies along some 1.2km of strike north from the Mountain View Gold
Project. Four (4) discreet Arsenic soil anomalies up to 350m in strike length have been
identified along the general mineralisation trend and are likely to be associated with
additional, near surface gold mineralization similar to the Mountain View Gold Project
(see ASX DTM 16 October 2015).
The potential for additional mineralization to be developed along the trend is now evident
over some 2 km of strike length north and south of the Mountain View Gold Project, with
a total of six zones currently identified that are worthy of first pass shallow drilling and
subsequent systematic testing and analysis.