DART MINING OPERATIONS UPDATE
Dart Mining NL (“Dart” or the “Company”) is pleased to provide an update on operational activities.
The company has also been busy drilling, mapping and sampling and assessing the prospectivity
of the Triumph Gold Project.
HIGHLIGHTS
•
5 diamond drill holes now completed at Triumph Gold Project with sulphide
mineralisation and alteration intersected within all 5 holes.
•
5,000m of RC Drilling program currently being planned at Triumph Gold Project to
complement the current 7,000m diamond drilling program.
•
Coonambula Antimony Gold Joint Venture due diligence now completed with initial
drilling program planned to commence in July 2025.
•
Additional soil sampling and rock chip analysis completed across the Dents and
Bonneville areas within the Triumph gold project highlighting new regions of potential
mineralisation to be followed up with RC drilling.
•
Successfully completed an investor roadshow across Melbourne, Sydney, Perth and
London.
•
Ongoing advanced discussions are progressing in relation to divestment of multiple
Victorian projects.
•
Assays from the first 10 diamond drill holes expected mid-late May 2025.
Dart’s Chairman, James Chirnside, commented: “The company is progressing activities on all
fronts. Drill meter rates have improved, and further drill planning is underway with an expansive
RC program being designed to accelerate exploration. Regional exploration activities and
targeting work across the Triumph gold project is delivering results and generating significant
additional drill targets. The company has been active with investor engagement as well as
corporate development activities. We are progressing discussions on several of our Victorian
portfolio assets, and have completed due diligence on the Coonambula project joint venture with
Great Divide Mining (ASX: GDM). We are looking forward to releasing assays from the first holes
in mid to late May.”
Dart Mining NL
ABN: 84 119 904 880
Level 6, 412 Collins Street
Melbourne VIC 3000
Contact: James Chirnside
Email: jchirnside@dartmining.com.au
Mobile: +61 447 447 613
Webpage: www.dartmining.com.au
LinkedIn: Dart Mining NL
Twitter: @DartMining
1|Page
DRILLING PROGRESS
Drilling continues to progress at the Constitution Prospects (New and South) at the Triumph gold
project.
A significant improvement in drilling rates occurred during March and is continuing into April.
Drill meters achieved per shift has steadily increased from approximately 15m to 20m per shift,
with the number of shifts spent drilling also increasing significantly.
Drilling has focused on the eastern extension of the New Constitution project, with 5 holes now
completed. Initial drilling observations confirm the mineralisation style interpreted to date. The
intercepted alteration and sulphide zones in the New Constitution area are conforming well with
interpreted wireframes from the March 2025 MRE. Of note are the new additional ore zones
have been intercepted further west as Dart’s west dipping drilling pushing past the existing MRE
boundary.
Some areas of structurally complexity in the drilling have been linked to larger amounts of Zn
sulphide (sphalerite). These Zn zones appear to be linked to potential cross cutting features. The
purpose of Dart committing to Diamond Drilling are for these aspects of unlocking the structural
complexity of the deposits.
Core recovery in the fresh material is excellent and outside of the structurally complex zones,
core is intact, and structural measurements are proving useful to hone in on the specifics on the
interpretation.
Drill planning is underway for additional RC drilling at Triumph accelerating progress on site. RC
drilling will focus on key resource expansion targets at Bald Hill, initial drill testing of emerging
shallow targets, and pre-collar work on selected regional deep drilling targets testing the depth
extension of existing resource areas and broad mineralisation zones identified through metal
zonation analysis of historic data.
Visual estimates of mineralisation abundance contained in this announcement should never be considered a proxy or substitute
for Laboratory analysis. Visual estimates potentially provide no information regarding concentration of economic grades or
factors, impurities or deleterious physical properties relevant to valuation.
2|Page
Figure 1: Surface map showing drilling collars and sampling locations across the Triumph Project.
3|Page
SURFACE MAPPING AND SAMPLING
Surface sampling across the Dents and Bonneville historic mining areas has been completed
during March. Sampling is looking to understand mineralisation potential of historically mined
veins at Dents and veins within the Bonneville region. Sampling will help to assist in identifying
mineral zonation of veins and subsequent gold mineralisation potential of the prospects. Sample
details are provided in Appendix One, Table 1 below, with locations shown on Figure 1.
Dart geologists have located promising sulphide rich parallel quartz veins at the historic Dent’s
gold mine approximately 900m SW of the New Constitution Prospect (Figure 1). Three parallel
veins 0.5-1.0m were located within close proximity with further narrow veins, some with old
workings, located 150m south of the zone.
The nature of the quartz and sulphides indicates that veins are distal to an intrusion related
source in the tonalite and would appear be the upper most zone of possible gold mineralisation.
Figure 2: Sulphides in quartz from sample DRC006, abundant pyrite and arsenopyrite. Small
quantities of stibnite was tentatively identified and is subject to confirmation by assay.
Visual estimates of mineralisation abundance contained in this announcement should never be considered a proxy or substitute
for Laboratory analysis. Visual estimates potentially provide no information regarding concentration of economic grades or
factors, impurities or deleterious physical properties relevant to valuation.
4|Page
Dent’s mine has a single five ton trial crushing reported (L. Ball 1905) yielding 1oz gold and 32oz
silver per ton. The three larger veins observed had evidence of significant sulphide with workings
only located on the southern vein where Dent’s historic mine is believed to be.
Figure 3: Dart Geologists on site at Dents historic waste rock pile.
NEXT STEPS
At the Triumph Project, Dart Mining intends to:
•
Finalise and interpret logging and assays of the first 10 holes of drilling, with results
expected to be released mid to late May 2025
•
Finalise RC drill planning and Contractor engagement for proposed 5,000m of drilling,
looking to commence mid-year
Continue improvement of Diamond Drilling rates and costs.
Progress regional exploration activities including ongoing research, mapping and
sampling of prospective targets
Undertake further target generation work utilising the expansive, high quality geological
datasets that exist.
•
•
•
5|Page
Approved for release by the Board of Directors.
For more information contact:
James Chirnside
Managing Director
Dart Mining NL
jchirnside@dartmining.com.au
+61 447 447 613
Owen Greenberger
Head of Exploration
Dart Mining NL
ogreenberger@dartmining.com.au
+61 448 031 319
About Dart Mining
In December 2024 Dart Mining (ASX:DTM) completed the acquisition of the Triumph Gold Project,
this is Dart’s first step into an advanced intrusion related gold system project in Queensland. Dart
will look to develop a regional presence in Queensland through advanced stage intrusion related and
epithermal gold projects. On 4 March 2025 Dart announced an upgraded JORC (2012) compliant
MRE for Triumph of 2.16Mt @ 2.17g/t Au for 150koz gold at a 1g/t Au cut-off.
Dart Mining will continue to evaluate several historic goldfields in Central and Northeast Victoria
including the Rushworth Goldfield and the new porphyry and lithium province in Northeast Victoria
identified by Dart.
Competent Person’s Statement
The information in this report has been prepared, compiled, and verified by Mr. Owen Greenberger (B.Sc.
Geology), a Competent Person who is a Member of the Australian Institute of Geoscientists. Mr.
Greenberger is Head of Exploration for Dart Mining. Mr. Greenberger has sufficient experience that is
relevant to the style of mineralisation and type of deposits under consideration and to the activity being
undertaken to qualify as a competent person as defined in the 2012 Edition of the “Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr. Greenberger consents to the
inclusion in the report of the matters based on his information in the form and context in which it appears.
Forward-Looking Statement
Certain statements contained in this document constitute forward-looking statements. Forward-looking
statements include, but are not limited to, Dart Mining’s current expectations, estimates and projections
about the industry in which Dart Mining operates, and beliefs and assumptions regarding Dart Mining’s
future performance. Such forward-looking statements are based on a number of estimates and
assumptions made by the Company and its consultants in light of experience, current conditions and
expectations of future developments which the Company believes are appropriate in the current
circumstances. When used in this document, words such as; “anticipate”, “could”, “intends”, “estimate”,
“potential”, “plan”, “seeks”, “may”, “should”, and similar expressions are forward-looking statements.
Although Dart Mining believes that its expectations presented in these forward-looking statements are
reasonable, such statements are subject to known and unknown risks, uncertainties and other factors,
which may cause the actual results, achievements and performance of the Company to be materially
different from the future results and achievements expressed or implied by such forward-looking
statements. Investors are cautioned that forward-looking information is no guarantee of future
performance and accordingly, investors are cautioned not to place undue reliance on these forwardlooking statements.
6|Page
APPENIDX ONE:
Table 1: Sampling details and locations.
Sample ID
DRC001
DRC002
DRC003
DRC005
DRC006
DRC007
DRC008
SRC001
RJRC001
RJRC002
RJRC003
RJRC004
RJRC005
RJRC006
Easting GDA 94
Northing GDA 94
(MGA Zone 56)
(MGA Zone 56)
333200.5
7308154.4
333239.5
7308237.4
333508.4
7308310.5
333524.5
7308487.7
333515.6
7308424.6
333515.6
7308424.6
333515.6
7308424.6
335414.4
7307751.2
334881.4
7311600.5
334017.2
7311196.6
334001.5
7311183.4
334106.5
7311131.0
335051.5
7311270.4
335268.1
7311094.6
Description
Tonalite-Hornfels margin sampling, Quartz Brecchia ~ 0.2m wide
Tonalite-Hornfels margin sampling, Quartz Brecchia ~ 0.2m wide
QV sampled from shallow pit south of main Dents pit
QV North of main Dents pit
Dents sulphide shaft
Dents sulphide shaft
Dents sulphide shaft
Fri, 21 Mar, 2025 src001
Vein in TON in gully with weathered sulphides. ~30mm wide Striking 120 deg.
Qtz float with FeOX
Qtz float with FeOX next to small trench striking 270 deg
Qtz veins in TON with FeOX. Striking 300 deg
Qtz veins in TON with FeOX. ~40mm wide triking 140 deg.
Qtz and partially weathered sulphide in mullock next to shaft.
Table 2: Drilling collars
Drill Hole
Name
TRDD001
TRDD001A
TRDD002
TRDD002A
TRDD003
TRDD004
TRDD005
TRDD006
Easting GDA 94
Northing GDA 94
(MGA Zone 56
(MGA Zone 56)
RL
334302.3
7308948.5
334293.9
7308955.0
334276.8
7308974.4
334274.8
7308972.6
334435.5
7308650.3
334691.8
7308649.4
334376.3
7308716.9
334383.8
7308993.1
155.05
155.05
152.64
152.64
167
171
149
160
Depth (m)
32.2
147.8
47.2
128.6
185.4
122.3
161
180
Azimuth
Dip
210
210
210
210
40
185
40
220
-55
-55
-55
-55
-55
-55
-55
-55
7|Page
APPENDIX TWO
JORC Code, 2012 Edition – Table 1 report template
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Sampling
techniques
• Nature and quality of sampling (eg cut channels, random chips, or
specific specialised industry standard measurement tools appropriate
to the minerals under investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc). These examples should
not be taken as limiting the broad meaning of sampling.
• Include reference to measures taken to ensure sample representivity
and the appropriate calibration of any measurement tools or systems
used.
• Aspects of the determination of mineralisation that are Material to the
Public Report.
• In cases where ‘industry standard’ work has been done this would be
relatively simple (eg ‘reverse circulation drilling was used to obtain 1
m samples from which 3 kg was pulverised to produce a 30 g charge
for fire assay’). In other cases more explanation may be required,
such as where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types (eg
submarine nodules) may warrant disclosure of detailed information.
• Drill type (eg core, reverse circulation, open-hole hammer, rotary air
blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple
or standard tube, depth of diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by what method, etc).
• Method of recording and assessing core and chip sample recoveries
and results assessed.
• Measures taken to maximise sample recovery and ensure
representative nature of the samples.
• Whether a relationship exists between sample recovery and grade
and whether sample bias may have occurred due to preferential
loss/gain of fine/coarse material.
Drilling
techniques
Drill sample
recovery
Commentary
•
•
•
Rockchip samples were collected from identified outcrops using
rock hammers. The samples are between 0.5 and 2.0kg and
were collected in marked calico bags for assaying.
Rockchip samples were collected by hand and in several
locations and in some instances, multiple samples were
collected from a single outcrop to understand the variability of
the material.
Measurements of the apparent thickness of these outcrops are
reported in the announcement. These are apparent as the true
orientation of the outcrops are not fully known yet. The visual
estimates here are of the thickness of the outcrop only.
•
Standard tube HQ diamond drilling was utilised with bottom of
hole core orientation completed every run. An Axis orientation
tool was utilised.
•
Core recoveries for DD was recorded by measuring the total
amount of core between each core block. This was then
compared to the recovery noted on the core block by the driller
and any errors were rectified. The Rock Quality Designation
(RQD) value is calculated by summing the total length of core in
the run composed of pieces of core greater than 10 cm in
length. The recovery and RQD are both converted to a
8|Page
Criteria
JORC Code explanation
Commentary
percentage of the recovery during the data entry phase. At this
time, further geotechnical information is recorded such as
Longest Unbroken Piece (LUP) and Rock Strength. The LUP is
recorded as the longest piece of core within each block-to-block
interval. The Rock Strength class is recorded as an average, also
between core block to core block. Fracture count involved
counting individual fractures within a drill run. If the core was
crushed and fractures were too numerous to accurately count,
it was given the designation “999” which indicated a highly
fractured zone.
.
Logging
• Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical
studies.
• Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
• The total length and percentage of the relevant intersections logged.
Subsampling
techniques
and sample
preparation
• If core, whether cut or sawn and whether quarter, half or all core
taken.
• If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
• For all sample types, the nature, quality and appropriateness of the
sample preparation technique.
• Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
• Measures taken to ensure that the sampling is representative of the in
situ material collected, including for instance results for field
duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain size of the material
being sampled.
•
The drill core has been geologically and geotechnically logged to
a level to support appropriate mineral resource estimation,
mining studies and metallurgical studies. Core is logged both
qualitatively and quantitatively. Core and photography is
available.
• Rock chip sampling saw basic descriptions of the outcrops were
made in the field by Dart geologist which include observations
of minerals, oxidation, gossanous features, and orientation of
the outcropping units where possible. These logs are sufficient
to support the preliminary nature of assessing the outcrops.
ROCK CHIPS
• No field sub sampling has been undertaken on the samples.
Whole rocks were submitted to the laboratory for standard
crushing and pulverizing with the laboratory taking
representative sub-samples as required for analysis as per their
accredited protocols.
• The sampling technique is appropriate for the sample type and
material sampled. The rocks will be crushed to -2mm and then
pulverized to -75um for multi element acid digest and 50g fire
assay for gold analysis.
• Sub-sampling QAQC is not applicable to this announcement.
9|Page
Criteria
JORC Code explanation
Commentary
•
Samples are selectively taken from outcrops. The samples
represent rock chips that are of geological interest for a variety
of reasons including minerals, shape, colour and alteration
presented to the sampler. The sampling is not representative of
the entire outcrops intercepted in the field, but rather to
confirm if the outcrops are mineralised.
DIAMOND DRILL CORE
• Sample sizes are appropriate for the analysis proposed and the
master pulp after pulverization and initial analysis should be
sufficient for additional testing if required.
Quality of
assay data
and
laboratory
tests
Verification
of sampling
and
assaying
Location of
data points
• The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is considered
partial or total.
• For geophysical tools, spectrometers, handheld XRF instruments, etc,
the parameters used in determining the analysis including instrument
make and model, reading times, calibrations factors applied and their
derivation, etc.
• Nature of quality control procedures adopted (eg standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels
of accuracy (ie lack of bias) and precision have been established.
•
•
•
•
•
•
The verification of significant intersections by either independent
or alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
Discuss any adjustment to assay data.
Accuracy and quality of surveys used to locate drill holes (collar
and down-hole surveys), trenches, mine workings and other
locations used in Mineral Resource estimation.
Specification of the grid system used.
•
No results from sampling have been reported in this
announcement.
•
No results from sampling have been reported in this
announcement.
•
The location of drill hole collars and rock chip samples were
confirmed with a Trimble DA2 receiver and Catalyst 0.3m
Subscription set to MGA94 Grid Datum (Zone 56)
10 | P a g e
Criteria
JORC Code explanation
•
Quality and adequacy of topographic control.
Commentary
•
•
•
Data spacing
and
distribution
Orientation
of data in
relation to
geological
structure
•
•
•
•
•
Sample
security
•
Audits or
reviews
•
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
Whether sample compositing has been applied.
Whether the orientation of sampling achieves unbiased sampling
of possible structures and the extent to which this is known,
considering the deposit type.
If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to have
introduced a sampling bias, this should be assessed and
reported if material.
The measures taken to ensure sample security.
•
The results of any audits or reviews of sampling techniques and
data.
Accuracy is variable but is expected to be 0.3m
During the mapping and Collar pickup process with constant
visual quality assessment conducted, the receiver maintained
an accuracy level <0.4m.
Down hole, multi-shot surveys were taken at 15m then a
nominal 30 m interval where possible using a Trueshot survey
tool. A 3m multi-shot survey was conducted at end of hole.
No results from sampling have been reported in this
announcement.
•
Drilling is typically orientated perpendicular to the interpreted
strike of mineralization where possible.
•
No results from sampling have been reported in this
announcement.
•
No audits or reviews have been completed of sampling
techniques.
11 | P a g e
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
Mineral
tenement
and land
tenure status
JORC Code explanation
•
•
Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint
ventures, partnerships, overriding royalties, native title interests,
historical sites, wilderness or national park and environmental
settings.
The security of the tenure held at the time of reporting along with
any known impediments to obtaining a licence to operate in the
area.
Commentary
•
•
•
Exploration
done by
other parties
•
Acknowledgment and appraisal of exploration by other parties.
•
•
Geology
•
Deposit type, geological setting and style of mineralisation.
•
•
The Triumph project consists of EPM 18486 and EPM 19343,
both 100% owned by XXXX Gold Pty Ltd, a wholly owned
subsidiary of Sunshine Gold Limited. The tenements are in good
standing and no known impediments exist. Dart Mining NL has
completed the acquisition of these two tenements and the
process to transfer title is underway.
ML80035 (covering an area of 0.2km) is located within the
project area and is excluded from the tenure.
Exploration is prohibited within a small area of Category B
environmentally protected area as well as a National Park
shown in Figure 2. The current approved Environmental
Authority (EA) allows for advanced exploration activities to
occur up to the National Park (NP) boundary.
AMOCO conducted limited exploration focussing on the Bald
Hill vein in 1987. Seven RC holes were drilled at Bald Hill. The
bulk of exploration across the tenure has been conducted by
Metal Bank Limited and subsidiary Roar Resources between
2012 – 2020.
Historical Exploration data and production records were
compiled via open file reports accessible via the QLD Geological
Survey QDEX system (notably Ball. L.C. 1906. Report on the
Norton Goldfields, Queensland Geological Survey Publication
208).
EPM18486 and EPM19343 overlaps the Calliope and Miriam
Vale 1:100,000 map sheets.
The style of mineralisation intersected is interpreted to be
intrusion-related gold mineralisation within the northern New
England Orogen.
12 | P a g e
Criteria
Drill hole
Information
JORC Code explanation
•
•
Data
aggregation
methods
•
•
•
Relationship
between
mineralisatio
n widths and
intercept
lengths
•
Diagrams
•
Balanced
reporting
•
•
•
A summary of all information material to the understanding of the
exploration results including a tabulation of the following
information for all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea
level in metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
If the exclusion of this information is justified on the basis that
the information is not Material and this exclusion does not
detract from the understanding of the report, the Competent
Person should clearly explain why this is the case.
In reporting Exploration Results, weighting averaging
techniques, maximum and/or minimum grade truncations (eg
cutting of high grades) and cut-off grades are usually Material
and should be stated.
Where aggregate intercepts incorporate short lengths of high
grade results and longer lengths of low grade results, the
procedure used for such aggregation should be stated and some
typical examples of such aggregations should be shown in detail.
The assumptions used for any reporting of metal equivalent
values should be clearly stated.
These relationships are particularly important in the reporting of
Exploration Results.
If the geometry of the mineralisation with respect to the drill hole
angle is known, its nature should be reported.
If it is not known and only the down hole lengths are reported,
there should be a clear statement to this effect (eg ‘down hole
length, true width not known’).
Appropriate maps and sections (with scales) and tabulations of
intercepts should be included for any significant discovery being
reported These should include, but not be limited to a plan view
of drill hole collar locations and appropriate sectional views.
Where comprehensive reporting of all Exploration Results is not
practicable, representative reporting of both low and high grades
and/or widths should be practiced to avoid misleading reporting
of Exploration Results.
Commentary
•
Drillhole information has been included in the release in
Appendix 1.
•
No data aggregation methods have been applied.
•
Mineralisation widths are reported as the downhole length. Final
interpretation and inclusion of sample results will allow for true
width calculations to be applied.
•
Included in the body of the announcement.
•
All mineralisaiton intersected in completed holes has been
included
13 | P a g e
Criteria
JORC Code explanation
Other
substantive
exploration
data
•
Further work
•
•
Other exploration data, if meaningful and material, should be
reported including (but not limited to): geological observations;
geophysical survey results; geochemical survey results; bulk
samples – size and method of treatment; metallurgical test
results; bulk density, groundwater, geotechnical and rock
characteristics; potential deleterious or contaminating
substances.
The nature and scale of planned further work (eg tests for lateral
extensions or depth extensions or large-scale step-out drilling).
Diagrams clearly highlighting the areas of possible extensions,
including the main geological interpretations and future drilling
areas, provided this information is not commercially sensitive.
Commentary
•
No other material data is presented in this announcement.
•
Plans for further work are outlined in the body of the
announcement which include analysis of the rock chips and
considerations for drill targeting.
14 | P a g e