Triumph Drilling Commences
Released
Released
Announcement PDF
ASX Release
2 December 2024
COMMENCEMENT OF MAJOR DIAMOND DRILLING PROGRAM
AT THE TRIUMPH GOLD PROJECT IN CENTRAL QUEENSLAND
HIGHLIGHTS
•
Commencement of extensive diamond drilling program with Dart owned diamond drill rig on
site 29th November.
•
•
The large-scale diamond drilling program is intended to run until September 2025.
The program will initially focus on extending the existing 118,000oz @ 2.03g/t Au JORC 2012
gold resource announced by previous owners Sunshine Metals (ASX: SHN March 2022).
• Drilling of this Intrusion Related Gold System (IRGS) begins at the Constitution prospect with
resource extension and infill drilling.
Previous intercepts include:
▪ TDH056 – 10.0m @ 26.9 g/t Au from 51m (ASX: MBK Sept 2016)
▪ 21NCRC008 - 6.0m @ 13.1g/t Au from 96m (ASX: SHN March 2021)
• Resource extension drilling will progress to resource growth targets at Bald Hill East, Advance,
and Brigham Young prospects.
•
Resource extension drilling will take place at Big Hans and Super Hans. Dart Geologists have
interpreted that the mineralised zones are significantly larger than the size of the current
Resource footprint (see ASX: DTM release dated 14th October 2024).
•
Figure 1 – Dart owned Alton Diamond drill rig on site at the Triumph Gold Project
Dart Mining NL
ABN: 84 119 904 880
Level 6, 412 Collins Street
Melbourne VIC 3000
Contact: James Chirnside
Email: jchirnside@dartmining.com.au
Mobile: +61 447 447 613
Webpage: www.dartmining.com.au
LinkedIn: Dart Mining NL
Twitter: @DartMining
1|Page
Dart Mining is pleased to announce commencement of an initial ~7,000m diamond drilling at its
Triumph Gold Project after the rig arrived on-site on 29 November. Dart’s accommodation camp is
in place at site with establishment works almost complete.
Dart Mining geologists have been working on the drill location planning for some time to firstly aim
at extending the size of known resource area at Constitution and gain structural information from
the inflexion zone where New Constitution and South Constitution intersect (Figures 2, 3 and 4).
Diamond core should allow Dart to obtain a better structural understanding of the multiple
mineralised sulphide-quartz-calcite lodes and the degree of continuity or anastomosing present at
Constitution.
Up to nine lodes are interpreted to exist in the mineralised corridor over a strike of 700m and width
up to 80m (open in every direction and at depth). Existing drilling is biased 10:1 to RC and structural
interpretation of oriented core is warranted to understand the controls on these veins. This could
lead to unlocking high grade ‘shoots’ or zones within the mineralized corridor, which can be applied
elsewhere at Triumph.
Figure 2 – Schematic cross section showing multiple veins at New Constitution. Red is the new interpretation from
additional drilling data. Grey is the current Mineral Resource Estimate (MRE) blocks. Yellow and pink are open pit
projections based upon existing MRE.
Drilling at Constitution will be followed by drilling at Bald Hill with the aim of extending the JORC
Resource eastwards over the Bald Hill East zone (Figure 5). The third target will be the Advance mine
area (Figure 5). Advance was the deepest historic gold mine in the area (122m) and one of the more
significant historic producers with 3m @ 24.9g/t gold the best drill intercept to date (ASX: MBK Feb 2018).
Dart Mining’s Chairman, James Chirnside, commented: “The commencement of our first drilling
program since acquiring the Triumph Gold Project marks a significant step for the company. It is the
first exploration project work undertaken by Dart outside of Victoria. Triumph has a significant JORC
resource of 118,000oz Gold and is advanced in terms of exploration work completed. Initial drilling
will focus on resource expansion and upgrade, with more exploratory drilling across the lease area
as the drill program develops. We look forward to updating shareholders on our drilling and broader
exploration progress through 2025.”
2|Page
TRIUMPH GOLD PROJECT DIAMOND DRILLING PROGRAM
Review work has focused on exploration data, previous geological studies and the mineral systems
model of the project. Work to date has highlighted several significant areas of opportunity at the
project from resource extension through to exploration targets. Limited drilling at depth has limited
the existing resources to shallow levels, limited drilling along strike has likewise reduced the pit end
wall cut-back options thereby limiting the available resource.
RESOURCE EXPANSION TARGETS
Constitution mineralised zone (Figures 2, 3 and 4)
•
•
Infill and extend South Constitution zone (90kt @ 1.80g/t Au for 5,200oz (ASX: SHN March 2022)) into
New Constitution resource (600kt @ 1.98g/t Au for 38,285oz (ASX: SHN March 2022)) and target
additional footwall vein opportunities (Figure 3 and 4)
Aiming to confirm structural control and vein orientation for consistent linking of mineralised
domains
o Drill targeting infill around:
▪ TDH056 – 10.0m @ 26.9 g/t Au from 51m (ASX: MBK Sept 2016)
▪ 21NCRC008 - 6.0m @ 13.1g/t Au from 96m (ASX: SHN March 2021)
▪ 21SCRC006 – 11.0m @ 3.2 g/t Au from 31m (ASX: SHN Feb 2021)
• Inc 8m @ 4.3g/t Au
▪ 21NCRC001 - 3.0m @ 2.5g/t Au from 80m (ASX: SHN March 2021)
Figure 3: Planned drilling at Constitution prospect and Brigham Young – Priority 1 holes are the initial focus for Dart’s
diamond drilling in December 2024 and early 2025
3|Page
Figure 4: Long section showing planned initial drilling at the New Constitution resource zone
Eastern Extension of Bald Hill Resource
Extend the Bald Hill resource (311kt @ 1.08g/t Au for 18koz (ASX: SHN March 2022)) with the aim to
deliver a JORC compliant resource at Bald Hill East
o
Drilling to expand along strike to the east (Figure 5)
o
13 holes with 414m of drilling completed previously.
o
Highlights of previous drilling include:
▪ TDH229 - 2.0m @ 14.9g/t Au from 43m (ASX: MBK June 2018)
• Inc 1.0m @ 26.7g/t Au
▪ 23TRRC034 – 2.0m @ 7.5g/t Au from 42m (ASX: SHN June 2023)
▪ 23TRRC031 – 2.0m @ 3.4g/t Au from 61m (ASX: SHN June 2023)
Figure 5: Triumph Northern Exploration Opportunities at Bald Hill East and the Advance mine
4|Page
GREENFIELD/BROWNFIELD TARGETS
Advance Mine Target (Figure 5)
o Deepest historic mine on the property – structural control of mineralisation not obvious from
limited drilling to date
o 1,777m drilled across 67 holes averaging 26.5m drilled depth, only 4 holes greater than 50m
depth
Highlights of drilling include:
▪ TDH155 – 3.0m @ 24.9g/t Au from 17m (inc. 1.0m @ 69.8g/t Au) (ASX: MBK Feb 2018)
▪ TDH206 – 1.0m @ 45.5g/t Au from 28m (ASX: MBK April 2018)
▪ TDH212 - 3.0m @ 9.7g/t Au (inc. 1.0m @ 27.4 g/t Au) (ASX: MBK April 2018)
• Underexplored Brigham Young target zone (Figure 3)
o First highlighted for Metal Bank by Dr. Gregg Morrison as an early obvious target
o Only 10 shallow RC holes and 2 deep Diamond holes with less than 1,000m drilled Highlights
of drilling include:
▪ TDH001 - 6.0m 3.9g/t Au from 188m (inc. 1m @ 21.5g/t Au) (Roar Resources 2012 annual
report)
▪
▪
▪
▪
TDH107 – (ASX: MBK Mar 2017)
• 1.0m @ 20.4g/t Au from 265m
• 2.0m @ 6.2g/t Au from 299m
• 1.0m @ 5.4g/t Au from 298m
TDH214 - 2.0m @ 8.9g/t Au from 19m (ASX: MBK April 2018)
21GARC004 – 1.0m @ 6.4g/t Au from 69 meters (ASX: SHN Mar 2021)
TDH083 – 1.0m @ 5.4g/t Au from 34m
CONCEPTUAL EXPLORATION TARGETS
The Triumph Gold Project has had a significant amount of surface and near surface evaluation
completed, which has resulted in the discovery of the high-grade resource areas. The sampling has
also provided a rich dataset for assessment and has enabled the previous owners to develop a strong
predictive exploration model for the project. This predictive model suggests the likely presence of
large scale, bulk tonnage targets within geochemical halo’s present in several areas at Triumph.
Recent work has focused on resource development drilling, leaving the large scale, bulk tonnage
targets relatively untested. The Company's ability to conduct low-cost diamond drilling, using our
own drill rigs, and the significant dataset compiled during previous work inclusive of targeting and
resource establishment, places the Company in a good position to efficiently test the prospective
bulk tonnage targets.
Results from early target testing completed by Metal Bank resulted in several wide zones of
mineralisation intersected across the regional predictive model targets. Highlights from Metal Bank
ASX release August 2018 (Figure 6 (ASX: MBK August 2018)). The Company intends to follow up on the
identified regional gold zones within the Tonalite host rocks surrounding the defined resource areas.
5|Page
Figure 6: Bulk Tonnage targeting from Metal Bank ASX Release August 2018 (ASX: MBK August 2018)
NEXT STEPS
At the Triumph Gold Project, Dart Mining intends to:
• Finalise the acquisition and transfer of tenements under the terms of the acquisition
agreement, expected in December 2024;
• Update the Mineral Resource Estimate (MRE), intended for ASX release early February 2025;
• Diamond drilling programme to expand the existing resources along strike and at depth in
accordance with Table 1 below;
• Undertake regional exploration, targeting the project area, as well as testing bulk tonnage
targets;
• Continue to review and identify additional prospective target zones for exploration at
Triumph in addition to existing resource areas; and
• Continue to review and identify further advanced projects throughout Central Queensland
for potential acquisition.
6|Page
•
Consider existing project divestments and rationalisation throughout 2025
Table 1 – Project timelines assuming a single rig only
Approved for release by the Board of Directors.
For more information contact:
James Chirnside
Managing Director
Dart Mining NL
jchirnside@dartmining.com.au
+61 447 447 613
Aimee Coates
Investor Relations
Dart Mining NL
acoates@dartmining.com.au
About Dart Mining
The Triumph Gold Project is Dart’s first step into an advanced intrusion related gold system project in
Queensland. Dart will look to develop a regional presence in Queensland through advanced stage intrusion
related and epithermal gold projects. Dart Mining will continue to evaluate several historic goldfields in
Central and Northeast Victoria including the Rushworth Goldfield and the new porphyry and lithium province
in Northeast Victoria identified by Dart. The area is prospective for precious, base, and strategic metals. Dart
Mining has built a strategic and highly prospective gold exploration portfolio in Central and Northeast regions
of Victoria, where historic surface and alluvial gold mining indicates the existence of potentially large gold
endowment.
Competent Person’s Statement
The information in this report has been prepared, compiled, and verified by Mr. Owen Greenberger (B.Sc.
Geology), a Competent Person who is a Member of the Australian Institute of Geoscientists. Mr. Greenberger
is Head of Exploration for Dart Mining. Mr. Greenberger has sufficient experience that is relevant to the style
of mineralisation and type of deposits under consideration and to the activity being undertaken to qualify as
a competent person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves”. Mr. Greenberger consents to the inclusion in the report of the
matters based on his information in the form and context in which it appears.
7|Page
Forward-Looking Statement
Certain statements contained in this document constitute forward-looking statements. Forward-looking
statements include, but are not limited to, Dart Mining’s current expectations, estimates and projections
about the industry in which Dart Mining operates, and beliefs and assumptions regarding Dart Mining’s future
performance. Such forward-looking statements are based on a number of estimates and assumptions made
by the Company and its consultants in light of experience, current conditions and expectations of future
developments which the Company believes are appropriate in the current circumstances. When used in this
document, words such as; “anticipate”, “could”, “intends”, “estimate”, “potential”, “plan”, “seeks”, “may”,
“should”, and similar expressions are forward-looking statements. Although Dart Mining believes that its
expectations presented in these forward-looking statements are reasonable, such statements are subject to
known and unknown risks, uncertainties and other factors, which may cause the actual results, achievements
and performance of the Company to be materially different from the future results and achievements
expressed or implied by such forward-looking statements. Investors are cautioned that forward-looking
information is no guarantee of future performance and accordingly, investors are cautioned not to place
undue reliance on these forward-looking statements.
8|Page
APPENDIX ONE
THE TRIUMPH GOLD PROJECT
The Triumph Gold Project (Triumph or Project) is located approximately 520km by road north of
Brisbane, Queensland, and is well serviced by the coastal port city of Gladstone 80km by road to the
north. The Project is comprised of two Exploration Permits: EPM 18486 and EPM 19343 covering an
area of 137.6 sq.km or 43 sub-blocks in total. The Company has recently applied for additional area
immediately adjacent east of the triumph project with EMP 29097.
Figure 7: Location of the Triumph Gold Project
Geology
The Triumph Gold Project is located in the Yarrol belt of the Wandilla Province (New England
Orogen), where late Permian to Middle Triassic leucocratic intrusives are scattered throughout
Devonian and Carboniferous sediments. Known mineralisation at Triumph is located within one of
these intrusive bodies, the Norton Tonalite.
The Norton Tonalite is dissected by numerous brittle faults and shears, as well as common minor
mafic intrusive dykes of dolerite to basaltic composition. There is a distinct magnetic low signature
at the core of the Norton Tonalite which is yet to be drill tested (ASX SHN: Robust Maiden Resource at Triumph
Gold Project (31 March 2022)).
Structure
The Norton Tonalite is sinistrally offset by 1.8km by the northwest-trending Norton Fault, which can
be traced for over 28km. Initially thought to post date mineralisation, a single drill hole has
intersected the interpreted Norton Fault which returned 1m @ 2.9g/t Au and 1m @ 2.2g/t Au (ASX
MKB: Triumph Gold Project Update Amended (25 July 2014) indicating that the fault may have been active during
the main gold mineralisation event.
On a local scale the Norton Tonalite has two distinct fracture orientations that both host gold
mineralisation. One fracture set is approximately east-west striking and the other is northwestsoutheast striking. These fracture orientations are likely to have formed contemporaneously (ASX
SHN: Robust Maiden Resource at Triumph Gold Project (31 March 2022)).
Page | 9
Mineralisation
Gold and silver mineralisation is hosted in quartz-sulphide veins with pyrite and arsenopyrite
forming the bulk of the sulphide. Calcite is abundant in some lodes and present in most or all of
them. Veins typically show sericite-chlorite alteration halos although this appears to be more
associated with quartz veining rather than sulphides. Mineralisation at Triumph is interpreted as an
intrusion related gold system (IRGS) (ASX SHN: Robust Maiden Resource at Triumph Gold Project (31 March 2022)).
Morrison (Intrusion-Related Gold Deposits in North Queensland, GSQ Project final meeting 7 December, 2017) stated
that there were over 130 known IRGS in Queensland with 17 of these having resources over 1 million
ounces. Sunshine have stated that Triumph is analogous to the Ravenswood IRGS gold deposit which
has an endowment in excess of 5 million ounces of gold (ASX SHN: Follow Up Drilling at Liontown (19 June 2024)).
Existing Resource Highlights
The Project is located across the historic Norton Goldfield and has a current JORC (2012) Mineral
Resource Estimate prepared over five prospects in close proximity: Inferred gold resource of
118,000 oz made up of 1,808,000 tonnes at a grade of 2.0g/t gold using a 1g/t cut-off (ASX SHN: Robust
Maiden Resource at Triumph Gold Project (31 March 2022)).
More than 85% of the Triumph Inferred resource is within 100m of the surface and largely located
within 1.2km of strike within a 6km long structural corridor (ASX SHN: Follow Up Drilling at Liontown (19 June
2024)).
Dart considers that there is potential for proving up mineralisation below current drilling and open
pit depths that may result in underground mining options subject to favourable economic studies.
Table 2: Mineral Resource Estimate – Triumph Gold Project above a 1g/t cut-off grade ((ASX SHN:
Robust Maiden Resource at Triumph Gold Project (31 March 2022)).
Existing drill intercept highlights are shown on Figure 8 for the Southern Mineralised Corridor
including the Super Hans, Big Hans, New Constitution and South Constitution resource blocks.
Existing drill intercept highlights are shown on Figure 10 for the Northern Mineralised Corridor
including the Bald Hill resource block and historic Advance mine area.
10 | P a g e
Figure 8 – Existing drill intercept highlights for the Southern Mineralised Corridor including (east to west) the Super
Hans, Big Hans, New Constitution and South Constitution resource blocks.
Figure 9 – Schematic model of Big Hans resource showing the
multiple veins and anastomosing nature.
Big Hans schematic model (Figure 9) illustrates why diamond core should allow Dart to obtain a
better understanding of the multiple mineralised sulphide-quartz-calcite lodes and the degree of
continuity or anastomosing present at Triumph. Existing drilling is biased 10:1 to RC and structural
interpretation of oriented core is warranted to understand the controls on these veins. This could
lead to unlocking high grade ‘shoots’ or zones within the mineralized corridor, which can be applied
elsewhere at Triumph.
11 | P a g e
Figure 10 - Existing drill intercept highlights the Northern Mineralised Corridor including the Bald Hill resource block,
Bald Hill East and historic Advance mine area.
12 | P a g e
Share your feedback