Infill Drilling Shows Expanding and Broad Gold Zone
Released
Released
Announcement PDF
Dart Mining NL
ABN: 84 119 904 880
Level 6, 412 Collins Street
Melbourne VIC 3000
Contact: James Chirnside
Email: jchirnside@dartmining.com.au
Mobile: +61 447 447 613
Webpage: www.dartmining.com.au
LinkedIn: Dart Mining NL
Twitter: @DartMining
1 | P a g e
ASX Release
16 April 2026
INFILL DRILLING SHOWS AN EXPANDING AND BROAD GOLD ZONE
Dart Mining NL (ASX:DTM) (Dart Mining or the Company) is pleased to announce the assays of drill
holes CBADD011 through CBADD013 received from the Coonambula antimony (Sb) - gold (Au)
project near Eidsvold in Central Queensland. The project is a Farm-In Joint Venture with Great
Divide Mining (ASX:GDM) (ASX: DTM Mar 2025).
HIGHLIGHTS
Assays from CBADD011 to CBADD013 have been received. These assays complete the drilling up
to December 2025 and confirms the broad, shallow, gold zone shown both down dip and along
strike. Highlight assays include:
• 4.9m @ 5.27 g/t Au from 21.0m (CBADD013) including;
▪ 1.0m @ 14.6 g/t Au from 22.2m; and
▪ 1.2m @ 4.49 g/t Au from 24.7m.
• 1.8m @ 1.98 g/t Au from 44.90m (CBADD012) including;
▪ 0.3m @ 4.04 g/t Au from 45.9m.
• 0.4m @ 2.63 g/t Au from 107.0m (CBADD011) including.
Assay results from CBADD013 continue to show the broad gold zones which were intersected at a
shallow level and up dip of previously reported Dart Mining intersections. The results in CBADD013
highlight that the historical RC drilling has potentially missed sampling this key zone down dip. The
cross section in Figure 1 highlights the assays of CBADD013 relative to CNRC06. The potential
interpreted zone shown in Figure 1 is supported by CBADD005a (off section) where similar broad
gold (Au anomalies over 9m) was intersected along the same strike.
Dart Mining’s Chairman, James Chirnside, commented: “Now that the wet season is coming to an
end, we’re starting to see a more productive drilling and metres. These results complete the 2025
drilling and sampling program and is an important step towards our milestone earn-in for the
Coonambula Joint Venture project. The broad gold zones identified appear to have been previously
overlooked, or less understood, are starting to become an important economic factor at the
Banshee prospect.
2 | P a g e
We note that the historical drill holes at Banshee had limited assaying, and, considering that they
were predominately RC, the ability to interpret and selectively sample left question marks over
interpretation. Dart Mining’s approach using diamond core drilling, at Coonambula, has again
highlighted the advantage of this drilling method over RC, in certain circumstances, and that
certainly is the case here. In short, it allows for better structural understanding, thereby improving
the interpretation along strike”.
Figure 1: Cross section through CBADD013 showing gold assays and interpreted mineralised zones.
Dart Mining has drilled 3,585.9m of diamond core drilling across the Banshee prospect with logging
completed up to 3,072.9m (Figure 2). Assay results have now been received for all drilling
completed in 2025. The process on site has been slowed with the typical Queensland wet weather,
but samples are now underway again being processed and sent to the lab to continue to develop
sufficient drilling to support a maiden Mineral Resource Estimate.
The key intercept from this batch of assay results is CBADD013 where 4.9m @ 5.27 g/t Au was
intersected along strike from both CBADD010 and CBADD005a. These newly defined zones of
broader gold mineralisation may become an important interpretation leading into the back end of
drilling as part of Dart Mining’s 4,000m target. Core trays from CBADD013 are shown in Figure 2.
The zones are not always clearly mineralised, but alteration has been the key to determining zones
of interest. Table 1 shows the highlight intervals from the latest batch. Appendix 1 has the
complete assay results.
3 | P a g e
Table 1: Key drill intercepts from Dart’s recent diamond drilling at the Coonambula project.
Drill Hole Name From Depth (m) Thickness (m) Au g/t Ag g/t
CBADD011 106.00 0.4 1.95 0.54
CBADD011 107.00 0.4 2.63 0.64
CBADD012 44.90 1.8 1.98 0.55
Including 45.90 0.3 4.04 0.79
CBADD013 21.00 4.9 5.27 0.62
Including 22.20 1 14.6 0.58
including 24.7 1.2 4.49 1.65
CBADD013 79.7 0.3 0.75 0.36
Figure 2: Core trays of CBADD013 highlighting the key thick gold zone and key assays intervals.
Interestingly, these zones intercepted in CBADD011 through CBADD013 show low silver and
antimony results despite these drill holes being within the main Banshee zone (see Figure 3).
Interpretations of this gold only zones suggest that the development of the high-grade antimony
and silver seen along section is more shoot-like, commonly showing as pinching and swelling (note
Dart Mining has intersected some very wide zones of massive Stibnite).
An alternative view includes the observations of extensively broken core suggesting fault zones that
may be influencing continuity between drill holes and that Au-only mineralisation is secondary to
the earlier Au+Ag+Sb mineralisation which may have been offset due to localised faulting. Dart
Mining has completed drilling that includes a shallow programme of closer spaced, less than 60m
deep holes across the strike length of the Banshee zone which will aid in future interpretations as
these results become available. These drill holes are currently being transported back to the core
processing camp and will begin logging and sampling.
4 | P a g e
Figure 3: Location plan showing drill hole locations and preliminary mineralisation interpretation.
Previous Dart Results
Highlight assays from Dart’s first hole, CBADD001, (ASX: DTM 10 November 2025) include:
• 5.0m @ 4.33% Sb + 1.69 g/t Au + 23.65 g/t Ag from 41.5m;
▪ including 0.65m @ 32.20% Sb + 2.91 g/t Au + 10.50 g/t Ag from 42.0;
▪ 0.5m @ 2.53 g/t Au from 42.65m and
▪ 0.7m @ 5.61 g/t Au + 154 g/t Ag from 45.4m.
• 1.6m @ 9.47% Sb + 0.35 g/t Au + 4.09 g/t Ag from 68.2m;
▪ including 0.5m @ 29.60% Sb + 0.65 g/t Au + 12.60 g/t Ag from 68.7.
Highlight assays from CBADD002 (ASX: DTM 15 December 2025) include:
• Broader gold zones containing antimony mineralised zones
• 1.4m @ 2.00 g/t Au + 0.97% Sb from 134.0m including:
▪ 0.3m @ 7.33 g/t Au + 4.40% Sb from 134.5m.
• 1.0m @ 2.15 g/t Au from 175.5m;
• 6.5m @ 5.1 g/t Au + 0.15% Sb from 180.0m including:
▪ 1.5m @ 7.32 g/t Au from 182.5m;
▪ 0.5m @ 18.30 g/t Au from 184.5m; and
▪ 1.0m @ 6.38 g/t Au + 0.92% Sb from 185.5m.
5 | P a g e
Highlight assays from CBADD003 through CBADD010 (ASX: DTM 15 December 2025) include:
• 9.0m @ 2.67g/t Au + 16.8 g/t Ag + 5.8% Sb from 32.5m (CBADD010) including;
▪ 1.2m @ 5.5 g/t Au + 85.1 g/t Ag + 18.8% Sb from 37.7m; and
▪ 0.6m @ 1.62 g/t Au + 17.2 g/t Ag + 44.6% Sb from 37.9m; and
▪ 0.5m @ 10.75 g/t Au + 3.5 g/t Ag + 4.7% Sb from 39.0m.
• 4.3m @ 3.61 g/t Au + 3.3 g/t Ag + 0.2% Sb from 43.2m (CBADD009) including;
▪ 0.9m @ 9.44 g/t Au + 2.3 g/t Ag + 0.5% Sb from 43.2m; and
▪ 0.3m @ 4.02 g/t Au + 27.6 g/t Ag + 1.3% Sb from 46.1m.
• 2.2m @ 4.29 g/t Au + 4.0 g/t Ag + 0.2% Sb from 82.9m (CBADD005) including;
▪ 0.5m @ 10.05 g/t Au + 1.3 g/t Ag from 84.6m; and
▪ 0.4 @ 6.18 g/t Au + 4.3 g/t Ag + 1.0% Sb from 85.1m.
• 1.3m @ 3.80 g/t Au + 131.9 g/t Ag + 10.5% Sb from 8.7m (CBADD006);
• 1.3m @ 2.12 g/t Au + 68.5 g/t Ag + 10.2% Sb from 131.4m (CBADD003) including;
▪ 0.5m @ 2.74 g/t Au + 145.0 g/t Ag + 24.9% Sb from 131.4m.
• 2.1m @ 1.61 g/t Au + 71.5 g/t Ag + 0.5% Sb from 57.5m (CBADD004) including;
▪ 0.6m @ 2.45 g/t Au + 234.0 g/t Ag + 1.8% Sb from 58.0m.
Dart Mining rock chip sampling revealed high grade antimony, gold and silver (ASX: DTM 10
October 2025). Assays received across 9 samples of float and in situ veins across
the historic Banshee antimony mine area include:
• Antimony results up to 65.3% Sb and 55.5% Sb
• Gold grades up to 17.0g/t Au and 15.05g/t Au
• Silver assays up to 97.9g/t Ag and 66.7g/t Ag
Trench sampling conducted immediately south of the Banshee mine confirmed high grade gold,
silver and antimony (ASX: DTM 15 January 2026). Samples from regular 1m intervals returned:
• Gold grades up to 10.45g/t Au and 8.92g/t Au
• Silver assays up to 125g/t Ag and 121g/t Ag
• Antimony results up to 5.14% Sb
Prior to Dart Mining, previous highlights across the project include:
• Highlights from 2014 drilling as per the GDM Prospectus (ASX: GDM Prospectus 2023):
o 3m @ 9.18% Sb in hole CNRC03 from 158m including 1m @ 25% Sb from 158m;
o 6m @ 5.12% Sb & 1.55 g/t Au in hole CNRC04 from 77m;
o 3m @ 1.50% Sb & 8.53 g/t Au in hole CNRC05 from 18m;
• Rock chips of 44.9% Sb, 24.1% Sb, 39.9% Sb, and 39.4% Sb (ASX: GDM Prospectus 2023):
• Surface trenching includes 4m@ 3.09 g/t Au and 1.14% Sb and 1m @ 6.15 g/t Au and 3.1% Sb.
While trenching, selective rock chips returned 3.65 g/t Au with 23.9% Sb, and 9.93 g/t
Au with 7.56% Sb (ASX: GDM Nov 2024).
6 | P a g e
NEXT STEPS
Dart Mining and its Joint Venture partner, Great Divide Mining, will progress farm-in exploration at
the Coonambula project including:
• Report diamond drilling assay results as they are received and approved;
• Continue to drill and test the Banshee Antimony and Gold mineralisation trend targeting
4,000m drilling to support the Joint Venture milestone;
• Select and submit composite drill cores for metallurgical test-work to support concepts on
ore types and recoveries; and
• Develop a 3D model and declare a JORC resource at the earliest possible opportunity subject
to drill results.
Approved for release by the Board of Directors.
For more information contact:
James Chirnside
Managing Director
Dart Mining NL
jchirnside@dartmining.com.au
+61 419 605 842
InvestorHub Link
Terry Bates
Director
Dart Mining NL
tbates@dartmining.com.au
7 | P a g e
COONAMBULA ANTIMONY-GOLD PROJECT
The Coonambula Antimony-Gold Project (Coonambula or Project) is located approximately 390km
by road north-northwest of Brisbane, Queensland. Coonambula is 70km southeast of the multi-
million-ounce Cracow gold mine and 25km southwest of the Eidsvold goldfield (Figure 6). The
Project is comprised of five granted Exploration Permits: EPM 15203, EPM 16216, EPM 25260, EPM
26743 and EPM 28433 covering 282 sq.km., and application EPM 29186 covering an area of
227sq.km.
Figure 6: Project Location Plan.
Geology – New England Fold Belt geology hosts high grade quartz veins containing Sb-Au at
Hillgrove and Wild Cattle Creek in NSW, and Antimony at Neardie near Gympie QLD. Mineralisation
at Coonambula is hosted within intrusive granodiorites and holds the potential to host a large
intrusion related gold system, with attractive magnetic signature and structural geology.
Two distinct types of reef mineralisation occur: Gold associated with arsenopyrite in quartz and
high-grade antimony with calcite in quartz. Disseminated stibnite is recorded in the gold lodes
(Malnic, 1985).
Banshee is one of the largest historical antimony mining complexes in Central Queensland, located
70km Southeast of the Cracow gold mine and 25km SW of Eidsvold. Banshee is a historic high-
grade direct shipping ore antimony mine (worked variously between 1876 and 1983, The Banshee
Mine when reopened in 1983 produced 20t of ore containing 4t of Antimony (GDM Prospectus
2023). 12 RC and 1 diamond drill hole have been drilled over 650m of strike length at Banshee.
8 | P a g e
Directly east of Banshee lies another Antimony-Gold prospect called Lady Mary (previously called
Lady May). This prospect lies 1km along strike from Banshee, potentially along the same E-W
Banshee structure. Surface rock chip samples from old mine dumps at Lady Mary have returned
up to 49.6% Sb and 1.3 g/t Au (GDM Sep 2024). The area between Banshee and Lady Mary has not
yet been explored and is a high priority target being assessed by the current IP survey.
The Perseverance mine was mined to 132m depth with mining widths up to 10m wide (GDM
Prospectus 2023). Past production of gold from the mine was reported as 20kt @ 20g/t Au (Malnic,
1985) however only 3 drill holes have been completed to date.
Total strike of the prospective antimony zone is approximately 5km with historic mines either side
of Banshee. Lady Mary located 900m east of Banshee with additional historic mines occurring
some 3km west of Banshee giving a potential E-W strike of 5km. Individual high grade antimony
shoots are interpreted as having a strike length of 30-100m each based upon Banshee drilling
where 3 shoots of this length exist in the central core zone.
In GDM’s 2023 prospectus (GDM Prospectus 2023) consulting company Derisk stated that it:
“Considers that the Coonambula project tenements are prospective for mesothermal vein and
stockwork gold and gold-antimony deposits, as well as intrusion-related and epithermal gold
deposits. Most work at this project has focused on areas in and around historical mine workings.
Derisk considers there is potential to define extensions or repetitions of known mineralisation at
some of the historical workings. There is also potential to discover new mineralisation but
exploration for these targets is at a very early stage.”
Figure 7: Banshee mine waste dump material observed (unsampled) by Dart Mining in January 2025 showing
antimony mineral (70% stibnite*) with encasing vein quartz.*
*Visual estimates of mineral abundance should never be considered a proxy or substitute for laboratory analyses where
concentrations or grades are the factor of principal economic interest. Visual estimates also potentially provide no information
regarding impurities or deleterious physical properties relevant to valuations
9 | P a g e
Figure 8: Coonambula geology and key prospects.
10 | P a g e
About Dart Mining
The Triumph Gold Project is Dart’s first step into an advanced intrusion related gold system project in
Queensland. Dart will look to develop a regional presence in Queensland through advanced stage intrusion
related and epithermal gold projects. Dart is farming into the Coonambula Antimony-Gold Project in Central
Queensland. Dart Mining will continue to evaluate several historic goldfields in Central and Northeast Victoria
including the Rushworth Goldfield and the new porphyry and lithium province in Northeast Victoria identified
by Dart. The area is prospective for precious, base, and strategic metals. Dart Mining has built a strategic and
highly prospective gold exploration portfolio in Central and Northeast regions of Victoria, where historic
surface and alluvial gold mining indicates the existence of potentially large gold endowment.
Competent Person’s Statement
The information in this report has been prepared, compiled, and verified by Mr Andrew Dawes, who is a
Member of the Australasian Institute of Mining and Metallurgy and a Member of the Australian Institute of
Geoscientists. Mr Andrew Dawes is employed by AHD Resources and consults to Dart Mining NL. Mr Dawes
has sufficient experience that is relevant to the style of mineralisation and type of deposits under
consideration and to the activity being undertaken to qualify as a competent person as defined in the 2012
Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”.
Mr. Dawes takes responsibility for the exploration results, and consents to the inclusion in the report of the
matters based on his information in the form and context in which it appears.
Forward-Looking Statement
Certain statements contained in this document constitute forward-looking statements. Forward-looking
statements include, but are not limited to, Dart Mining’s current expectations, estimates and projections
about the industry in which Dart Mining operates, and beliefs and assumptions regarding Dart Mining’s future
performance. Such forward-looking statements are based on a number of estimates and assumptions made
by the Company and its consultants in light of experience, current conditions and expectations of future
developments which the Company believes are appropriate in the current circumstances. When used in this
document, words such as; “anticipate”, “could”, “intends”, “estimate”, “potential”, “plan”, “seeks”, “may”,
“should”, and similar expressions are forward-looking statements. Although Dart Mining believes that its
expectations presented in these forward-looking statements are reasonable, such statements are subject to
known and unknown risks, uncertainties and other factors, which may cause the actual results, achievements
and performance of the Company to be materially different from the future results and achievements
expressed or implied by such forward-looking statements. Investors are cautioned that forward-looking
information is no guarantee of future performance and accordingly, investors are cautioned not to place
undue reliance on these forward-looking statements.
No new information has been included in this release, all exploration results have been previously reported
by Great Divide Mining (ASX: GDM) and are available on their website. Dart Mining is not aware of any new
information or data that materially affects the information included in the original announcements.
11 | P a g e
APPENDIX ONE:
TABLE 1: DRILL HOLE SUMMARY OF REPORTED DRILLING
Hole ID Easting Northing Elevation Max Depth (m) Dip (deg) Azimuth (deg)
CBADD011 292006.7 7173928.0 237.7 154.4 -50 170
CBADD012 291897.5 7173899.0 233.7 113 -50.2 170
CBADD013 292066.1 7173912.5 241.2 101 -49.2 171
TABLE 2 ASSAY RESULTS CBADD011 – CBADD013
Hole ID From (m) To (m) Width (m) Au (g/t) Ag (g/t) Sb (ppm)
CBADD011 4 5 1 0.002 0.02 6.07
CBADD011 5 6 1 0.001 0.03 5.83
CBADD011 6 7 1 0.002 0.02 7.44
CBADD011 7 8 1 0.001 0.06 11.75
CBADD011 8 9 1 0.002 0.04 4.45
CBADD011 9 10 1 0.002 0.03 5.96
CBADD011 10 11 1 0.001 0.02 5.54
CBADD011 11 12 1 0.001 0.04 5.26
CBADD011 12 13 1 0.001 0.05 5.01
CBADD011 13 14 1 0.001 0.04 10.15
CBADD011 14 15 1 0.001 0.05 10.2
CBADD011 15 16 1 0.001 0.04 4.62
CBADD011 16 17 1 0.001 0.07 13.15
CBADD011 17 18 1 0.001 0.1 11.95
CBADD011 18 19 1 0.002 0.06 24.1
CBADD011 51 52 1 0.001 0.06 2.39
CBADD011 52 53 1 0.04 3.53
CBADD011 53 54 1 0.001 0.04 9.65
CBADD011 54 54.7 0.7 0.001 0.05 30.6
CBADD011 54.7 55.3 0.6 0.001 0.04 48.7
CBADD011 55.3 55.8 0.5 0.001 0.05 53.2
CBADD011 55.8 56.3 0.5 0.003 0.04 96.3
CBADD011 56.3 56.8 0.5 0.001 0.05 134
CBADD011 56.8 57.2 0.4 0.354 0.67 441
CBADD011 57.2 57.5 0.3 0.056 0.16 94
CBADD011 57.5 58.3 0.8 0.001 0.06 77.8
CBADD011 58.3 59 0.7 0.002 0.06 119.5
CBADD011 59 60 1 0.002 0.06 34.9
CBADD011 60 61 1 0.002 0.06 19.45
CBADD011 61 62 1 0.002 0.05 14.7
CBADD011 62 63 1 0.001 0.03 32.2
CBADD011 63 64 1 0.001 0.03 26.6
CBADD011 64 65 1 0.001 0.09 683
CBADD011 65 66 1 0.001 0.14 628
CBADD011 101 102 1 0.003 0.03 33.4
CBADD011 102 103 1 0.114 0.05 44.8
CBADD011 103 103.6 0.6 0.005 0.03 24.8
CBADD011 103.6 104 0.4 0.214 0.2 123.5
CBADD011 104 105 1 0.057 0.1 100
CBADD011 105 105.5 0.5 0.008 0.1 98.2
CBADD011 105.5 106 0.5 0.053 0.31 99.2
CBADD011 106 106.4 0.4 1.945 0.54 90.8
CBADD011 106.4 107 0.6 0.013 0.07 74.4
CBADD011 107 107.4 0.4 2.63 0.64 62.5
CBADD011 107.4 108 0.6 0.056 0.17 39.7
12 | P a g e
CBADD011 108 109 1 0.004 0.05 9.71
CBADD011 109 110 1 0.007 0.04 10.4
CBADD011 110 111 1 0.055 0.05 15.6
CBADD011 111 112 1 0.004 0.04 9.3
CBADD011 150 151 1 0.003 0.04 0.59
CBADD011 151 152 1 0.001 0.05 0.9
CBADD011 152 153 1 0.001 0.05 1.07
CBADD011 153 153.5 0.5 0.002 0.05 0.66
CBADD011 153.5 154.4 0.9 0.002 0.05 1.84
CBADD011 115 115.5 0.5 0.03 30.2
CBADD011 21.9 22.4 0.5 0.001 0.12 9.82
CBADD011 25.6 25.9 0.3 0.004 0.06 4.9
CBADD011 67 67.5 0.5 0.003 0.04 6.08
CBADD011 67.5 68 0.5 0.001 0.04 10.3
CBADD011 68 69 1 0.003 0.05 6.76
CBADD011 69 70 1 0.003 0.05 6.72
CBADD011 70 71 1 0.003 0.05 4.41
CBADD011 71 72 1 0.002 0.06 4.41
CBADD011 72 73 1 0.001 0.04 3.94
CBADD011 73 74 1 0.001 0.02 3
CBADD011 74 75 1 0.03 3.33
CBADD011 75 75.6 0.6 0.001 0.03 6.43
CBADD011 80.8 81.3 0.5 0.004 0.02 12.65
CBADD011 85.5 86 0.5 0.001 0.03 7.95
CBADD011 86 87 1 0.001 0.02 5.67
CBADD011 87 88 1 0.001 0.02 16.05
CBADD012 1 2 1 0.001 0.01 46.5
CBADD012 2 5 3 0.012 0.03 19.85
CBADD012 5 6 1 0.003 0.01 15
CBADD012 6 7 1 0.001 0.03 43.8
CBADD012 7 8 1 0.002 0.01 68.7
CBADD012 8 9 1 0.002 0.02 19.9
CBADD012 9 10 1 0.001 0.02 22.3
CBADD012 10 11 1 0.003 0.03 79.9
CBADD012 11 12 1 0.003 0.23 70.1
CBADD012 12 13 1 0.002 0.03 19
CBADD012 13 13.8 0.8 0.003 0.05 43.2
CBADD012 13.8 14.8 1 0.004 0.03 11
CBADD012 14.8 15.8 1 0.001 0.03 3.12
CBADD012 34.1 34.4 0.3 0.04 3.22
CBADD012 43 44 1 0.05 51.4
CBADD012 44 44.9 0.9 0.004 0.06 81.3
CBADD012 44.9 45.9 1 1.505 0.47 82.5
CBADD012 45.9 46.2 0.3 4.04 0.79 78
CBADD012 46.2 46.7 0.5 1.69 0.55 54.4
CBADD012 46.7 47.2 0.5 0.057 0.11 63.6
CBADD012 47.2 47.7 0.5 0.01 0.08 68.1
CBADD012 47.7 48.5 0.8 0.044 0.06 77.4
CBADD012 48.5 49.5 1 0.001 0.03 69.9
CBADD012 49.5 50 0.5 0.001 0.03 49.2
CBADD012 50 50.5 0.5 0.05 39.2
CBADD012 50.5 51.5 1 0.001 0.04 21.1
CBADD012 51.5 52.5 1 0.001 0.03 21.1
CBADD012 52.5 53.5 1 0.001 0.03 47.3
CBADD012 53.5 54.2 0.7 0.001 0.06 40.9
CBADD012 54.2 54.5 0.3 0.001 0.02 41.7
CBADD012 54.5 55 0.5 0.04 24.7
CBADD012 55 56 1 0.026 0.08 36.8
CBADD012 59.2 60.2 1 0.03 6.7
CBADD012 60.2 61 0.8 0.04 3.69
CBADD012 76.1 76.4 0.3 0.05 0.87
CBADD012 90.5 90.8 0.3 0.02 0.74
CBADD012 95 96 1 0.001 0.05 0.87
13 | P a g e
CBADD012 96 97 1 0.001 0.05 1.2
CBADD012 97 98 1 0.001 0.05 0.79
CBADD012 98 99 1 0.001 0.04 0.75
CBADD012 99 100 1 0.001 0.06 0.69
CBADD012 100 101 1 0.001 0.06 0.44
CBADD012 101 102 1 0.05 0.62
CBADD012 102 103 1 0.06 0.39
CBADD013 12.1 13.1 1 0.047 0.25 30.9
CBADD013 13.8 14.2 0.4 0.043 0.2 23.5
CBADD013 14.2 15 0.8 0.005 0.11 30.6
CBADD013 15 16 1 0.015 0.2 33.9
CBADD013 16 17 1 0.033 0.21 61
CBADD013 17 18 1 0.081 0.18 55.8
CBADD013 18 19 1 0.523 0.24 48.2
CBADD013 19 20 1 0.046 0.3 47.6
CBADD013 20 21 1 0.033 0.27 29.4
CBADD013 21 21.7 0.7 2.09 0.43 69.8
CBADD013 21.7 22.2 0.5 6.37 0.54 64.4
CBADD013 22.2 23.2 1 14.6 0.58 45.2
CBADD013 23.2 23.7 0.5 0.355 0.27 71.8
CBADD013 23.7 24.2 0.5 0.561 0.33 51.3
CBADD013 24.2 24.7 0.5 1.445 0.74 44.3
CBADD013 24.7 25.2 0.5 4.34 1.65 46.3
CBADD013 25.2 25.9 0.7 4.6 0.58 71.7
CBADD013 25.9 26.6 0.7 0.025 0.04 20.9
CBADD013 26.6 27.6 1 0.011 0.05 3.21
CBADD013 27.6 28.6 1 0.011 0.05 4.03
CBADD013 28.6 29.6 1 0.003 0.04 3.49
CBADD013 35 35.5 0.5 0.005 0.04 7.95
CBADD013 35.5 36 0.5 0.003 0.05 21.2
CBADD013 36 37 1 0.003 0.06 5.85
CBADD013 37 38 1 0.002 0.05 24
CBADD013 38 38.3 0.3 0.002 0.04 64.3
CBADD013 38.3 39 0.7 0.003 0.06 4.36
CBADD013 41 41.4 0.4 0.002 0.04 3.29
CBADD013 41.4 41.7 0.3 0.002 0.03 63.4
CBADD013 41.7 42 0.3 0.04 14.45
CBADD013 50.2 50.6 0.4 0.001 0.03 4.77
CBADD013 50.6 51 0.4 0.002 0.06 2.99
CBADD013 51 51.2 0.2 0.001 0.07 3.52
CBADD013 68.6 69.3 0.7 0.001 0.05 2.72
CBADD013 69.3 69.9 0.6 0.003 0.03 17.35
CBADD013 69.9 70.2 0.3 0.244 0.12 21.1
CBADD013 70.2 71 0.8 0.003 0.07 4.75
CBADD013 71 71.5 0.5 0.002 0.05 1.92
CBADD013 71.5 72.5 1 0.003 0.04 23.1
CBADD013 72.5 73 0.5 0.002 0.05 4.51
CBADD013 76.5 77.5 1 0.002 0.05 5.94
CBADD013 77.5 77.9 0.4 0.001 0.02 13.65
CBADD013 77.9 78.9 1 0.001 0.04 4.74
CBADD013 78.9 79.4 0.5 0.001 0.06 7.55
CBADD013 79.4 79.7 0.3 0.06 18.95
CBADD013 79.7 80 0.3 0.748 0.36 52.4
CBADD013 80 80.5 0.5 0.002 0.05 25.5
CBADD013 80.5 81 0.5 0.06 13.65
CBADD013 81 82 1 0.003 0.03 3.42
CBADD013 82 83 1 0.03 3.2
CBADD013 87.9 88.1 0.2 0.004 0.09 2.07
CBADD013 88.1 89 0.9 0.001 0.04 0.47
CBADD013 89 89.5 0.5 0.04 0.38
CBADD013 89.5 90.1 0.6 0.001 0.05 0.93
CBADD013 90.1 90.8 0.7 0.05 4.49
14 | P a g e
APPENDIX TWO
JORC Code, 2012 Edition – Table 1 report template
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, or handheld
XRF instruments, etc). These examples
should not be taken as limiting the broad
meaning of sampling.
• Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any
measurement tools or systems used.
• Aspects of the determination of
mineralisation that are Material to the
Public Report.
• In cases where ‘industry standard’ work
has been done this would be relatively
simple (eg ‘reverse circulation drilling
was used to obtain 1 m samples from
which 3 kg was pulverised to produce a
30 g charge for fire assay’). In other
cases more explanation may be
required, such as where there is coarse
gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (eg submarine
nodules) may warrant disclosure of
detailed information.
• Sampling has been made on NQ
diamond drilled core.
• Sampling is half core sampling
based on the geologist’s sub
sampling (down to 30cm) logging
definition.
• Samples are prepared with PREP-
31B which includes crush to 70 %
passing 2mm, riffle split off 1kg,
pulverise split to better than 85%
passing 75 microns.
Drilling
techniques
• Drill type (eg core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details
(eg core diameter, triple or standard
tube, depth of diamond tails, face-
sampling bit or other type, whether core
is oriented and if so, by what method,
etc).
• Drilling is diamond drilling NQ core
size and is triple tube drilling. Core
is oriented where possible using
the Reflex ACT III tool.
Drill
sample
recovery
• Method of recording and assessing core
and chip sample recoveries and results
assessed.
• Measures taken to maximise sample
recovery and ensure representative
nature of the samples.
• Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse
material.
• Core is measured after each run
and core recovery based on the
drill metres is recorded.
• Once in the transition and fresh
material, Triumph experiences
limited to no core loss with the
exception of intensely broken
zones where recovery is still > 95%.
• No relationship has been observed
between sample recovery and gold
grade.
Logging • Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource
• The drill core has been geologically
and geotechnically logged to a level
to support appropriate mineral
15 | P a g e
Criteria JORC Code explanation Commentary
estimation, mining studies and
metallurgical studies.
• Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.
• The total length and percentage of the
relevant intersections logged.
resource estimation, mining studies
and metallurgical studies. Core is
logged both qualitatively and
quantitatively. Core tray
photography is both wet and dry
photography.
• Sampling is discrete based on
observed mineralisation, alteration,
key structural features.
Sub-
sampling
techniques
and sample
preparation
• If core, whether cut or sawn and whether
quarter, half or all core taken.
• If non-core, whether riffled, tube
sampled, rotary split, etc and whether
sampled wet or dry.
• For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
• Quality control procedures adopted for
all sub-sampling stages to maximise
representivity of samples.
• Measures taken to ensure that the
sampling is representative of the in situ
material collected, including for instance
results for field duplicate/second-half
sampling.
• Whether sample sizes are appropriate to
the grain size of the material being
sampled.
• Core is cut to ½ core before being
dispatched to the laboratory.
• The PREP-31B method includes
crush to 70 % passing 2mm, riffle
split off 1kg, pulverise split to
better than 85% passing 75
microns. The larger 1kg riffle split is
larger than the standard 250g to
reduce sample size bias.
• Sampling size is suitable to
represent the mineralisation
intersected.
Quality of
assay data
and
laboratory
tests
• The nature, quality and appropriateness
of the assaying and laboratory
procedures used and whether the
technique is considered partial or total.
• For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations factors
applied and their derivation, etc.
• Nature of quality control procedures
adopted (eg standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (ie lack of bias) and precision
have been established.
• All samples were analysed at ALS
Global (ALS, Brisbane).
• All samples were assayed for Au
using a 50g fire assay with AU-
ICP22 determination as well as ME-
MS61 for multi element. In the case
where key elements are over range,
Ag, Pb, Zn, and Cu was completed
using OG-62. As completed with
OG46, and Au completed with
GRA22. Sb completed with XRF15c
and Hg completed with MS42.
• The three types of QAQC samples
were used were Certified Reference
Material (CRM/Standards), Field
Duplicates, and Blank material.
• The Blanks consist of store-bought
sand which has been shown to be
barren based on previous work.
The Blanks are used to provide
information of any possible
contamination or calibration issues
during the crush, pulverisation, and
analytical phases. The field
duplicates utilised the spear to
collect a second sample to test
repeatability (precision) of the
original sample. The standards
16 | P a g e
Criteria JORC Code explanation Commentary
samples are used to test the
accuracy of the analyses.
• Three CRMs were OREAS standards
and include: OREAS 277, OREAS
245, and OREAS 233.
• QAQC samples were entered into
the sample stream at a rate of 1 in
20.
• Where lower detection limits were
reported for assay results these
were replaced by half the lower
detection limit for geological
interpretation and modelling
pur
Share your feedback
Discover