Triumph Diamond Drilling Visuals - Amendment
Released
Released
Announcement PDF
ASX Release
14 March 2025
DRILLING CONFIRMS SULPHIDE MINERALISATION AT TRIUMPH
ANNOUNCEMENT AMENDMENT
Dart Mining NL (ASX:DTM) (Dart Mining or the Company) wishes to advise that the following
amendments have been made to the announcement “Drilling Confirms Sulphide Mineralisation
at Triump” released this Yesterday 13th March 2025.
Amendments Summary:
1. Sample depths of core photographed in Figure 1 added.
2. Additional disclaimer added to Figure 2 to not rely on visual estimates of mineral
abundance.
3. Wording of Figure 2 modified from “current MRE Interpretation” to “current Inferred MRE
Mineralised Domains”.
A copy of the amended announcement is attached.
Approved for release by the Board of Directors.
For more information contact:
James Chirnside
Managing Director
Dart Mining NL
jchirnside@dartmining.com.au
+61 419 605 842
Dart Mining NL
ABN: 84 119 904 880
Level 6, 412 Collins Street
Melbourne VIC 3000
Owen Greenberger
Head of Exploration / Investor Relations
Dart Mining NL
ogreenberger@dartmining.com.au
Contact: James Chirnside
Email: jchirnside@dartmining.com.au
Mobile: +61 447 447 613
Webpage: www.dartmining.com.au
LinkedIn: Dart Mining NL
Twitter: @DartMining
1|Page
ASX Release
14 March 2025
DRILLING CONFIRMS SULPHIDE MINERALISATION AT TRIUMPH
Dart Mining NL (“Dart” or the “Company”) is pleased to provide a drilling update and report visuals
from its first drillholes completed at the company’s Triumph Project. Drilling has confirmed the
presence of sulphides at expected locations as well as additional sulphide veining outside of the
previously defined Mineral resource domains.
HIGHLIGHTS
•
•
•
Significant Sulphide mineralisation intersected in the first 2 drillholes (TRDD001A & TRDD002A)
across multiple veins, in line with Mineral Resource interpretation.
Unexpected veining outside of defined mineral resource area was also intersected at depth in
both holes, these new intersections remain open in all directions (See Figure 2).
Drill holes TRDD001A and TRDD002A, have now been fully logged, photographed and sampled
with samples dispatched to ALS Brisbane for analysis, assay results are expected to be received
by early April 2025.
Figure 1 – Sulphide Vein from TRDD001A (HQ core size) showing sulphides within quartz and carbonate veining, included in
sampling from 77.1 to 77.6m
Visual estimates of mineralisation abundance contained in this announcement should never be considered a proxy or substitute for
Laboratory analysis. Visual estimates potentially provide no information regarding concentration of economic grades or factors,
impurities or deleterious physical properties relevant to valuation.
Darts Chairman, James Chirnside, commented: “Dart is pleased with the visual results from the
drilling processed so far. Drilling has intersected sulphide mineralisation in expected locations, as
well as additional sulphide veining beyond the known resource area. Additional veining identified
at such an early stage of drilling, and in such close proximity to the known resources is an exciting
development and highlights the significant potential for growth despite the extensive work already
completed across the project. The Company is excited to continue the current drill program and
further explore the project, as it works towards upgrading and expanding the Mineral Resource
Inventory”
2|Page
The Company completed 355 metres of drilling across 4 diamond drill holes to the end of February
2025 at the Triumph project. Weather and staffing challenges in the transition to operating in QLD
played a role in the challenging commencement to the drilling program. Operational
improvements have now been put in place, with drilling performance now in line with expectations
and in full swing. As we head into March 2025 the Company does not anticipate any further delays
or issues with drilling.
Figure 2 – logged sulphides (details in appendix 1) in reported holes vs MRE Inferred mineralised domains. Red highlighting new
mineralised zones outside of MRE interpretation.
Visual estimates of mineralisation abundance contained in this announcement should never be considered a proxy or substitute for
Laboratory analysis. Visual estimates potentially provide no information regarding concentration of economic grades or factors,
impurities or deleterious physical properties relevant to valuation.
Drill holes TRDD001A and TRDD002A, spaced 25m along strike, have been fully logged,
photographed and sampled with samples dispatched to ALS Brisbane for analysis. Drill core logging
has highlighted several zones of strong sulphide mineralisation, with routine logging of Pyrite,
Arsenopyrite, Galena, Sphalerite and Chalcopyrite recorded by the site geologists. Mineralisation
logging has been included in appendix 1, table 3 below.
3|Page
Figure 3 – Plan map showing collar location and drill traces of reported holes.
Figure 4 – Drill core photo of tray 21 from TRDD001A showing core between 77.05m and 79.1m.
Visual estimates of mineralisation abundance should never be considered a proxy or substitute for Laboratory analysis. Visual
estimates potentially provide no information regarding concentration of economic grades or factors, impurities or deleterious physical
properties relevant to valuation.
Drill core from both holes is exhibiting the expected geology, with sulphide veining intersected in
heavily altered tonalite host rock highlighted by Figure 4 above. The fluid introducing the sulphide
mineralisation into the host rock is creating significant alteration from the pinkish tonalite to a more
green to yellow hue seen around meter 79 in Figure 4.
4|Page
Sulphide mineralisation outside the current Mineral Resource interpretation was intersected at
depth in both holes, where narrow sulphide rich veins surrounded by heavily altered tonalite were
observed. The intersection of additional sulphide rich veining close to the existing Mineral resource
area is an exciting development early in the exploration program. To identify sulphide
mineralisation close to the existing Mineral Resource inventory after a significant amount of work
has been completed on the project is a great start and highlights the significant growth potential
across the project.
Figure 5 – Drill core photo from TRDD001A showing sulphide veining at 137m downhole.
Visual estimates of mineralisation abundance should never be considered a proxy or substitute for Laboratory analysis. Visual
estimates potentially provide no information regarding concentration of economic grades or factors, impurities or deleterious
physical properties relevant to valuation.
Drilling continues with focus remaining on the Constitution prospects with drilling of the priority 1
holes highlighted in Figure 3 targeting mineralisation along the northeastern boundary of the
Mineral Resource.
NEXT STEPS
At the Triumph Gold Project, Dart intends to:
•
Continue the diamond drilling programme to expand the existing resources along strike and
at depth in accordance with Table 1 below;
•
Undertake regional exploration, targeting the project area, as well as testing bulk tonnage
targets;
•
Continue to review and identify additional prospective target zones for exploration at
Triumph in addition to existing resource areas; and
Continue to review and identify further advanced projects throughout Central Queensland
for potential acquisition or joint venture.
•
Table 1 – Project timelines assuming a single rig operation only
Jan
Triumph
Feb
Mar
Apr
May
Jun
2025
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
2026
Apr
May
Jun
Jul
Group Resource Update
Constitution
Big Hans
Super Hans
Bald Hill
Bingham-Young
Advance
Bald Hill East
5|Page
Approved for release by the Board of Directors.
For more information contact:
James Chirnside
Managing Director
Dart Mining NL
jchirnside@dartmining.com.au
+61 419 605 842
Owen Greenberger
Head of Exploration / Investor Relations
Dart Mining NL
ogreenberger@dartmining.com.au
About Dart Mining
The Triumph Gold Project is Dart’s first step into an advanced intrusion related gold system project in
Queensland. Dart will look to develop a regional presence in Queensland through advanced stage intrusion
related and epithermal gold projects. Dart Mining will continue to evaluate several historic goldfields in
Central and Northeast Victoria including the Rushworth Goldfield and the new porphyry and lithium province
in Northeast Victoria identified by Dart. The area is prospective for precious, base, and strategic metals. Dart
Mining has built a strategic and highly prospective gold exploration portfolio in Central and Northeast
regions of Victoria, where historic surface and alluvial gold mining indicates the existence of potentially large
gold endowment.
Competent Person’s Statement
The information in this report has been prepared, compiled, and verified by Mr. Owen Greenberger (B.Sc.
Geology), a Competent Person who is a Member of the Australian Institute of Geoscientists. Mr. Greenberger
is Head of Exploration for Dart Mining. Mr. Greenberger has sufficient experience that is relevant to the style
of mineralisation and type of deposits under consideration and to the activity being undertaken to qualify
as a competent person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves”. Mr. Greenberger takes responsibility for the exploration
results, and consents to the inclusion in the report of the matters based on his information in the form and
context in which it appears.
Forward-Looking Statement
Certain statements contained in this document constitute forward-looking statements. Forward-looking
statements include, but are not limited to, Dart Mining’s current expectations, estimates and projections
about the industry in which Dart Mining operates, and beliefs and assumptions regarding Dart Mining’s
future performance. Such forward-looking statements are based on a number of estimates and assumptions
made by the Company and its consultants in light of experience, current conditions and expectations of
future developments which the Company believes are appropriate in the current circumstances. When used
in this document, words such as; “anticipate”, “could”, “intends”, “estimate”, “potential”, “plan”, “seeks”,
“may”, “should”, and similar expressions are forward-looking statements. Although Dart Mining believes
that its expectations presented in these forward-looking statements are reasonable, such statements are
subject to known and unknown risks, uncertainties and other factors, which may cause the actual results,
achievements and performance of the Company to be materially different from the future results and
achievements expressed or implied by such forward-looking statements. Investors are cautioned that
forward-looking information is no guarantee of future performance and accordingly, investors are cautioned
not to place undue reliance on these forward-looking statements.
6|Page
APPENDIX ONE
Table 2: Hole collar details.
HoleID
TRDD001A
TRDD002A
Easting
(GDA94 /
MGA Zone 56)
334293.9
334274.8
Northing
(GDA94 / MGA
Zone 56)
7308955.0
7308972.6
RL
Depth
Azimuth
(Magnetic)
155.1
152.6
147.8
128.6
210
210
Dip
-55
-55
Table 3. Mineralisation Logging Details
Hole ID
Meters
From
Meters
To
Width
(m)
Pyrite %
TRDD001A
TRDD001A
TRDD001A
TRDD001A
TRDD001A
TRDD001A
TRDD001A
TRDD001A
TRDD001A
TRDD001A
TRDD001A
TRDD001A
38.00
43.90
47.95
48.25
52.30
52.70
55.65
55.80
59.50
59.85
69.10
71.40
38.35
47.95
48.25
52.30
52.70
55.65
55.80
59.50
59.85
62.00
71.40
76.60
0.35
4.05
0.30
4.05
0.40
2.95
0.15
3.70
0.35
2.15
2.30
5.20
5
0.1
0.2
0.1
2
0.2
5
0.1
5
1
5
1
0.5
TRDD001A
76.60
78.60
2.00
5
15
TRDD001A
TRDD001A
TRDD001A
TRDD001A
TRDD002A
78.60
82.15
82.75
137.30
0.00
82.15
82.75
137.30
138.50
20.80
3.55
0.60
54.55
1.20
20.80
0.1
5
0.1
5
Arsenopyrite Chalcopyrite Sphalerite
%
%
%
Galena
%
Comments
2
0.1
0.5
0.1
1
1
Mineralized VN
0.5
0.2
1
Mineralized VN with SER ARG Selvage
Abundant PY in SER alt
0.2
0.2
Intense SER altered zone with abundant sulphides
Main Ore zone Broken QTZ sulphide VN with sheared
upper margin
0.5
Abundant PY with strong SER alt
Trace py in VLTs
Mineralised VN with SR Altered selvage
Precollar no sample
7|Page
TRDD002A
TRDD002A
TRDD002A
TRDD002A
TRDD002A
TRDD002A
TRDD002A
TRDD002A
TRDD002A
TRDD002A
38.40
40.50
41.00
44.00
50.60
60.00
67.00
69.00
70.00
92.50
40.50
41.00
44.00
44.50
51.10
60.60
69.00
70.00
77.50
93.90
2.10
0.50
3.00
0.50
0.50
0.60
2.00
1.00
7.50
1.40
0.3
2
0.2
2
1
0.2
0.5
2
0.1
0.1
TRDD002A
93.90
96.10
2.20
0.5
TRDD002A
TRDD002A
TRDD002A
96.10
119.80
120.70
119.80
120.70
128.60
23.70
0.90
7.90
0.1
5
0.1
2
0.1
0.1
0.1
Also trace cpy
trace sulphides in Vlts
0.5
0.1
0.5
Trace py with sericite alteration
0.1
2
0.5
0.1
0.2
Mineralized zone
Also trace GA in VNs. Altered zone with parallel VLTs
with CHL AB SER alteration
Abundant py in Argilic alteration
Trace py DS and on fractuires
Visual estimates of mineralisation abundance should never be considered a proxy or substitute for Laboratory analysis. Visual estimates potentially provide no information regarding
concentration of economic grades or factors, impurities or deleterious physical properties relevant to valuation.
8|Page
APPENDIX TWO
JORC Code, 2012 Edition – Table 1 report template
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Sampling
techniques
• Nature and quality of sampling (eg cut channels, random chips, or
specific specialised industry standard measurement tools appropriate
to the minerals under investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc). These examples should
not be taken as limiting the broad meaning of sampling.
• Include reference to measures taken to ensure sample representivity
and the appropriate calibration of any measurement tools or systems
used.
• Aspects of the determination of mineralisation that are Material to the
Public Report.
• In cases where ‘industry standard’ work has been done this would be
relatively simple (eg ‘reverse circulation drilling was used to obtain 1
m samples from which 3 kg was pulverised to produce a 30 g charge
for fire assay’). In other cases more explanation may be required,
such as where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types (eg
submarine nodules) may warrant disclosure of detailed information.
• Drill type (eg core, reverse circulation, open-hole hammer, rotary air
blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple
or standard tube, depth of diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by what method, etc).
• Method of recording and assessing core and chip sample recoveries
and results assessed.
• Measures taken to maximise sample recovery and ensure
representative nature of the samples.
• Whether a relationship exists between sample recovery and grade
and whether sample bias may have occurred due to preferential
loss/gain of fine/coarse material.
Drilling
techniques
Drill sample
recovery
Commentary
•
No sampling or results are reported and is not applicable
•
Standard tube HQ diamond drilling was utilised with bottom of
hole core orientation completed every run. An Axis orientation
tool was utilised.
•
Core recoveries for DD was recorded by measuring the total
amount of core between each core block. This was then
compared to the recovery noted on the core block by the driller
and any errors were rectified. The Rock Quality Designation
(RQD) value is calculated by summing the total length of core in
the run composed of pieces of core greater than 10 cm in
length. The recovery and RQD are both converted to a
percentage of the recovery during the data entry phase. At this
9|Page
Criteria
Logging
Subsampling
techniques
and sample
preparation
Quality of
assay data
and
laboratory
tests
JORC Code explanation
• Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical
studies.
• Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
• The total length and percentage of the relevant intersections logged.
• If core, whether cut or sawn and whether quarter, half or all core
taken.
• If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
• For all sample types, the nature, quality and appropriateness of the
sample preparation technique.
• Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
• Measures taken to ensure that the sampling is representative of the in
situ material collected, including for instance results for field
duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain size of the material
being sampled.
• The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is considered
partial or total.
• For geophysical tools, spectrometers, handheld XRF instruments, etc,
the parameters used in determining the analysis including instrument
make and model, reading times, calibrations factors applied and their
derivation, etc.
• Nature of quality control procedures adopted (eg standards, blanks,
Commentary
•
time, further geotechnical information is recorded such as
Longest Unbroken Piece (LUP) and Rock Strength. The LUP is
recorded as the longest piece of core within each block-to-block
interval. The Rock Strength class is recorded as an average, also
between core block to core block. Fracture count involved
counting individual fractures within a drill run. If the core was
crushed and fractures were too numerous to accurately count,
it was given the designation “999” which indicated a highly
fractured zone.
The drill core has been geologically and geotechnically logged to
a level to support appropriate mineral resource estimation,
mining studies and metallurgical studies. Core is logged both
qualitatively and quantitatively. Core and photography is
available.
•
No results from sampling have been reported in this
announcement.
•
No results from sampling have been reported in this
announcement.
10 | P a g e
Criteria
JORC Code explanation
Commentary
duplicates, external laboratory checks) and whether acceptable levels
of accuracy (ie lack of bias) and precision have been established.
Verification
of sampling
and
assaying
Location of
data points
•
•
•
•
•
•
•
The verification of significant intersections by either independent
or alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
Discuss any adjustment to assay data.
Accuracy and quality of surveys used to locate drill holes (collar
and down-hole surveys), trenches, mine workings and other
locations used in Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
•
No results from sampling have been reported in this
announcement.
•
The location of drill hole collars were confirmed with a Trimble
DA2 receiver and Catalyst 0.3m Subscription set to MGA94 Grid
Datum (Zone 56)
Accuracy is variable but is expected to be 0.3m
During the mapping and Collar pickup process with constant
visual quality assessment conducted, the receiver maintained
an accuracy level <0.4m.
Down hole, multi-shot surveys were taken at 15m then a
nominal 30 m interval where possible using a Trueshot survey
tool. A 3m multi-shot survey was conducted at end of hole.
No results from sampling have been reported in this
announcement.
•
•
•
Data spacing
and
distribution
Orientation
of data in
relation to
geological
structure
•
•
•
•
•
Sample
security
•
Audits or
reviews
•
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
Whether sample compositing has been applied.
Whether the orientation of sampling achieves unbiased sampling
of possible structures and the extent to which this is known,
considering the deposit type.
If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to have
introduced a sampling bias, this should be assessed and
reported if material.
The measures taken to ensure sample security.
•
The results of any audits or reviews of sampling techniques and
data.
•
Drilling is typically orientated perpendicular to the interpreted
strike of mineralization where possible.
•
No results from sampling have been reported in this
announcement.
•
No audits or reviews have been completed of sampling
techniques.
11 | P a g e
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
Mineral
tenement
and land
tenure status
JORC Code explanation
•
•
Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint
ventures, partnerships, overriding royalties, native title interests,
historical sites, wilderness or national park and environmental
settings.
The security of the tenure held at the time of reporting along with
any known impediments to obtaining a licence to operate in the
area.
Commentary
•
•
•
Exploration
done by
other parties
•
Acknowledgment and appraisal of exploration by other parties.
•
•
Geology
•
Deposit type, geological setting and style of mineralisation.
•
•
The Triumph project consists of EPM 18486 and EPM 19343,
both 100% owned by XXXX Gold Pty Ltd, a wholly owned
subsidiary of Sunshine Gold Limited. The tenements are in good
standing and no known impediments exist. Dart Mining NL has
completed the acquisition of these two tenements and the
process to transfer title is underway.
ML80035 (covering an area of 0.2km) is located within the
project area and is excluded from the tenure.
Exploration is prohibited within a small area of Category B
environmentally protected area as well as a National Park
shown in Figure 2. The current approved Environmental
Authority (EA) allows for advanced exploration activities to
occur up to the National Park (NP) boundary.
AMOCO conducted limited exploration focussing on the Bald
Hill vein in 1987. Seven RC holes were drilled at Bald Hill. The
bulk of exploration across the tenure has been conducted by
Metal Bank Limited and subsidiary Roar Resources between
2012 – 2020.
Historical Exploration data and production records were
compiled via open file reports accessible via the QLD Geological
Survey QDEX system (notably Ball. L.C. 1906. Report on the
Norton Goldfields, Queensland Geological Survey Publication
208).
EPM18486 and EPM19343 overlaps the Calliope and Miriam
Vale 1:100,000 map sheets.
The style of mineralisation intersected is interpreted to be
intrusion-related gold mineralisation within the northern New
England Orogen.
12 | P a g e
Criteria
Drill hole
Information
JORC Code explanation
•
•
Data
aggregation
methods
•
•
•
Relationship
between
mineralisatio
n widths and
intercept
lengths
•
Diagrams
•
Balanced
reporting
•
•
•
A summary of all information material to the understanding of the
exploration results including a tabulation of the following
information for all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea
level in metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
If the exclusion of this information is justified on the basis that
the information is not Material and this exclusion does not
detract from the understanding of the report, the Competent
Person should clearly explain why this is the case.
In reporting Exploration Results, weighting averaging
techniques, maximum and/or minimum grade truncations (eg
cutting of high grades) and cut-off grades are usually Material
and should be stated.
Where aggregate intercepts incorporate short lengths of high
grade results and longer lengths of low grade results, the
procedure used for such aggregation should be stated and some
typical examples of such aggregations should be shown in detail.
The assumptions used for any reporting of metal equivalent
values should be clearly stated.
These relationships are particularly important in the reporting of
Exploration Results.
If the geometry of the mineralisation with respect to the drill hole
angle is known, its nature should be reported.
If it is not known and only the down hole lengths are reported,
there should be a clear statement to this effect (eg ‘down hole
length, true width not known’).
Appropriate maps and sections (with scales) and tabulations of
intercepts should be included for any significant discovery being
reported These should include, but not be limited to a plan view
of drill hole collar locations and appropriate sectional views.
Where comprehensive reporting of all Exploration Results is not
practicable, representative reporting of both low and high grades
and/or widths should be practiced to avoid misleading reporting
of Exploration Results.
Commentary
•
Drillhole information has been included in the release in
Appendix 2.
•
No data aggregation methods have been applied.
•
Mineralisation widths are reported as the downhole length. Final
interpretation and inclusion of sample results will allow for true
width calculations to be applied.
•
Included in the body of the announcement.
•
All mineralisaiton intersected in completed holes has been
included
13 | P a g e
Criteria
JORC Code explanation
Other
substantive
exploration
data
•
Further work
•
•
Other exploration data, if meaningful and material, should be
reported including (but not limited to): geological observations;
geophysical survey results; geochemical survey results; bulk
samples – size and method of treatment; metallurgical test
results; bulk density, groundwater, geotechnical and rock
characteristics; potential deleterious or contaminating
substances.
The nature and scale of planned further work (eg tests for lateral
extensions or depth extensions or large-scale step-out drilling).
Diagrams clearly highlighting the areas of possible extensions,
including the main geological interpretations and future drilling
areas, provided this information is not commercially sensitive.
Commentary
•
No other material data is presented in this announcement.
•
Plans for further work are outlined in the body of the
announcement which include analysis of the rock chips and
considerations for drill targeting.
14 | P a g e
Share your feedback
Discover