GDM: High-Grade Antimony and Gold at Coonambula
Released
Released
Announcement PDF
Great Divide Mining Ltd
ACN 655 868 803
GPO Box 154 Brisbane QLD 4001
greatdividemining.com.au
ASX Release
10 October 2025
High-Grade Antimony and Gold Confirm Prospectivity at Coonambula
Great Divide Mining Limited (ASX: GDM) (“GDM” or “the Company”) is pleased to note the
announcement by its Farm-In Joint Venture partner, Dart Mining NL (ASX: DTM), reporting
outstanding surface sampling results from the Coonambula Antimony-Gold Project in Central
Queensland.
Surface and in-situ sampling conducted by Dart Mining across the historic Banshee Mine area
returned exceptionally high grades including:
• Antimony (Sb) up to 65.3 %
• Gold (Au) up to 17.0 g/t
• Silver (Ag) up to 97.9 g/t
These are the highest gold, silver and antimony grades reported to date from the Banshee Mine,
significantly enhancing confidence in the project’s scale and potential.
GDM Managing Director Justin Haines said the results validated the Company’s exploration model
and timing of the Dart Mining farm-in:
“The Coonambula Project continues to demonstrate why GDM secured this position early. These
grades confirm the potential for a high-value antimony-gold system and further strengthen the case
for accelerated drilling across the Banshee trend.”
Dart Mining has commenced its initial drilling program at Coonambula using its in-house rig,
designed to infill existing high-grade intersections and advance toward a JORC-compliant Antimony-
Gold Resource.
Under the Joint Venture Agreement with GDM, Dart Mining may earn up to a 51 % interest in the
Coonambula Project, across its’ six tenements, by completing defined drilling and reporting
milestones over a two-year period. Dart has acquired an initial 15 % interest having paid an
amount of $250,000 to GDM and now has obligations to complete at least 4,000 m of drilling and
deliver two geological/resource reports to reach the 51 % ownership.
Dart has been appointed Manager of the JV during the earn-in, whilst GDM retains the tenement
ownership and a carried interest through the early exploration phases.
Coonambula is located approximately 70 km southeast of Evolution Mining’s Cracow gold mine and
25 km southwest of Eidsvold. The Project is currently held 100 % by GDM subsidiaries GDM
Coonambula Pty Ltd and GDM Yellow Jack Pty Ltd.
For full sampling and assay details, please refer to Dart Mining’s ASX announcement dated 8
October 2025 titled “Outstanding Antimony and Gold Results from Surface Rock Chip Sampling at
Coonambula.”
2
Figure 1 Massive Stibnite from sample BSE04 returning 55.5% Sb
ASX release authorised by the Board of Great Divide Mining Ltd.
For further information:
Justin Haines
Chief Executive Officer
e: justin.haines@greatdividemining.com.au
About Great Divide Mining Ltd (ASX: GDM)
Great Divide Mining is a Gold, Antimony and critical metals miner, explorer and developer with five projects
across 17 tenements (including two in application). GDM’s focus is on operating producing assets within areas
of historical mining and past exploration with nearby infrastructure, thus enabling rapid development.
Through a staged exploration and development programme, GDM intends to generate cash flow from its initial
projects to support further exploration across its portfolio of highly prospective tenements.
Competent Person’s Statement
The information in this report has been prepared, compiled, and verified by Mr. Owen Greenberger (B.Sc.
Geology), a Competent Person who is a Member of the Australian Institute of Geoscientists. Mr. Greenberger
is Head of Exploration for Dart Mining. Mr. Greenberger has sufficient experience that is relevant to the style
of mineralisation and type of deposits under consideration and to the activity being undertaken to qualify as
a competent person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves”. Mr. Greenberger takes responsibility for the exploration
results, and consents to the inclusion in the report of the matters based on his information in the form and
context in which it appears.
3
Forward-Looking Statements
This announcement may contain forward-looking information about the Company and its operations. In
certain cases, forward-looking information may be identified by such terms as "anticipates", "believes",
“should”, "could", "estimates", “target”, “likely”, “plan”, "expects", "may", “intend”, "shall", "will", or "would".
These statements are based on information currently available to the Company and the Company provides no
assurance that actual results will meet management's expectations. Forward-looking statements are subject
to risk factors associated with the Company’s business, many of which are beyond the control of the Company.
It is believed that the expectations reflected in these statements are reasonable, but they may be affected by
a variety of variables and changes in underlying assumptions which could cause actual results or trends to
differ materially from those expressed or implied in such statements. There can be no assurance that actual
outcomes will not differ materially from these statements.
4
Appendix 1
Table 1: Sample Details
Sample ID
Easting
GDA 94
(MGA Zone 56)
Northing
GDA 94
(MGA
Zone 56)
Sample Description
BSE01 291892 7173959 Float grab sample
BSE02 292122 7173971 Float grab sample
BSE03 292028 7173932 Float grab sample
BSE04 291923 7173936 Float grab sample
BSE05 292041 7173909 Float grab sample
BSE06 292096 7173907 Mullock grab sample
BSE07 292047 7173891 In situ quartz vein with Sb ~30-100mm
BSE08 292049 7173892 In situ quartz vein with Sb ~30-100mm
BSE09 292049 7173889 In situ quartz vein with Sb ~30mm
5
Appendix 2
JORC Code, 2012 Edition – Table 1 report template
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, or handheld
XRF instruments, etc). These examples
should not be taken as limiting the broad
meaning of sampling.
• Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any
measurement tools or systems used.
• Aspects of the determination of
mineralisation that are Material to the
Public Report.
• In cases where ‘industry standard’ work
has been done this would be relatively
simple (eg ‘reverse circulation drilling was
used to obtain 1 m samples from which 3
kg was pulverised to produce a 30 g
charge for fire assay’). In other cases
more explanation may be required, such
as where there is coarse gold that has
inherent sampling problems. Unusual
commodities or mineralisation types (eg
submarine nodules) may warrant
disclosure of detailed information.
• Rockchip samples were collected from
identified outcrops using rock hammers.
Float samples were collected at the
location they’re found. The float
samples were typically close to existing
trenches or workings. The samples are
between 0.5 and 2.0kg and were
collected in marked calico bags for
assaying.
• Rockchip samples were collected by
hand and in several locations and in
some instances, multiple samples were
collected from a single outcrop to
understand the variability of the
material.
• Measurements of the apparent
thickness of these outcrops are reported
in the announcement. These are
apparent as the true orientation of the
outcrops are not fully known yet where
outcrop has been sampled. The visual
estimates here are of the thickness of
the outcrop only.
Drilling
techniques
• Drill type (eg core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details (eg
core diameter, triple or standard tube,
depth of diamond tails, face-sampling bit
or other type, whether core is oriented
and if so, by what method, etc).
• No drilling results are reported and is not
applicable.
Drill
sample
recovery
• Method of recording and assessing core
and chip sample recoveries and results
assessed.
• Measures taken to maximise sample
recovery and ensure representative
nature of the samples.
• Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse
material.
• No drilling results are reported and is not
applicable.
Logging • Whether core and chip samples have
been geologically and geotechnically
• Basic descriptions of the outcrops were
6
Criteria JORC Code explanation Commentary
logged to a level of detail to support
appropriate Mineral Resource estimation,
mining studies and metallurgical studies.
• Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.
• The total length and percentage of the
relevant intersections logged.
made in the field by Dart geologist
which include observations of minerals,
oxidation, gossanous features, and
orientation of the outcropping units
where possible. These logs are sufficient
to support the preliminary nature of
assessing the outcrops.
• The logging is qualitative in nature of
the rock chip samples.
Sub-
sampling
techniques
and sample
preparation
• If core, whether cut or sawn and whether
quarter, half or all core taken.
• If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet
or dry.
• For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
• Quality control procedures adopted for all
sub-sampling stages to maximise
representivity of samples.
• Measures taken to ensure that the
sampling is representative of the in situ
material collected, including for instance
results for field duplicate/second-half
sampling.
• Whether sample sizes are appropriate to
the grain size of the material being
sampled.
• No field sub sampling has been
undertaken on the samples. Whole
rocks were submitted to the laboratory
for standard crushing and pulverizing
with the laboratory taking
representative sub-samples as required
for analysis as per their accredited
protocols.
• The sampling technique is appropriate
for the sample type and material
sampled. The rocks are crushed to -2mm
and then pulverized to -75um for multi
element acid digest and 50g fire assay
for gold analysis. Over range Sb is
analysed by XRF.
• Sub-sampling QAQC is not applicable to
this announcement.
• Samples are selectively taken from
outcrops or float material. The samples
represent rock chips that are of
geological interest for a variety of
reasons including minerals, shape,
colour and alteration presented to the
sampler. The sampling is not
representative of the entire outcrops
intercepted in the field, but rather to
confirm if the outcrops are mineralised
and confirm visual observations of
sulphides.
• Sample sizes are appropriate for the
analysis proposed and the master pulp
after pulverization and initial analysis
should be sufficient for additional
testing if required.
Quality of
assay data
and
laboratory
tests
• The nature, quality and appropriateness
of the assaying and laboratory
procedures used and whether the
technique is considered partial or total.
• For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
• Assay results and laboratory procedures
used are representative sub-samples of
the total sample mass and considered
suitable for rock chip samples.
• No independent quality control samples
were used considering these samples
7
Criteria JORC Code explanation Commentary
analysis including instrument make and
model, reading times, calibrations factors
applied and their derivation, etc.
• Nature of quality control procedures
adopted (eg standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (ie lack of bias) and precision
have been established.
represent initial reconnaissance
sampling. ALS Geochemistry routing
QAQC standards and blanks were
reported and within tolerances.
Verification
of
sampling
and
assaying
• The verification of significant
intersections by either independent or
alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data
entry procedures, data verification, data
storage (physical and electronic)
protocols.
• Discuss any adjustment to assay data.
• No drilling is defined in this
announcement.
• Logging and photographs of the samples
were completed by Dart’s experienced
field geologist. These photos were
reviewed by several geologists remotely,
including the Competent Person prior to
being submitted to the laboratory.
• No data entry is performed and upon
review of the samples spatially, they
reconcile with the planned coordinates
provided to the field team.
Location of
data points
• Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral Resource
estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic
control.
• The location of the samples were
recorded with a dGPS system.
• The grid system used is GDA94 MGA
Zone 56.
• Topographic control is not applicable
given the samples were collected from
outcrop.
Data
spacing
and
distribution
• Data spacing for reporting of Exploration
Results.
• Whether the data spacing and distribution
is sufficient to establish the degree of
geological and grade continuity
appropriate for the Mineral Resource and
Ore Reserve estimation procedure(s) and
classifications applied.
• Whether sample compositing has been
applied.
• The samples reported in this
announcement were collected randomly
from outcrop.
• No compositing has been applied.
Orientation
of data in
relation to
geological
structure
• Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
• If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material.
• The rockchip samples were collected at
the discretion of the field geologist on
site and are selective in nature.
• No drilling results are reported.
Sample
security
• The measures taken to ensure sample
security.
• Samples were kept in the custody of Dart
employees and delivered directly to ALS
Geochemistry in Brisbane.
8
Criteria JORC Code explanation Commentary
Audits or
reviews
• The results of any audits or reviews of
sampling techniques and data.
• No audits or reviews have been
completed of sampling techniques.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria JORC Code explanation Commentary
Mineral
tenement and
land tenure
status
• Type, reference name/number, location
and ownership including agreements or
material issues with third parties such
as joint ventures, partnerships,
overriding royalties, native title interests,
historical sites, wilderness or national
park and environmental settings.
• The security of the tenure held at the
time of reporting along with any known
impediments to obtaining a licence to
operate in the area.
• The Coonambula Project consists of six
contiguous Queensland exploration
permits for minerals (EPMs):
o EPM 15203 (Widbury),
o EPM 16216 (Lady Margaret),
o EPM 25260 (Coonambula),
o EPM 26743 (Eidsvold), and
o EPM 28433 (Coonambula
Extended).
• Each of the granted Coonambula
tenements is currently held 100% by
wholly owned subsidiaries of Great
Divide Mining Ltd (GDM), namely GDM
Coonambula Pty Ltd and GDM Yellow
Jack Pty Ltd. Dart Mining Ltd has a
joint venture agreement (Coonambula
Joint Venture) to complete exploration
works on the EPMs.
Exploration
done by other
parties
• Acknowledgment and appraisal of
exploration by other parties.
• The Coonambula Project consists of
six contiguous Queensland exploration
permits for minerals (EPMs):
• EPM 15203 (Widbury),
• EPM 16216 (Lady Margaret),
• EPM 25260 (Coonambula),
• EPM 26743 (Eidsvold), and
• EPM 28433 (Coonambula Extended).
• Each of the granted Coonambula
tenements is currently held 100% by
wholly owned subsidiaries of Great
Divide Mining Ltd (GDM), namely GDM
Coonambula Pty Ltd and GDM Yellow
Jack Pty Ltd. Dart Mining Ltd has a
joint venture agreement (Coonambula
Joint Venture) to complete exploration
works on the EPMs.
Geology • Deposit type, geological setting and
style of mineralisation.
• The Coonambula Project consists of
six contiguous Queensland exploration
permits for minerals (EPMs):
• EPM 15203 (Widbury),
• EPM 16216 (Lady Margaret),
• EPM 25260 (Coonambula),
9
Criteria JORC Code explanation Commentary
• EPM 26743 (Eidsvold), and
• EPM 28433 (Coonambula Extended).
• Each of the granted Coonambula
tenements is currently held 100% by
wholly owned subsidiaries of Great
Divide Mining Ltd (GDM), namely GDM
Coonambula Pty Ltd and GDM Yellow
Jack Pty Ltd. Dart Mining Ltd has a
joint venture agreement (Coonambula
Joint Venture) to complete exploration
works on the EPMs.
Drill hole
Information
• A summary of all information material to
the understanding of the exploration
results including a tabulation of the
following information for all Material drill
holes:
o easting and northing of the drill hole
collar
o elevation or RL (Reduced Level –
elevation above sea level in metres)
of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception
depth
o hole length.
• If the exclusion of this information is
justified on the basis that the
information is not Material and this
exclusion does not detract from the
understanding of the report, the
Competent Person should clearly
explain why this is the case.
• No drillhole information is reported in
this announcement.
Data
aggregation
methods
• In reporting Exploration Results,
weighting averaging techniques,
maximum and/or minimum grade
truncations (eg cutting of high grades)
and cut-off grades are usually Material
and should be stated.
• Where aggregate intercepts incorporate
short lengths of high grade results and
longer lengths of low grade results, the
procedure used for such aggregation
should be stated and some typical
examples of such aggregations should
be shown in detail.
• The assumptions used for any reporting
of metal equivalent values should be
clearly stated.
• No data aggregation methods have
been applied.
Relationship
between
mineralisation
widths and
intercept
lengths
• These relationships are particularly
important in the reporting of Exploration
Results.
• If the geometry of the mineralisation
with respect to the drill hole angle is
known, its nature should be reported.
• If it is not known and only the down hole
lengths are reported, there should be a
• No mineralisation widths are reported
as the true/apparent thickness are not
fully exposed in outcrop.
10
Criteria JORC Code explanation Commentary
clear statement to this effect (eg ‘down
hole length, true width not known’).
Diagrams • Appropriate maps and sections (with
scales) and tabulations of intercepts
should be included for any significant
discovery being reported These should
include, but not be limited to a plan view
of drill hole collar locations and
appropriate sectional views.
• Included in the body of the
announcement.
Balanced
reporting
• Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and
high grades and/or widths should be
practiced to avoid misleading reporting
of Exploration Results.
• These samples have been disclosed as
selective rock chip sampling. Samples
were collected on the basis to identify
potential mineralisation as a priority
from outcrops.
Other
substantive
exploration
data
• Other exploration data, if meaningful
and material, should be reported
including (but not limited to): geological
observations; geophysical survey
results; geochemical survey results;
bulk samples – size and method of
treatment; metallurgical test results;
bulk density, groundwater, geotechnical
and rock characteristics; potential
deleterious or contaminating
substances.
• No other material data is presented in
this announcement.
Further work • The nature and scale of planned further
work (eg tests for lateral extensions or
depth extensions or large-scale step-out
drilling).
• Diagrams clearly highlighting the areas
of possible extensions, including the
main geological interpretations and
future drilling areas, provided this
information is not commercially
sensitive.
• Plans for further work are outlined in the
body of the announcement which
include continuing the first stage drilling
programme.
Share your feedback
Discover