Triumph Gold Project Webinar Presentation
Released
Released
Announcement PDF
Triumph Gold Project Acquisition
Webinar
August 2024
Mr. James Chirnside – Executive Chairman
Mr. Owen Greenberger – Head of Exploration
ASX: DTM
FORWARD LOOKING STATEMENTS CAUTION
Certain statements contained in this document constitute forward looking statements. Such
forward-looking statements are based on a number of estimates and assumptions made by the
Company and its consultants in light of experience, current conditions and expectations of
future developments which the Company believes are appropriate in the current
circumstances.
These estimates and assumptions while considered reasonable by the Company are subject to
known and unknown risks, uncertainties and other factors which may cause the actual results,
achievements and performance of the Company to be materially different from the future results
and achievements expressed or implied by such forward-looking statements.
Investors are cautioned that forward looking information is no guarantee of future performance
and accordingly, investors are cautioned not to place undue reliance on these forward-looking
statements.
2
ASX:DTM
CORPORATE PROFILE
Board & Management
Senior Management
• Mr. Owen Greenberger
Head of Exploration, Geologist
Mr. James Chirnside
• Executive Chairman
Mr. Dean Turnbull
• Non-Executive Director, Founder, Geologist
• Mr. Terry Bates
Head of Business Development,
Geologist
• Mr. Andrew Dawes
Manager Queensland Exploration,
Geologist
• Ms. Julie Edwards
Mr. Richard Udovenya
Co. Secretary, Accounting, ASX
• Non-Executive Director, Lawyer
ASX Code
DTM
Ordinary Shares on issue
~258.43m
Options & Performance Rights
~13m
Market Capitalisation @
0.02
3
~A$5.0m
ASX:DTM
TRIUMPH GOLD PROJECT – Acquisition & Project Highlights
Acquisition Highlights
• Consideration: $1m cash, $1m shares payable on completion
• Current holder Sunshine Metals (ASX: SHN) to remain substantially invested via DTM share ownership
• Resource acquisition cost equates to ~$16.95 per ounce in the ground.
• Established mining district with workforce and infrastructure
• Project has scope to host large intrusion related gold system (IRGS) >1moz1
• Generation of regular news flow around drilling results and resource expansion
Project Highlights
• Existing JORC 2012 compliant Inferred resource of approx. 118,000 oz at 2.03g/t Au 2
• More than 85% of the resource within 100m of surface
• Less than 20% of mineralisation strike-length has been drill tested, with all five established resource zones open along
strike and at depth
• Existing high quality Geological and Geophysical datasets
• Additional undrilled target areas and zones identified for drill testing
Note 1: ASX SHN: Drilling confirms large-scale Au system at Triumph Project (15 June 2023)
Note 2: ASX SHN: Robust Maiden Resource at Triumph Gold Project (31 March 2022)
4
ASX:DTM
Two Tranche Placement and Entitlements Issue
Two Tranche Placement
•
T1 & T2 placement to professional and sophisticated investors
•
Tranche 1 A$775,299 settling 5th September
•
Tranche 2 A$1.08m of firm commitments settling early to mid-October
•
Reflected strong shareholder and investor support
•
Priced at $0.012 cents, with 1:2 12-month option, Strike $0.02 cents
Entitlement Issue
•
1:3 Non-renounceable Entitlements Issue to eligible shareholders
•
Raising up to A$1.3 million assuming placement of shortfall
•
Entitlement issue to allow existing shareholders the opportunity to participate in the equity raising on the same terms as T1 & T2 Placement
Use of Funds
• Triumph Gold Project acquisition
• Exploration activities Victoria and Queensland
• Working capital
Note 1: ASX DTM August 2024
5
ASX:DTM
TRIUMPH GOLD PROJECT – Regional Geological Setting & Footprint
Tenement
Number
Name
Tenement Type
Area (km2) Unless Interest intended to be
specified
acquired from SHN**
Location
EPM18486*
EPM19343*
North Calliope
South Calliope
Exploration Licence
Exploration Licence
102.4
35.2
Queensland
Queensland
100%
100%
Location of the Triumph Project – QLD3
*
EPM18486 & EPM19343 are also subject to a 1% gross revenue royalty on gold, with Sunshine (Triumph) Pty Ltd having a pre-emptive
right to acquire the royalty. Bonus payments totalling up to $6m will also be payable to Roar Resources Pty Ltd on the declaration of a
JORC mineral resource, as follows: $1,500,000 for a mineral resource of 500,000oz in aggregate, $2,000,000 for a mineral resource of
1,000,000oz in aggregate, and $2,500,000 for a mineral resource of 2,000,000oz in aggregate, all calculated on an Au Equivalent basis
(see: SHN ASX announcement 25 September 2020 Prospectus, Sections 7.6 & 7.7) 7
** subject to completion of the Sale and Purchase Agreement – Triumph Gold Project in accordance with its terms
Note 3: SHN ASX announcement Prospectus (25 September 2020)
6
ASX:DTM
TRIUMPH GOLD PROJECT – Deposit Style
Triumph – Intrusive Related Gold (IRG) System
• The Triumph mineralisation is currently interpreted to be an IRG system
which tend to show significant depth potential.
• The region is known to host major intrusion related gold (IRG) systems,
porphyry and epithermal style gold and copper-gold systems
§ Ravenswood 7 Moz Au
§ Mt Rawdon 3 Moz Au
§ Cracow
3 Moz Au
§ Mt Morgan
8 Moz Au (VMS & IRGS)
• Triumph shows geological similarities to other large IRG systems in the
district with Sunshine Metals Ltd recent drilling reported as confirming
Triumph is analogous to the Ravenswood Mine (5.6Moz Au Resource –
2024) 5
• Intrusion related gold system
• Fractured tonalite host rock
• Mineralisation and alteration are similar with gold in
quartz/sulphide veins with some carbonate and sericite
alterations selvages around the lodes
• Ravenswood and Triumph - in common - have galena and
arsenopyrite
Deposit Style of the Triumph Project – adapted from Morrison (2014)4
• Recent drilling showed mineralisation over a large area to the south (2km from
MRE lodes), west and north demonstrating that Triumph is a big system.
Note 4: ASX SHN: Sunshine Gold Limited Prospectus (25 September 2020)
Note 5: ASX SHN: Follow Up Drilling at Liontown (19 June 2024)
7
ASX:DTM
TRIUMPH GOLD PROJECT – Maiden Mineral Resource Estimate (MRE)
Triumph – Mineral Resource Estimate (MRE)
• Over 90% of the current Resource of 118,000 oz at 2.03g/t Au at
Triumph is hosted in 20% of the 3km long (6km of delineated
structure) Southern Corridor, shallower than 100m7
• Sunshine Metals Ltd report initial metallurgical test work indicates
recoveries in excess of 96%6
• The resource remains open along strike and at depth
Current Resources area (black) - Southern Corridor and projected mineralisation (pink) correlate well with
elevated chargeability. Yellow arrows highlight extensional areas subject to follow up drilling (2022-2023) 6
Maiden Mineral Resource Estimate at Triumph Gold Project6
Note 6: ASX SHN: Robust Maiden Resource at Triumph Gold Project (31 March 2022)
Current Resources area (black) – Northern Corridor and projected mineralisation (pink). Yellow arrows highlight
extensional areas subject to follow up drilling (2022-2023) 6
Note 7: ASX SHN: Drilling confirms large-scale Au system at Triumph Project (15 June 2023)
8
ASX:DTM
TRIUMPH GOLD PROJECT – Exploration Potential
Triumph – Exploration Potential
Rock chip 9.6g/t Au
magnetic low (blue)
• Good quality exploration datasets available across
the project.
• Norton tonalite host clearly represented in Magnetic
imagery
Rock chips 62g/t
and 18g/t Au
Rock chip 255g/t Au
• Existing resource areas are positioned in a lower
magnetic response zone within the tonalite.
• Magnetic low response in centre of tonalite similar
to Mt Rawdon, Ravenswood and Mt Leyshon
• Introduced mineralising fluid causing potassic
alteration and is destroying magnetic signature of
the tonalite
9
ASX:DTM
TRIUMPH GOLD PROJECT – Ravenswood Surface Comparison
•
Ravenswood is a multi-million-ounce
production mine within proximity to the
Triumph project
•
Ravenswood plan showing proposed early
development
•
Tonalite host rock
•
Vein hosted sulphide rich mineralisation
•
Intersecting cross cutting structures
•
Multiple vein loads within close proximity
at surface
10
ASX:DTM
TRIUMPH GOLD PROJECT – Depth Potential Ravenswood Comparison
E
W
New Con
South Con
TDH001
1.0m @ 30g/t Au
150m below surface
1.0m @ 8.3g/t Au
200m below surface
1.0m @ 5.4g/t Au
240m below surface
•
Big Hans
Super Hans
21NCRC008
6.0m @ 13.1g/t Au
TDH005
1.0m @ 5.0g/t Au
260m below surface
22NCRC024
1.0m @ 13g/t Au
21NCRC013
2.0m @ 15.1g/t Au
22SHRC019
1.0m @ 5.5g/t Au
140m below surface
TDH002
1.0m @ 8.2g/t Au
240m below surface
Ravenswood Cross section from 2019 Resource statement
•
5 years of project development beyond this point
•
Current production ~200koz beyond 2035
•
Images at similar scale
•
Significant grade seen at depth at Ravenswood, Remains Untested at Triumph
11
ASX:DTM
TRIUMPH GOLD PROJECT – Resource Growth
Triumph – Resource Expansion Potential
•
3,695m of RC drilling completed by Sunshine
Metals (2022/23) to enable a low-cost resource
update and expansion at early stage
•
Infill and step-out drill testing planned by Dart
Mining both within the resource zones and along
projected mineralization
Further Resource Potential:
•
Extension of resource below 100m depth
•
Continued drill testing of historic mines such as
Advance and large satellite geochemical
anomalies already showing positive RC drill
results
•
New prospects such as the magnetic-low at the
intrusive core and mineralisation adjacent to the
Norton Fault
Plan View – 3km long Southern Corridor maiden resource block model (only 20% of which is included with the current MRE down to
100m depth). Sunshine Metals Ltd highlights of recent (2022/2023) RC drilling (yellow) and previous drilling (white) illustrating step out
drill results outside the MRE area8
Potential to define million-ounce Ravenswood style deposit8
Note 8: ASX SHN: Drilling confirms large-scale Au system at Triumph Project (15 June 2023)
12
DART ACTVITY SUMMARY – Project timelines
•
•
Money raised will provide working capital to cover ongoing exploration efforts across Victoria and Queensland.
•
Triumph becomes flagship project
•
Victorian exploration will continue with focus on Central Victorian Gold
The Company is actively seeking Partnerships and Investment or Divestment opportunities across the Eastern States of Australia to
improve the prospectivity of our Projects and tenement holdings.
Project Timelines
Rushworth Drilling
Triumph Project acquistion Completion
Triumph Resource Model Update
Triumph Diamond Drilling
Resource Classification Upgrade Driling
Resource Expansion
Existing Exploration Target Follow Up drilling
Greenfields Exploration Targeting
Project Meters
1,500
September
October November December
January
February
March
April
4,500
900
1800
900
900
13
ASX:DTM
FIELD IMAGES
14
ASX:DTM
DISCLAIMER
The information contained in this presentation is for informational purposes only and does not constitute an offer to issue, or arrange to
issue, securities or other financial products. The information contained in this presentation in not investment or financial product advice
and is not intended to be used as the basis for making investment decisions. The presentation has been prepared without taking into
account the investment objectives, financial situation or particular needs of any particular person. Before making an investment decision,
you should consider, with or without the assistance of a financial advisor, whether an investment is appropriate in light of your particular
investment needs, objectives and financial circumstances.
No representation or warranty, express or implied, is made as to the fairness, accuracy, completeness or correctness of the information,
opinions and conclusions contained in this presentation. To the maximum extent permitted by law, none of Dart Mining NL, their directors,
employees or agents, nor any other person accepts any liability, including, without limitation, any liability arising out of fault of negligence,
for any loss arising from the use of the information contained in this presentation. In particular, no representation or warranty, express or
implied is given as to the accuracy, completeness or correctness, likelihood of achievement or reasonableness or any forecasts, prospects
or returns contained in this presentation nor is any obligation assumed to update such information. Such forecasts, prospects or returns
are by their nature subject to significant uncertainties and contingencies.
15
ASX:DTM
Share your feedback
Discover