Quarterly Activities and Cashflow Report
Released
Released
Announcement PDF
ASX Release
Report for the Quarter Update
Ended 31 December 2015
29 January 2016
ASX Code: DTM
Key Projects:
Unicorn Porphyry: Mo-Cu-Ag
Copper Quarry: Cu-Au
Gentle Annie: Cu
Morgan Porphyry: Mo-Ag-Au
Fairley’s: Au
Mountain View: Au
Investment Data:
Shares on issue: 259,924,632
Corporate Update
Development work progressed at the Mountain View Au project ahead of a
“Decision to Mine” board resolution expected to be made in February.
A review of exploration geochemistry work (pXRF) along strike, north of the
Mountain View mine has identified arsenic soil anomalies that require further
investigation.
The Company issued a small amount of stock in a private placement in
November raising $200,000 for ongoing work at Mountain View and Rushworth.
Final investigations into the Mt. Unicorn Mo project concluded with a
decision to halt any further works given the dire situation in the Mo market. (See
chart below)
Unlisted options: 12,473,048
All resolutions at the AGM on the 27th November were carried affirmatively
by overwhelming margins.
Substantial Shareholders:
Negotiations with joint-venture partner Northern Mine Ventures Pty Ltd
concluded with a binding agreement to develop established Au mining and
exploration tenements at Rushworth and Beechworth in Victoria.
Top 20 Holdings: 53.94%
Work has begun – on site - at Rushworth with mapping and modelling of the
project area and mineralisation (see below for further information)
Board & Management:
Managing Director: James Chirnside
Non-Executive Director: Luke Robinson
Non-Executive Director: Russell Simpson
The Company continued to cut costs throughout the period, particularly at
the corporate overhead level and notes plans for further cost reductions to be made
in this area.
Company Secretary: Julie Edwards
The drawdown in cash reflects the substantial work completed during the
period in development work around the Mountain View Au project.
Dart Mining NL
The company entered into further non-binding negotiations on additional
prospective historic gold field tenements. The company expects to extend and
broaden these discussions moving forward.
ACN 119 904 880
Contact Details:
4 Bryant Street, Corryong VIC 3707 Australia
James Chirnside
Phone: +61 (0)498 732 742
Email: jchirnside@dartmining.com.au
Visit our webpage: www.dartmining.com.au
The ongoing R&D concession dispute with Innovation Australia is
progressing positively under the internal review process and we expect further
guidance on this before the end of March.
The A$ and US$ bullion price remained steady and within the Company’s
anticipated range and expectations. This trend lends further credence and
confidence to the Company’s revised strategy of achieving operating profitability
from Au development and production. (See chart below)
GOLD ASSET DEVELOPMENT UPDATE
Consistent with the Company’s revised strategy and focus on Au development and production Dart has
prioritised and focused work on two specific projects at Mountain View and Rushworth in Victoria.
Figure 1. Dart Mining and JV Tenement Locations with Key Prospect Location Plan.
MOUNTAIN VIEW PROJECT (ML5559)
Bulk Sample / Metallurgical Program
Scoping level mine design and costing aspects of the proposed Mountain View open pit have been
completed with economic assessment awaiting the results of metallurgical testing from recently
completed bulk sampling. The bulk sampling program was designed to provide gold recovery details
and indicative processing operating costs associated with consumables. The results of the metallurgical
testing will assist with the selection of the best toll treatment facility for the mineralisation style. The bulk
sample was excavated from the base of the existing open pit. The sampling targeted what is interpreted
to represent the upper portion of a high grade shoot (silica / sulphide lens) developed within the envelope
of the Main Lens structure, exploited by the existing open pit (mined in 1992 by a private company).
Drilling carried out by Dart Mining identified high grade gold mineralisation only some 3m below the
current pit floor. The shallow excavation uncovered a silica / sulphide rich lens (Photographs 1 & 2)
enclosed within an envelope of lower grade material, consistent with the geological model. Samples of
both the high and low grade material have been submitted for a series of metallurgical tests, results are
expected early in the March Quarter.
Photograph 1. Bulk Sample excavation
Photograph 2. High Grade Sample
2
Mountain View Line – Further Potential and Drill Targeting
The program of portable XRF (pXRF) infill soil geochemistry reported in the September 2015 quarter
shows four strong arsenic in soil anomalies developed over a strike length of 1.3km, to the north of the
Mountain View mine (Figure 2). These four arsenic in soil anomalies (See ASX DTM 16 Oct 2015) and
the existing soil anomalies identified south of the Mountain View pit now show up to six target zones.
These targets represent likely repetitions of gold mineralised sulphide lenses along the strike of the
Brown’s Creek fault over some 2 km of strike length with the larger anomalies worthy of first pass
shallow drilling with an aim to expand the Mountain View line resource base.
Figure 2. Infill pXRF Soil As geochemistry colour contour over
previous gold soil results – north of Mountain View pit and
approved Mining Licence ML5559. Plan also shows previous rock
chip and grab sampling at the New Discovery Mine.
3
FAIRLEY’S PROJECT
A Mineralisation Report is currently being prepared for the Fairley’s Project using all available drill and
rock chip data to model the drill tested near surface mineralisation. Additional soil traverses are planned
to further expand and better define the very broad As in soil anomaly defined over approximately 400m
width across strike over the western portion of the most southern soil line – 5,921,400mN (Figure 3). In
addition, a Work Plan will be prepared for drilling to further test the shallow mineralisation already tested
by a small drill program (December 2014) with first pass shallow drilling also being considered for the
new Western Line along potential ridge top access.
Figure 3. pXRF Soil As geochemistry colour contour over topography showing the location of historic workings and
various parallel and strike extensions of mineralised shear systems at Fairley’s Project – Buckland EL4724.
NORTHERN MINE VENTURES (NMV) JOINT VENTURE
Dart announced the Northern Mine Ventures Pty Ltd (NMV) Joint Venture (JV) agreement 13 November
2015. The JV agreement required registration by the Department of Economic Development, Jobs,
Transport and Resources (DEDJTR) of a 50% interest by Dart Mining NL in NMV’s tenements.
Notification of the creation of interest agreements were registered on 9 December 2015 against EL4697
and EL5315 (Beechworth and Mitta Mitta tenements – Figure 1).
Following the compilation of extensive due diligence research conducted prior to the JV agreement, it is
now appropriate to provide an update on the JV tenements and key targets.
The NMV JV tenement package comprises 44.8 Ha under mining licenses MIN5246, 5306 & 5538 in
Rushworth, Central Victoria and 231 Graticules under Exploration License EL4697 & EL5315 in
northeast Victoria (Figure 1).
4
Rushworth Tenements
Rushworth was an early hard rock goldfield in Victoria with underground operations within the NMV JV
tenements first recorded in 1857 from the Appleton’s zone. Gold mineralisation is hosted within quartz
veins developed in various orientations resulting from thrust faulting through the folded sediments. The
folds and bedding in the local area strike east – west with the main underground working (Phoenix Shaft
to 45m) showing evidence for close vertical stacking of north dipping mineralised faults. These north
dipping faults cross cut bedding in the south limb of the anticlinal fold and become bedded in the north
limb. Where the main north dipping faults cross cut the dip of bedding, fault parallel quartz veining is
observed, quartz veins are also developed within bedding and cleavage and perpendicular to bedding;
collectively forming a halo to the main fault structure. A geology cross section through the Phoenix
Anticline (Figure 4) illustrates the interpretation of vertically stacked shallow north dipping mineralised
faults. The faults project up dip from the anticline axis and at outcrop can be defined by extensive open
pits, trenches and shafts over the entire length of the tenements (some 950m).
Figure 4. Simplified Geological Cross Section Interpretation (Looking West), Rushworth NMV JV Tenement
MIN5306. Geological model indicates stacked stockwork zones halo shallow north dipping thrust faults in
south limb sediments. Drilling conducted by New Holland Mining NL indicates isolated high grade
intersections and recorded visible gold during chip logging (PXB15 – 48m downhole – Appleton’s Zone).
5
Historic workings are not recorded below the 45m Phoenix mine level and commonly only exploited
shallow high grade gold shoots to 10 – 20m down dip. The historic workings at surface are not
continuous over the full 950m along strike, apparently being offset by near north-south faulting with down
dip offsets also causing historic miners to loose very rich gold shoots only to have the offset portion
discovered in an adjacent claim. The general trend of the outcropping mineralisation is evident
throughout the length of the mining licenses (Figure 1 Inset) and illustrates the structural continuity of the
main faults. There are numerous reports of mining bonanza grade shoots within the NMV JV mining
tenements at Rushworth with a report from the Argus newspaper (10/11/1859) stating that the
Chinaman’s Hill Reef has averaged 7oz/t (218 g/t Au) since it was first worked, and that from one bucket
of stone (quartz reef material) 180oz have been taken, and 265oz from another. The reports of multiple
ounce per tonne mineralisation is noted from along the main mineralised faults over the 950m of outcrop,
historic reports also observe payable spur zones at the 45m level in the Phoenix shaft but do not provide
reliable production figures.
Rushworth Mining and Resource Evaluation Strategy
The strategy for development of the Rushworth JV mining tenements involves progressive small scale
mining to target near surface, high grade drill intersections via small open pits. Drill grade and
production grade can then be directly compared to build up a grade estimation process which can then
be applied to the rest of the drilled mineralisation and any further drilling conducted by Dart Mining. The
organic growth path proposed is appropriate at Rushworth given a number of shallow drill indicated
targets exist, suitable toll treatment facilities are readily available within close trucking distances and the
mineralisation style is very simple metallurgically with high gold recoveries expected. The simple
metallurgy is predominantly a result of the coarse free gold particles within the quartz, making the
mineralisation particularly suitable for simple gravity separation. A typical example of the coarse gold
recovered by gravity separation from drill samples from the Phoenix reef is shown in (Photograph 3).
Photograph 3. 10kg Drill Sample - gravity recovered
gold particles up to 2.29g in weight. Top image
enlarged lower left area in bottom image.
While small scale mining is being evaluated, Dart aim to define the larger scale potential of the
Rushworth JV mineralisation, developed within interpreted stacked fault stockwork zones (Figure 4) over
950m of strike and open below 50m depth from surface. Past mining has exploited only small,
discontinuous areas of very high grade gold mineralisation, predominantly only to shallow depths due to
frequent internal faulting offsets. The deepest known mining within the tenements is recorded to 45m
below surface, the geological model indicates further fault repetitions are likely and remain unexplored.
Evaluation of the large scale potential will focus on the definition of grade within the areas remaining
6
following the high grade historic mining, hosted within the series of stacked stockwork halos to the thrust
faults (Figure 4). The feasibility of the larger resource potential will be evaluated following Work Plan
approval for small scale mining, additional drilling and resource estimation. The coarse, erratic nature of
this style of gold mineralisation, typical of Central Victorian gold fields, makes resource estimation via
drilling alone impractical. The use of small scale production to estimate average grades along the
mineralised fault structures helps to overcome the small sample size available with drilling and also
provides early gold production potential from the licenses following Work Plan approval.
Beechworth Tenement
The Beechworth Tenement (EL4697 – currently under a Retention Licence Application) forms a part of
the NMV JV package and is located in north east Victoria (Figure 1). The tenement contains the main
production centres of the historic Beechworth – Stanley Goldfield. Gold mineralisation typically occurs
within quartz vein structures that form predominantly parallel with bedded north-south shear zones, but
can also form within pipe like stockwork zones associated with the interaction of shears with large
sandstone beds. Gold mineralisation is broadly scattered along two corridors within the tenement. The
east corridor is approximately 1km wide and hosts the Taff, Bon Accord and Homeward Bound
(Hillsborough) reef lines. The west corridor trends from Mt Stanley through to the Hurdle Flat Goldfield.
Both corridors trend around 330° strike. Gold mineralisation is associated with quartz vein development
and is generally present as free gold and minor associated sulphides, historical processing has relied
upon simple gravity separation to recover the majority of the gold.
The Hillsborough Group is a collection of mines situated approximately 7km south-west of
Yackandandah. The Homeward Bound mine was the most productive mine in this area producing
31,872ozs of gold from 61,199t of ore, averaging 16.2g/t Au between 1865-1893 and a total recorded
production of approximately 114,195 tons yielding 47,942 oz of gold. This information has been
summarised from open file EL tenement reports and unpublished geological reports by the Geological
Survey of Victoria.
The Hurdle Flat group of mines are situated around 8km east of the township of Beechworth and lie
around 7km north-west of the Homeward Bound (Hillsborough) Group. The historical Hurdle Flat
Goldfield contains the Wallaby, Rachebite, Kerry Eagle and Homeward Bound (Rocky Point) mines. The
main production centre in the Hurdle Flat group of mines is the Homeward Bound (Rocky Point) with
historic mining developed on a bedded 74° west dipping quartz vein. The workings consist of a main
shaft sunk to 207m depth and associated production levels. Production records show 9911t for 8143ozs
(25.6g/t Au) was mined between 1864 and 1894. A further 12,658t for 2516ozs (6.18g/t Au) were mined
at a later period between 1902-1906. This information has been summarised from open file EL tenement
reports and unpublished geological reports by the Geological Survey of Victoria.
The targets sought within the Beechworth area are of moderate size with a number of drill ready targets
already generated with potential for similar mineralisation to past production areas. The drill ready
targets represent potential repeat structures within the Hillsborough Goldfield with detailed historic
research providing considerable encouragement for further evaluation. Exploration within the tenement
will require work plan preparation and approval.
7
Tenement Status Report as at December 31 2015
Renewal applications for EL4724 (Buckland) and EL4726 (Dart) have been submitted. The majority of
the key projects are located inside these two tenements with ongoing exploration planned ahead of
further resource estimation and subsequent application for either additional mining licenses (ML) or
retention licenses (RL). A renewal application for the three Rushworth joint venture mining tenements
ML5246, 5306 and 5538 has been submitted to DEDJTR, seeking a further 5 years renewal period. Dart
Mining prepared an application for a Retention License (RL) over the highly prospective portions of
EL4697 (Beechworth), this RL application has been submitted to DEDJTR. Pending approval of the RL,
exploration activities within the area of EL4697 covered by the RL Application are permitted.
Tenement Number
EL4724
EL4726
EL5058
EL5194
EL5467
EL5468
ML5559
ML5246
ML5306
ML5538
EL4697
EL5315
Name
Tenement Type
Buckland2
Dart1&2
Cudgewa
Mt. Alfred
McCormacks
Upper Murray
Mt View2
Chinaman’s
Phoenix
Rushworth
Beechworth
Mitta Mitta
Exploration
Exploration
Exploration
Exploration
Exploration
Exploration
Mining
Mining
Mining
Mining
Exploration
Exploration
Area (Grats)
Unless specified
82
680
413
51
92
198
4.8 Ha
5 Ha
5 Ha
34.8 Ha
36
195
Interest
Location
100%
100%
100%
100%
100%
100%
100%
50% JV
50% JV
50% JV
50% JV
50% JV
NE Victoria
NE Victoria
NE Victoria
NE Victoria
NE Victoria
NE Victoria
NE Victoria
Central Victoria
Central Victoria
Central Victoria
NE Victoria
NE Victoria
All tenements remain in good standing at 31 December 2015.
NOTE 1: Unicorn Project area subject to a 2% NSR Royalty agreement with BCKP Limited (Orion Mine Finance) dated 29 April 2013.
NOTE 2: Areas subject to a 1.5% Founders NSR Royalty Agreement
Competent Persons Statement
The information in this report that relates to Exploration Results is based on information compiled by
Dean Turnbull B.App.Sc.(Geol) Hons. M. AIG, a Competent Person who is a Member of the Australian
Institute of Geoscientists. Mr Turnbull is a full time employee of Dart Mining NL. Mr Turnbull has
sufficient experience that is relevant to the style of mineralisation and type of deposits under
consideration and to the activity being undertaken to qualify as a Competent Person as defined in the
2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves”. Mr Turnbull consents to the inclusion in the report of the matters based on his information in
the form and context in which it appears.
8
JORC CODE, 2012 EDITION – TABLE 1
SECTION 1 SAMPLING TECHNIQUES AND DATA
Criteria
Sampling
techniques
JORC Code explanation
Commentary
Nature and quality of sampling (e.g. cut channels,
random chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc.). These examples
should not be taken as limiting the broad meaning of
sampling.
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of mineralisation that are
Material to the Public Report.
In cases where ‘industry standard’ work has been done
this would be relatively simple (e.g. ‘reverse circulation
drilling was used to obtain 1 m samples from which 3
kg was pulverised to produce a 30 g charge for fire
assay’). In other cases more explanation may be
required, such as where there is coarse gold that has
inherent sampling problems. Unusual commodities or
mineralisation types (e.g. submarine nodules) may
warrant disclosure of detailed information.
Hand held XRF (pXRF)
analysis is performed on the
samples from the top of the
clay layer (B-Horizon) without
pulverization.
XRF calibration is examined
using duplicate samples
submitted for commercial
assay analysis and the
equivalent XRF sample data
compared where possible.
Assay standards are also
included in sampling programs
to establish accuracy. Sample
representivity is examined by
comparison of adjacent
samples – data is reviewed
during interpretation where
geochemical results are
compared against the
geological setting, previous
results and standard reference
material values.
Chip sampling (where
reported) is carried out along a
marked line, perpendicular to
the strike of the mineralisation,
as a series of closely spaced
rock chips within a 50 –
100mm halo to the sample
line. Samples are generally 2
– 3 kg in size, the samples are
shipped to the laboratory,
dried, crushed and whole
sample pulverised prior to riffle
splitting for assay.
Drilling
techniques
Drill type (e.g. core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc.)
and details (e.g. core diameter, triple or standard tube,
depth of diamond tails, face-sampling bit or other type,
whether core is oriented and if so, by what method,
etc.).
Rushworth Drilling: Open Hole
(RAB), Reverse Circulation
(RC) and large diameter core
(Selmag 1.5m diameter)
techniques have been used by
past explorers. The hammer
sampling techniques used for
percussion drilling are
unknown. Selmag core drilling
was not orientated.
9
Criteria
Drill sample
recovery
JORC Code explanation
Commentary
Method of recording and assessing core and chip
sample recoveries and results assessed.
Measures taken to maximise sample recovery and
ensure representative nature of the samples.
Whether a relationship exists between sample recovery
and grade and whether sample bias may have occurred
due to preferential loss/gain of fine/coarse material.
Logging
Whether core and chip samples have been geologically
and geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining
studies and metallurgical studies.
Whether logging is qualitative or quantitative in nature.
Core (or costean, channel, etc.) photography.
The total length and percentage of the relevant
intersections logged.
Sub‐sampling
techniques
and sample
preparation
Quality of
assay data
and
laboratory
tests
No reference to recovery has
been located in hardcopy drill
logs. There are descriptive
accounts in drill logs and
internal company reports that
highlight where no recovery
occurred or where voids /
underground workings were
intersected.
New Holland Mining NL RC
holes were chip tray logged
over 1m intervals, original
logging sheets were submitted
in their annual reports, this
information is currently not all
entered into digital format.
NMV RC holes were logged
over 1m intervals according to
the colour of the sample
interval
No records for the methods
If core, whether cut or sawn and whether quarter, half
used in sampling RC drill
or all core taken.
cutting have been
If non-core, whether riffled, tube sampled, rotary split,
documented for either
etc. and whether sampled wet or dry.
company. Open Hole (RAB)
For all sample types, the nature, quality and
sampling by New Holland
appropriateness of the sample preparation technique.
Mining NL shows cuttings
Quality control procedures adopted for all sub-sampling
were taken from the hole
stages to maximise representivity of samples.
collar to a cyclone where they
Measures taken to ensure that the sampling is
were split into a 5 litre bucket.
representative of the in situ material collected, including
A 3 kilogram sample was
for instance results for field duplicate/second-half
taken from this split at 3 metre
sampling.
intervals for assay. No record
Whether sample sizes are appropriate to the grain size
of the method used for the
of the material being sampled.
split at the cyclone or the
subsample split are provided.
No method has be located to
describe the splitting process
used for the 1.5m diameter
Selmag drill core sampling
process and any subsequent
sub-sampling for gravity
separation (results for which
are shown in Photograph 3).
The nature, quality and appropriateness of the assaying Soil gold levels (where
determined) use ALS
and laboratory procedures used and whether the
technique Au-AA22, which is
technique is considered partial or total.
a low detection limit
For geophysical tools, spectrometers, handheld XRF
(0.001ppm) technique
instruments, etc., the parameters used in determining
commonly used in
the analysis including instrument make and model,
geochemical investigations.
reading times, calibrations factors applied and their
Rushworth Drill sampling:
derivation, etc.
There are no detailed
Nature of quality control procedures adopted (e.g.
accounts of the analytical
standards, blanks, duplicates, external laboratory
methods used by both NMV
checks) and whether acceptable levels of accuracy (i.e.
and New Holland Mining NL.
lack of bias) and precision have been established.
Original analytical assay
sheets for the New Holland
Mining NL drilling contain only
a limited amount of
10
Criteria
JORC Code explanation
Commentary
information. No records for
the drilling by NMV have been
sourced. The common Fire
Assay technique used for gold
analysis has been established
to generally under estimate
samples containing erratic,
coarse gold. Numerous
industry papers provide
explanation of the difficulties
in representative sampling
and assaying for gold within a
coarse gold environment.
No evidence of interval
laboratory
duplicates
or
standards were recorded.
Limited
laboratory
repeat
assay have been located and
reviewed, showing highly
variable repeat assay – typical
of coarse gold environments.
No original assay sheets have
been located for NMV RC
drilling.
Internal company report by
NMV have reported that Fire
Assay (50g charge) does not
accurately represent the
sample
Verification
of sampling
and assaying
The verification of significant intersections by either
independent or alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures,
data verification, data storage (physical and electronic)
protocols.
Discuss any adjustment to assay data.
Verification of significant
intersections were made by
alternative company
personnel.
Data were logged onto paper
and transferred to a
spreadsheet and checked
Electronic only assay data is
imported into a spreadsheet
from the laboratory’s electronic
data or the pXRF unit.
Rushworth Drilling: Random
checks of original assay files
against drill database were
carried out and show 100%
correlation. A digital database
of assay and lithology were
available to the JV Tenements.
Location of
data points
Accuracy and quality of surveys used to locate drill
holes (collar and down-hole surveys), trenches, mine
workings and other locations used in Mineral Resource
estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
Hand held GPS locations mark
the start and end of each soil
line, soil sample locations are
then either located by GPS or
measured offsets along soil
lines by tape and compass
(corrected for slope) –
Absolute location accuracy is
+/- 10 – 15m.
All maps, plans and data are
on an MGA datum and GDA94
11
Criteria
JORC Code explanation
Commentary
zone 55 projection.
Elevation is established from
government 10 and 20m
contour mapping.
Drill Collars/Down Hole
Survey: New Holland Mining
NL did not specify how drill
collars were located;
coordinates were recorded in
local grid. NMV used a hand
held GPS to locate drill collars
in AGD66 datum. All drill collar
coordinates were converted
from AMG66 to MGA94 using
the Micromine survey function
and validated against surface
mapping and minor
adjustments made in the
database. No down hole
survey data is available, RC
and RAB holes are up to 86m
in length (there is likely to have
been hole deviation that is not
reflected in the 3D
interpretation causing an
unknown level of inaccuracies
in data location).
Data spacing
and
distribution
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient
to establish the degree of geological and grade
continuity appropriate for the Mineral Resource and Ore
Reserve estimation procedure(s) and classifications
applied.
Whether sample compositing has been applied.
Orientation of Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which
data in
this is known, considering the deposit type.
relation to
If the relationship between the drilling orientation and
geological
the orientation of key mineralised structures is
structure
considered to have introduced a sampling bias, this
should be assessed and reported if material.
Soil data spacing varies across
prospects and different
mineralisation styles – spacing
is based on expected
continuity of mineralisation, no
data compositing or
manipulation is carried out.
Drill holes at Rushworth are
variably spaced along strike
from 15 – 40m and drilled
predominantly at near right
angles to local strike but at a
variable dip to the dominant
mineralisation orientation (see
below). Data spacing from
drilling is appropriate to
construct the 3D geological
model; a simplified
representation is presented in
cross section (Figure 4).
Soil sampling lines are,
wherever possible, oriented as
close to perpendicular as
possible to the expected strike
of mineralisation.
Rushworth drilling is generally
orientated near perpendicular
to the strike of mineralisation,
however the dip direction of
drilling is variable and some
holes are drilled down dip to
the main orientation of
mineralisation (examples
12
Criteria
Sample
security
JORC Code explanation
The measures taken to ensure sample security.
Commentary
Audits or
reviews
The results of any audits or reviews of sampling
techniques and data.
presented in Figure 4) – the
impact on the development of
the 3D geological model is
limited, however this
orientation may cause an
overstatement of drill gold
grade where drilling is within
the fault (this has not been
observed in the data). Drilling
parallel to but outside the
min
Share your feedback