Granite Flat Drilling Program Copper and Gold Intercepts
Released
Released
Announcement PDF
ASX Release
17th October 2023
Multiple Copper and Gold intercepts from Granite Flat
Cu-Au project drilling programs
Dart Mining NL (ASX:DTM) (“Dart Mining” or “the Company”) is pleased to report multiple copper and gold
mineralised intervals in its most recent reverse circulation (RC) and Diamond (DD) drilling programs from the
company’s Granite Flat Cu-Au project in Northeast Victoria.
Highlights Include:
•
The RC program comprises 1417m drilled across 13 holes, testing the strike extent of a major soil Cu-Au
anomaly and holes EMDDH010 to EMDDH017 were designed to test the nature and style of mineralisation
evident in >500m strike length of historic surface workings.
•
Significant Diamond Drilling intercepts include:
•
•
•
•
•
•
•
•
214m @ 0.21 g/t AuEq (0.1 g/t Au, 0.5 g/t Ag, 0.07% Cu) from 8.0m in EMDDH009,
including 11.0m @ 0.64 g/t AuEq (0.4 g/t Au, 1.9 g/t Ag, 0.17% Cu)
28.9m @ 0.32 g/t AuEq (0.25 g/t Au, 0.37 g/t Ag, 0.05% Cu) from 4.1m in EMDDH010,
including 1.1m @ 4.3 g/t AuEq (4.1 g/t Au, 0.5 g/t Ag, 0.09% Cu)
6.05m @ 1.53 g/t AuEq (1.1 g/t Au, 1.6 g/t Ag, 0.3% Cu) from 47.0m in EMDDH012,
including 0.48m @ 6.1 g/t AuEq (5.3 g/t Au, 4.2 g/t Ag, 0.49% Cu)
7.1m @ 1.4 g/t AuEq (0.6 g/t Au, 4.8 g/t Ag, 0.49% Cu) from 59.0m in EMDDH013,
including 0.98m @ 6.5 g/t AuEq (3.5 g/t Au, 25.8 g/t Ag, 1.91% Cu)
12.16m @ 1.07 g/t AuEq (0.46 g/t Au, 1.7 g/t Ag, 0.4% Cu) from 39.84m in EMDDH015,
including 0.49m @ 13.5 g/t AuEq (7.9 g/t Au, 7.7 g/t Ag, 3.85% Cu)
12.10m @ 0.6 g/t AuEq (0.29 g/t Au, 2.9 g/t Ag, 0.21% Cu) from 3.0m in EMDDH016,
including 1.5m @ 2.5 g/t AuEq (1.78 g/t Au, 9.6 g/t Ag, 0.41% Cu)
40.0m @ 1.16 g/t AuEq (0.37 g/t Au, 5.8 g/t Ag, 0.5% Cu) from 0.0m in EMDDH017,
including 20.77m @ 2.2 g/t AuEq (0.7 g/t Au, 10.5 g/t Ag, 0.94% Cu)
Significant RC drilling intercepts include:
▪
▪
▪
▪
▪
37m @ 0.5 g/t AuEq (0.3 g/t Au, 1.0 g/t Ag, 0.13% Cu) from 11m in EMRC07,
including 1m @ 3.0 g/t AuEq (2.2 g/t Au, 4.0 g/t Ag, 0.5% Cu)
8m @ 3.7 g/t AuEq (3.3 g/t Au, 2.1 g/t Ag, 0.2% Cu) from 61m in EMRC08,
including 1m @ 23 g/t AuEq (22 g/t Au, 8.6 g/t Ag, 0.62% Cu)
30m @ 0.43 g/t AuEq (0.2 g/t Au, 0.9 g/t Ag, 0.13% Cu) from 100m in EMRC11,
including 5m @ 1.2 g/t AuEq (0.8 g/t Au, 1.9 g/t Ag, 0.3 g/t Cu)
37m @ 0.96 g/t AuEq (0.4 g/t Au, 1.4 g/t Ag, 0.37% Cu) from 45m in EMRC12,
including 7m @ 3.50 g/t AuEq (1.6 g/t Au, 4.9 g/t Ag, 1.33% Cu)
105m @ 0.27 g/t AuEq (0.2 g/t Au, 0.46 g/t Ag, 0.07% Cu) from 2m in EMRC17
Chairman, James Chirnside commented: “These results from Dart Mining’s most recent RC and Diamond drilling
programs at Granite Flat provide more evidence of the mineralisation style, and extent, of a bulk tonnage,
intrusion-related copper-gold style mineralisation event. These drill programs have confirmed the presence of an
extensive sheeted vein system that remains open to the southeast, northwest, and at depth, and focussed highgrade Au-Ag-Cu epithermal mineralisation across the project.”
Dart Mining NL
ABN: 84 119 904 880
Level 6, 412 Collins Street
Melbourne VIC 3000
Contact: James Chirnside
Email: jchirnside@dartmining.com.au
Mobile: +61 447 447 613
Webpage: www.dartmining.com.au
LinkedIn: Dart Mining NL
Twitter: @DartMining
Page | 1
OVERVIEW
Two parallel drilling programs have been undertaken at Dart Mining’s Granite Flat Cu-Au project in Northeast
Victoria. A 1417m RC program was undertaken to test the nature and extent of a significant soil Cu-Au anomaly
within the project area, while a regularly spaced, eight-hole NQ diamond drilling program was undertaken across
the known strike extent of an epithermal vein system near Sulphide Shaft (Figure 1) in the centre of the project
area. The reef system has previously demonstrated potential for high-grade Au-Ag-Cu mineralisation (DTM ASX
September 2021; DTM ASX 27th February 2023). A ninth NQ diamond hole (EMDDH009) is also reported,
representing further deep drill-testing of an IP anomaly below the surface outcrop of porphyry dyke and in close
proximity to the sheeted vein system tested by the RC program (DTM ASX September 2021).
REVERSE CIRCULATION (RC) DRILL ASSAY RESULTS
Assay results from a Reverse Circulation (RC) percussion drilling program targeting porphyry or intrusion-related
stockwork / sheeted vein-style mineralisation at Granite Flat have been finalised. Thirteen holes were completed
for a total of 1417m of drilling. This drill program was designed to test the extent and nature of the large Cu-Au
soil anomaly at the core of the project (Figure 1), and this program represents an extension of the RC drilling
initiated in 2021 (DTM ASX Sept 2021). Drill results along the >950m of a strong Cu-Au soil anomaly confirm
mineralisation continuity below 120m from surface with intersections across the anomaly consistent with
multiple sub-parallel steep mineralised vein structures with a northwest strike orientation. Drill grades up to
37m @ 0.96 g/t AuEq (EMRC12), 12m @ 0.76 g/t AuEq (EMRC13) and 5m @ 0.87g/t AuEq in EMRC13 (Table 1;
Figure 2C) illustrate grades of Au, Ag and Cu associated with the multiple silica sulphide vein sets causing the soil
anomaly. Diamond drill hole EMDDH009, drilled along strike of the vein orientation shows 214m @ 0.21g/t AuEq
from 8m depth (Figure 8). Targeting zones with a higher vein density of this style of mineralisation represents a
valid exploration target for further testing along this very large, open structure.
Drilling assay results have produced several significant intersections (Table 1), and preliminary interpretation of
geological logging and drilling results have identified common zones of phyllic alteration, and several instances
of more discrete potassic alteration, in addition to pyrite and chalcopyrite (± molybdenite) mineralisation hosted
within a weakly anastomosing, northwest-trending, and steeply northeast-dipping, sheeted vein system (Figures
1, 2, & 3) consistent with Dart Mining’s interpretation of an intrusion-related copper-gold system at Granite Flat
causing the large soil anomaly.
Copper, and particularly gold, mineralisation is repeated at regular intervals down-hole in many of the holes
completed in this recent drilling, consistent with previous drilling intercepts, and is interpreted here as a lowdensity sheeted vein system (Figure 1). Spatially, gold and copper mineralisation appear to be somewhat
disassociated in many instances, with chalcopyrite (Cu) mineralisation forming a broader halo than the more
tightly restricted pyrite-hosted Au ± Ag mineralisation. Within the vein system, gold is principally focused on
primary structures, whereas copper mineralisation is more widespread, with stringer veins and diffuse
chalcopyrite extending into the alteration zone surrounding the main veins.
The frequency and regular occurrence of these narrow, sheeted veins demonstrated in drilling across a strike
length of >950m explains the significant extent of the large, 2.4 km-long, soil copper and gold anomaly reported
in DTM ASX August 2022 (Figure 1 inset). Supplementary to this, when EMRC19 is considered in tandem with
the IP survey results (DTM ASX Sept 2021) and earlier RC and diamond drilling (DTM ASX Sept 2021, DTM ASX
Sept 2022), geological and assay data further support a lithological control on mineralisation, likely a strongly
silicified porphyritic dyke, which is readily apparent in the high resistivity, low chargeability anomaly present in
IP data, and the grade distribution across EMRC04, EMRC19, and EMDDH006 (Figure 4). Narrow Molybdenite
Page | 2
mineralisation was encountered in holes EMRC14 and EMRC18, including 1m at 180ppm Mo, 0.21% Pb, 0.75 g/t
Au, & 12.8 g/t Ag from 77m in EMRC14, and 1m at 277ppm Mo in EMRC18 from 106m.
Some crystalline quartz vugs were recovered in large RC chips during this drill program, possibly suggesting
epithermal textures may be present in this sheeted vein system (Figure 5). Laminated and brecciated quartz vein
material was also observed in coarse RC chips recovered (Figure 5). However, preliminary geochemical analysis
shows no significant corresponding enrichment in Bi, Pb, Sb, Te, or Zn, which is typically observed in overprinting
epithermal veinsets elsewhere on the Granite Flat project (e.g., DTM ASX February 2023).
Figure 1 – Map of recent RC drill hole collars, and preliminary geological interpretation of a weakly anastomosing,
sheeted vein system, which remains open at the northwestern, southeastern extents and at depth. Locations of
sections used in figures 2 and 3 also depicted. Also includes the location and indicative assay values for EMDDH009.
Previous drilling and soil survey results included for reference in Figure 1 inset, including Dart Mining’s 2020 RAB
drilling program (Dart ASX 8th March 2021).
Page | 3
Figure 2 – Cross-section and preliminary geological interpretation across drill holes EMRC07 to EMRC14
showing mineralised intercepts in gold equivalent values (see Table 1 for additional grades). Location and
inferred orientation of sheeted silica-sulphide veins indicated by red lines. Location of sections shown on
Figure 1.
Page | 4
Figure 3 – Cross-sections across drill holes EMRC15 to EMRC19 showing mineralised intercepts in gold
equivalent values (see Table 1 for additional grades). Location of sections shown on Figure 1. Drillholes
EMRC02 and EMRC04 previously reported in DTM ASX Sept 2021 and diamond drillhole EMDDH006
previously reported in DTM ASX Sept 2022.
Page | 5
Table 1 – Significant intersections from recent Granite Flat RC drilling. Significant intervals calculated using a lower cutoff value of 0.2 ppm Au, and 0.05% Cu. All intervals represent downhole thicknesses.
Hole ID
From (m)
To (m)
EMRC07
11
48
Including
EMRC08
61
69
Including
EMRC09
85
5
99
12
Including
EMRC10
27
33
Including
58
Including
68
1
125
Including
and
EMRC11
0
135
Including
100
130
Including
EMRC12
45
82
Including
and
EMRC13
EMRC14
46
76
22
70
58
81
44
80
Including
EMRC15
EMRC16
EMRC17
EMRC18
92
66
2
0
102
73
107
11
Including
EMRC19
37
82
Including
and
64
106
Interval
(m)
37
1
7
8
1
14
7
2
8
1
10
1
124
1
12
135
19
30
5
37
7
3
12
5
22
10
1
10
7
105
11
1
27
24
4
1
AuEq
(g/t)
0.50
3.00
1.00
3.70
23.00
0.34
0.50
0.95
0.58
2.70
0.27
1.12
0.28
2.80
0.60
0.23
0.40
0.43
1.20
0.96
3.50
1.36
0.76
0.87
0.30
0.48
1.00
0.56
0.50
0.27
0.55
2.30
0.35
0.32
0.68
1.90
Au
Ag
(g/t) (g/t)
0.3
1.0
2.2
4.0
0.5
2.8
3.3
2.1
22.0 8.6
0.1
0.7
0.1
1.1
0.1
1.8
0.4
0.6
2.2
1.2
0.2 0.80
1.0 1.80
0.1
0.5
2.3
1.8
0.2
1.0
0.1
0.4
0.2
0.5
0.2
0.9
0.8
1.9
0.4
1.4
1.6
4.9
0.7
2.2
0.3
1.9
0.5
1.9
0.2
0.5
0.3
2.7
0.8 13.0
0.3
1.1
0.3
0.9
0.2 0.46
0.4 0.67
2.0 0.90
0.2 0.56
0.2 0.72
0.4 1.80
1.0 5.70
Cu
(%)
0.13
0.50
0.30
0.20
0.62
0.14
0.29
0.56
0.09
0.34
0.07
0.05
0.10
0.35
0.24
0.07
0.11
0.13
0.30
0.37
1.33
0.47
0.3
0.21
0.07
0.11
0.12
0.15
0.11
0.07
0.11
0.20
0.10
0.07
0.18
0.53
Notes & Observations
Ended in mineralisation
Ended in mineralisation
Entire hole
Ended in mineralisation
No significant mineralisation
Collared in mineralisation
Collared in mineralisation
Page | 6
Figure 4 – Transect 7 drilling results from EMRC04, EMRC19 and EMDDH006 superimposed on IP Line 4
showing the relationship between mineralisation and the high resistivity, low chargeability anomaly.
Page | 7
Figure 5 – Examples of mineralisation and alteration styles observed in the latest RC drilling program. A)
Typical disseminated chalcopyrite mineralisation focused proximal to veinsets. B) Multi-generational
brecciated quartz vein, showing some late-stage carbonate cement. C) Vuggy quartz vein associated with
pyrite and chalcopyrite mineralisation. D) Typical sercitised granodiorite commonly found in broad selvedges
adjacent to primary vein systems. E) An example of localised potassic alteration of quartz monzodiorite within
a single 1m interval.
Page | 8
DIAMOND DRILLING RESULTS – EPITHERMAL AU-AG-CU
Preliminary drill results are available for six of eight diamond drill holes designed to target narrow, high-grade
gold-silver-copper mineralisation identified at surface along the strike extent of the historic Crawley’s Reef, a
line of workings exhibiting a strike length >400m at Granite Flat. Mineralisation along Crawley’s Reef (Figure 7)
is distinctly epithermal in nature (DTM ASX 27th February 2023), and overprints earlier low-grade, intrusion
related Cu-Au mineralisation across the Granite Flat project. Assay results of in situ and mullock samples
collected across surface workings on Crawley’s Reef (DTM ASX 27th February 2023) and first-phase percussion
drilling of the structures (DTM ASX March 2021), indicated good potential for high-grade, narrow, structurallyhosted Au-Ag-Cu mineralisation (e.g., Figure 6). These preliminary drill results indicate continuity of the main
mineralisation channel, now showing elevated gold, silver, and copper levels along some 500m of strike extent
with internal higher-grade zones (e.g., EMDDH017 3.55m @ 5.52g/t AuEq – comprised of 1.34g/t Au, 20.76g/t
Ag and 3.03% Cu – Table 2) that may form shoots within the mineralised channel. These potential shoots and
the halo mineralisation remain open at depth and along strike to the west (Figure 7).
The Hodder’s line of reef (Figure 7) remains largely untested, with only a few holes in close proximity to Sulphide
Shaft, all of which have encountered mineralisation. The Hodder’s line of reef provides an additional significant
exploration target, with surface rock chip sampling showing that mineralisation extends along >800m of strike
(DTM ASX 27th February 2023).
Figure 6 – Core tray from EMDDH016 from 32.61-36.72m showing Ag-Cu mineralised interval with trace Au. A) Core tray
image showing assay results for Au, Ag, and Cu. B) Zone of oxidised sulphides with abundant iron and copper oxides,
including malachite (green) and azurite (blue). C) Sulphide vein comprised of pyrite, chalcopyrite, and sphalerite.
Page | 9
Table 2 – All highlights from the reported drillholes. Cut-off values applied are 0.2g/t Au, 0.5g/t Ag and 0.05% Cu.
Drill Hole
From (m)
To (m)
EMDDH009
8
including:
including:
4.1
including:
including:
47
including:
52.9
59
including:
4.5
39.84
including:
and
3
including:
33
including:
0
including:
and
222
EMDDH010
EMDDH012
EMDDH013
EMDDH015
EMDDH016
EMDDH017
33
53.1
53.4
66.1
18
52
15
36
40
Intercept
(m)
214
7
11
28.9
9.4
1.1
6.05
0.48
0.45
7.1
0.98
13.5
12.16
0.49
0.84
12
1.5
3
1.14
40
20.77
3.55
AuEq
(g/t)
0.21
0.44
0.64
0.32
0.89
4.3
1.53
6.1
3.2
1.4
6.5
0.43
1.07
13.5
4.14
0.62
2.5
1.6
2.78
1.16
2.17
5.92
Au (g/t)
Ag (g/t)
Cu (%)
0.1
0.19
0.37
0.25
0.75
4.14
1.11
5.33
2.53
0.64
3.47
0.14
0.46
7.93
0.21
0.29
1.78
0.16
0.27
0.37
0.69
1.34
0.47
1.07
1.89
0.37
0.66
0.5
1.6
4.19
3.53
4.84
25.8
0.72
1.71
7.7
10.81
2.92
9.6
5.87
10.21
5.77
10.48
20.76
0.07
0.16
0.17
0.05
0.09
0.09
0.28
0.49
0.46
0.49
1.91
0.19
0.41
3.85
2.67
0.21
0.41
0.96
1.67
0.5
0.94
3.03
Page | 10
Figure 7 – Map showing the drill hole locations and illustrated mineralised intercepts in the six diamond drill holes reported
across the Crawley’s line of reef. Hodder’s line of reef remains untested along strike. Collars for RAB drill holes and soil
sample sites are also shown DTM ASX March 2021; DTM ASX 27th February 2023). Currently awaiting results on EMDDH011
and EMDDH014.
Page | 11
Figure 8 – Cross section of drill hole EMDDH009 showing all mineralised intercepts. RAB drilling results from DTM ASX
March 2021.
Page | 12
Figure 9 – Cross section of drill hole EMDDH010 showing all mineralised intercepts. RAB drilling results from DTM ASX
March 2021.
Page | 13
Figure 10 – Cross sections of drill holes EMDDH012 showing all mineralised intercepts. Sampling and assay results for
EMDDH011 remain outstanding. Rock chip results from DTM ASX 27th February 2023.
Page | 14
Figure 11 – Cross section of drill hole EMDDH013 showing all mineralised intercepts. Sampling and assay results for
EMDDH014 remain outstanding. Assay results for diamond drillhole EMDDH005 from DTM ASX February 2022.
Page | 15
Figure 12 – Cross sections of drill holes EMDDH015, and EMDDH016 showing all mineralised intercepts. Drill result from
EMRAB 06 and EMRAB07 from DTM ASX March 2021. Rock chip results from DTM ASX 27th February 2023.
Page | 16
Figure 13 – Cross sections of drill hole EMDDH017 showing all mineralised intercepts. Assay results from EMPRAB01,
EMPRAB02 and EMPRAB03 reported in DTM ASX March 2021. Assay results from diamond holes EMDDH001 and
EMDDH003 reported in DTM ASX October 2021 and DTM ASX February 2022.
Page | 17
GOLD EQUIVALENT CALCULATION
Dart Mining (DTM) considers that gold, silver, and copper which comprise the gold equivalent calculation
(“AuEq”) have a reasonable prospect of being recovered at Granite Flat given our current understanding of the
project in these early exploration phases, current geological understanding, and historic production from the
area. The gold equivalence formula used by Dart Mining was calculated based on 100% recovery, using the
five-year mean commodity of US$1607 per ounce gold, US$19.88 per ounce silver, and US$3.34 per pound
copper. Based on the initial stage of exploration, and the geological understanding of the project, DTM
considers that AuEq = Au[ppm] + (1.4252xCu[%]) + (0.01237xAg[ppm]) is appropriate for use in the initial
exploration targeting of Au-Ag-Cu mineralisation at Granite Flat.
PROJECT SUMMARY
The Granite Flat prospect is located nine kilometres southeast of Mitta Mitta township and is accessed via the
Omeo Highway (Figure 14). Historically, the prospect was mined at several small production centres between
1856 and 1918, following an initial discovery identified by tracing the source of alluvial gold in the Mitta River
upstream. Previous explorers have targeted the area with geophysical surveys, rock chip, soil and stream
sediment sampling, and drilling and trenching. Historic soil grids have established several large, strong Cu-Au
anomalies that have seen variable drilling efforts across the prospect. In total, 18 costeans, 52 reverse
circulation (RC) and 19 diamond drillholes have been completed by previous explorers between 1986–1997
(Meltech Ltd., CRA Exploration [now Rio Tinto], and Perseverance Mining Ltd.). The broad intersections of low
grade Cu-Au mineralisation returned in historic drilling and Dart Mining’s recent 42 hole RAB drilling program
are hosted within potassic, chlorite and epidote-altered granodiorite, further confirming the potential for
porphyry-style mineralisation (DTM ASX 8th March 2021).
Mineralised zones at Granite Flat are hosted within the Banimboola Quartz Monzodiorite (BQM). The BQM has
been broadly identified as hosting a porphyry style of Cu-Au mineralisation associated with I-type granitoid
and sulphide veins, with alteration varying from silicic to argillic to propylitic, with moderate to high
background copper (Hesp, 1974; Bolger et al., 1983; Ramsay & Vandenberg, 1986; Wilde, 1988). Monzonite
intrusive bodies are often the host of porphyry systems in the Lachlan Fold Belt. Additionally, the Granite Flat
prospect lies adjacent to the Gilmore Suture, a significant crustal-scale structure that is associated with the
emplacement of several porphyry Cu-Au systems across the border in New South Wales. Whilst still in the early
stages of exploration, Dart Mining geologists believe that many of the geological characteristics and
mineralised features of the Granite Flat prospect correspond with key elements of the porphyry exploration
model.
––– END –––
Page | 18
Figure 14 – Location of the Granite Flat prospect, Northeast Victoria.
For more information contact:
James Chirnside
Managing Director
Dart Mining NL
jchirnside@dartmining.com.au
+61 447 447 613
Peter Taylor
Investor Relations
NWR Communications
peter@nwrcommunications.com.au
+61 412 036 231
About Dart Mining
Dart Mining (ASX: DTM) floated on the ASX in May of 2007 with the aim of evaluating and developing several
historic goldfields, as well as substantiating a new porphyry province in North East Victoria. The area is
prospective for precious, base, and strategic metals. These include Lithium, Gold, Silver, Copper, Molybdenum,
Zinc, Tungsten, Tin, Tantalum, and a host of other important minerals. Dart Mining has built a strategically
placed gold exploration footprint in the Central and North East regions of Victoria, where historic surface and
alluvial gold mining indicates the existence of potentially significant gold endowment.
Page | 19
Additional JORC Information
Further details relating to the information on the Empress Copper-Gold Project can be found in Dart Mining’s
ASX announcements:
27th February 2023: “Granite Flat Exploration Update: Assay Results up to 43.1g/t AuEq”
9th February 2023: “Commencement of RC Drilling at Granite Flat”
21st September 2022: “Deep Diamond Drill Results”
18th August 2022: “High Grade Au-Ag-Cu assays from Granite Flat Rock Samples”
4th August 2022: “Granite Flat Regional Soil Survey”
11th October 2021: “Granite Flat Diamond Drilling Update”
29th September 2021: “Multiple Drill Targets Identified at Granite Flat”
14th September 2021: “Encouraging Copper-Gold Drill Results from Granite Flat”
31st August 2021: “Granite Flat Geophysics Program Complete”
1st June 2021: “Commencement of Second Drilling Program at Granite Flat”
27th May 2021: “Initiation of Geophysical Surveys at Granite Flat”
11th May 2021: “Diamond Drilling Program for Copper-Gold Mineralisation Commences”
18th March 2021: “LiDAR Acquisition over Strategic Projects”
8th March 2021: “Granite Flat High-Grade Gold, Silver, Copper Drill Results”
7th December 2020: “Northeast Drilling Program Complete”
9th November 2020: “Commencement of Drilling Copper-Gold Mineralisation at Granite Flat”
27th October 2020: “Orogenic Gold and Porphyry Prospectivity, Mitta Mitta, NE Victoria”
Additional information on Dart Mining’s other recent and current drilling operations can be found in:
13th September 2023: “Lithium Drill Results”
22nd June 2023: “First Assay Results from Phase 1 Drilling”
26th April 2023: “Rushworth LiDAR Results”
27th October 2021: “LiDAR Points Towards Increase in Lithium Pegmatites”
6th October 2021: “Lithium Drilling Update”
22nd September 2021: “Mt Elmo Goldfield Mineralisation”
20th July 2021: “Strategic and Technology Metals”
6th April 2021: “Strong Gold Mineralisation Intercepted at Rushworth”
16th February 2021: “Sandy Creek Significant Gold Mineralisation”
7th December 2020: “Northeast Drilling Program Complete”
16th November 2020: “Drilling Commencement, Historic Rushworth Goldfield”
5th November 2020: “Rushworth Historic High-Grade Goldfield”
30th October 2020: “Report for the quarter ended 30th September 2020”
19th October 2020: “Drill Results Reveal High-Grade Gold”
1st September 2020: “Drilling of Gold Mineralisation Commencing”
Page | 20
Competent Person’s Statement
The information in this report has been prepared, compiled, and verified by Dr. Ben Hines PhD, MSc, a
Competent Person who is a Member of the Australian Institute of Geoscientists. Dr. Hines is an independent
consultant acting for Dart Mining. Dr. Hines has sufficient experience that is relevant to the style of
mineralisation and type of deposits under consideration and to the activity being undertaken to qualify as a
competent person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves”. Dr. Hines consents to the inclusion in the report of the matters based on
his information in the form and context in which it appears.
Forward-Looking Statement
Certain statements contained in this document constitute forward-looking statements. Forward-looking
statements include, but are not limited to, Dart Mining’s current expectations, estimates and projections about
the industry in which Dart Mining operates, and beliefs and assumptions regarding Dart Mining’s future
performance. Such forward-looking statements are based on a number of estimates and assumptions made by
the Company and its consultants in light of experience, current conditions and expectations of future
developments which the Company believes are appropriate in the current circumstances. When used in this
document, words such as; “anticipate”, “could”, “intends”, “estimate”, “potential”, “plan”, “seeks”, “may”,
“should”, and similar expressions are forward-looking statements. Although Dart Mining believes that its
expectations presented in these forward-looking statements are reasonable, such statements are subject to
known and unknown risks, uncertainties and other factors, which may cause the actual results, achievements
and performance of the Company to be materially different from the future results and achievements expressed
or implied by such forward-looking statements. Investors are cautioned that forward-looking information is no
guarantee of future performance and accordingly, investors are cautioned not to place undue reliance on these
forward-looking statements.
Page | 21
APPENDIX 1
COLLAR DETAILS
Hole ID
Easting
(MGA Z55)
Northing
(MGA Z5)
Elevation
(m)
EMRC07
EMRC08
EMRC09
EMRC10
EMRC11
EMRC12
EMRC13
EMRC14
EMRC15
EMRC16
EMRC17
EMRC18
EMRC19
EMDDH009
EMDDH010
EMDDH011
EMDDH012
EMDDH013
EMDDH014
EMDDH015
EMDDH016
EMDDH017
540019.7
540029.2
540052.5
540166.3
540231.4
540249.7
540243.7
540357.1
540397.8
540405.6
540414.3
540497.2
540666.6
540438.0
540364.0
540440.0
540542.0
540666.0
540666.0
540767.0
540767.0
540835.0
5950749.5
5950742.4
5950730.5
5950691.8
5950668.5
5950663.0
5950667.1
5950631.3
5950617.8
5950612.4
5950617.1
5950594.0
5950580.4
5950158.0
5949683.0
5949635.0
5949698.0
5949660.0
5949660.0
5949618.0
5949618.0
5949600.0
445
446
447
457
464
464
465
482
486.5
487
487.5
503
521
469
506
499
520
524
525
527
527
568
Achieved
Hole
Depth (m)
48
100
96
126
138
120
120
102
120
96
111
121
120
284.6
136.88
198.1
84.12
93.25
141
84.47
79.58
139.1
Collar
Azimuth
Survey
(UTM)
Method
GPS
25
GPS
80
GPS
205
GPS
25
GPS
0
GPS
200
GPS
25
GPS
205
GPS
205
GPS
0
GPS
25
GPS
205
GPS
25
GPS
300
GPS
202
GPS
73
GPS
218
GPS
232
GPS
232
GPS
212
GPS
212
GPS
184
Dip
-60
-90
-60
-60
-60
-90
-60
-60
-60
-90
-60
-60
-60
-60
-56
-56
-55
-55
-70
-70
-50
-60
Page | 22
APPENDIX 2
TENEMENT STATUS
All tenement applications continue to pass through the approvals process with the tenements remaining in
good standing as of the 29th of September 2023 (Table 1.1 – Figure 1.1).
Table 1.1. TENEMENT STATUS
Tenement Number
Name
Tenement Type
Area (km2)
Unless specified
Interest
Location
NE Victoria
MIN006619
Mt View 2
Mining License
224 Ha
100%
EL5315
Mitta Mitta4
Exploration Licence
148
100%
NE Victoria
EL006016
Rushworth4
Exploration Licence
32
100%
Central Victoria
EL006277
Empress
Exploration Licence
87
100%
NE Victoria
EL006300
Eskdale3
Exploration Licence
96
100%
NE Victoria
EL006486
Mt Creek
Exploration Licence
116
100%
NE Victoria
EL006764
Cravensville
Exploration Licence
170
100%
NE Victoria
EL006861
Buckland
Exploration Licence
414
100%
NE Victoria
EL007007
Union
Exploration Licence
3
100%
Central Victoria
EL006994
Wangara
Exploration Licence
190
100%
Central Victoria
EL007008
Buckland West
Exploration Licence
344
100%
NE Victoria
EL007099
Sandy Creek
Exploration Licence
437
100%
NE Victoria
EL006865
Dart Mining
Exploration Licence)
567
100%
NE Victoria
EL006866
Cudgewa
Exploration Licence
508
100%
NE Victoria
EL007170
Berringama
Exploration Licence
27
100%
NE Victoria
EL007430
Buchan
EL (Application)
546
100%
Gippsland
EL007435
Goonerah
EL (Application)
587
100%
Gippsland
EL008161
Colbinannin
EL (Application)
100%
Central Victoria
EL007425
Deddick
Exploration Licence
341
100%
Gippsland
EL007428
Boebuck
Exploration Licence
355
100%
NE Victoria
EL007426
Walwa
Exploration Licence
499
100%
NE Victoria
EL007754
Tallandoon
Exploration Licence
88
100%
NE Victoria
RL006615
Fairley’s2
Retention License
340 Ha
100%
NE Victoria
RL006616
Unicorn1&2
Retention License
23,243 Ha
100%
NE Victoria
EL9476
Woomargama
Exploration Licence
85
100%
New South Wales
EL9516
Brewarrina
Exploration Licence
185
100%
New South Wales
All tenements remain in good standing as of 30 September 2023.
NOTE 1: Unicorn Project area subject to a 2% NSR Royalty Agreement with Osisko Gold Royalties Ltd dated 29 April 2013.
NOTE 2: Areas subject to a 1.5% Founders NSR Royalty Agreement.
NOTE 3: Areas are subject to a 1.0% NSR Royalty Agreement with Minvest Corporation Pty Ltd (See DTM ASX Release 1
June 2016).
NOTE 4: Areas are subject to a 0.75% Net Smelter Royalty on gold production, payable to Bruce William McLennan.
Page | 23
Figure 1.1: Location of Dart Mining’s exploration properties in Northeastern and Central Victoria.
Page | 24
APPENDIX 3
JORC CODE, 2012 EDITION – TABLE 1
SECTION 1 SAMPLING TECHNIQUES AND DATA
Criteria
JORC Code Explanation
Sampling techniques
•
•
•
•
Nature and quality of sampling (e.g. cut channels, random chips, or
specific specialised industry standard measurement tools appropriate to
the minerals under investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc.). These examples should not be taken as
limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample representivity and
the appropriate calibration of any measurement tools or systems used.
Aspects of the determination of mineralisation that are Material to the
Public Report.
In cases where ‘industry standard’ work has been done this would be
relatively simple (e.g. ‘reverse circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to produce a 30 g charge for
fire assay’). In other cases more explanation may be required, such as
where there is coarse gold that has inherent sampling problems.
Unusual commodities or min
Share your feedback
Discover