Triumph Delivers Highest Grade Drill Intercepts To Date
Released
Released
Announcement PDF
ASX Release
22nd July 2025
TRIUMPH DRILLING DELIVERS HIGHEST GRADE DRILL INTERCEPTS TO DATE
Dart Mining NL (“Dart” or the “Company”) is pleased to announce an update on its ongoing Triumph
diamond drilling programme. The drilling has aimed to provide further information down plunge
extension at depth to the south of the Big Hans prospect and test the depth potential of the project
in key structural areas.
This update includes assay results and mineralisation observations from drill holes TRDD011 and
TRDD012.
HIGHLIGHTS
Highlight significant assays include:
TRDD011:
• 10.8m @ 1.17 g/t Au from 86.5m;
▪ Including 0.5m @ 16.15 g/t Au and 22.50 g/t Ag from 87.0m;
▪ Also including 0.4m @ 8.35 g/t Au and 28.80 g/t Ag from 96.9m;
TRDD012:
• 4.4m @ 8.99 g/t Au and 28.09 g/t Ag from 171.3m;
▪ Including 1.2m @ 30.93 g/t Au and 86.78 g/t Ag from 171.3m;
• Including 0.3m @ 114.00 g/t Au and 276.00 g/t Ag from 171.3m;
• 3.1m @ 7.98 g/t Au and 30.62 g/t Ag from 179.5m;
▪ Including 1.7m @ 14.85 g/t Au and 56.02 g/t Ag from 180.0m;
• Including 0.5m @ 45.90 g/t Au and 157.00 g/t Ag from 180.5m.
The drill intercept of 114g/t gold is the highest result received from drilling in the Triumph project’s
history, and its first intercept above 100g/t gold (Au). The results have confirmed Dart’s exploration
model of mineralisation continuing at depth, with key structural areas hosting significant, wide, highgrade mineralisation.
Darts Chairman, James Chirnside, commented: “The assay results at Big Hans are an important
milestone in Dart’s diamond drilling program which confirms and extends existing mineralisation
zones. TRDD012 has provided some exceptional numbers that are a direct extension to the Mineral
Resource model and show the exciting depth potential of Triumph.
Dart Mining NL
ABN: 84 119 904 880
Level 6, 412 Collins Street
Melbourne VIC 3000
Contact: James Chirnside
Email: jchirnside@dartmining.com.au
Mobile: +61 447 447 613
Webpage: www.dartmining.com.au
LinkedIn: Dart Mining NL
Twitter: @DartMining
1|Page
The diamond drilling programme has highlighted the critical nature of the structural information
where, before in the absence of structural feedback, targeting is now becoming more refined. Dart’s
technical team are working on how these southern extensions link together and I am very keen to see
if we can discover a connected corridor between prospects Big Hans and Super Hans as we progress
the interpretation.
The current MRE is contained within 20% of identified strike and there are still substantial areas within
the EPM that are in need of exploration follow-up. ”
Dart has completed 2,475m (13 holes) of diamond core drilling across New Constitution, South
Constitution (results previously released (ASX: DTM July 2025), and Big Hans, with assays reported
for the two Big Hans prospect drill holes. Table 1 highlights intercepts that are down dip/southern
extensions to the existing Big Hans Mineral Resource.
The advantage of Dart utilising diamond drilling is that observations of the orientations of all
structures down the drill holes have been collected. The orientation of the structures through the
high-grade zones (within TRDD012 i.e. 0.3m @ 114.00 g/t Au and 0.5m @ 45.90 g/t Au) confirm that
the mineralisation is a direct down plunge extension of the existing MRE, with mineralisation
extending to the south and open at depth. A representation of TRDD011 and TRDD012 is shown in
Figure 1.
Figure 1: Plan map of TRDD011 and TRDD012 relative to existing MRE.
2|Page
Dart’s recent focus on deeper extensions to the high-grade zones of the Triumph prospects is to
highlight the depth potential of the existing Mineral Resource. As shown in the cross sections in Figure
3 and 4, the diamond drilling Dart is progressing is both opening up newly discovered lodes and
providing important depth extensions to the known mineralisation.
Similarly to the drill holes completed in New Constitution and South Constitution, additional lodes have
been identified at Big Hans that are not included in the current Mineral Resource. This is highlighted
by 4 intercepts greater than 2 g/t Au which were discovered deeper in TRDD011. Significant intercepts
and intercepts interpreted to be new lodes are highlighted in Table 1. These new lodes present
additional targets for Dart to consider in future exploration to expand the Mineral Resource Estimate
around the existing known mineralisation.
Table 1: Summary of significant intercepts from two Big Hans holes plus notable new lode intercepts.
Drill Hole Name
From Depth (m)
Thickness (m)
Au g/t
Ag g/t
Notes
TRDD011
24.5
1.6
0.63
2.40
including
25.5
0.5
1.09
4.38
TRDD011
64.8
0.4
1.29
19.10
TRDD011
80.8
2.3
2.23
18.30
Including
80.75
0.4
3.71
27.80
Including
81.5
0.5
5.15
38.60
TRDD011
86.5
10.8
1.17
3.29
Including
87.0
0.5
16.15
22.50
Including
96.9
0.4
8.35
28.80
TRDD011
143.0
0.4
4.23
4.51
New Lode
TRDD011
144.4
0.3
0.99
2.92
New Lode
TRDD011
147.8
0.4
3.34
2.19
New Lode
TRDD011
177
0.5
2.89
4.82
New Lode
TRDD011
182
0.4
2.17
2.16
New Lode
TRDD012
91.5
1.0
0.86
2.01
Including
91.5
0.5
1.59
3.07
TRDD012
111.3
0.5
2.56
8.89
TRDD012
124.5
0.5
3.33
7.41
TRDD012
137.3
0.5
1.78
6.26
TRDD012
171.3
4.3
8.99
28.09
Including
171.3
1.2
30.93
86.78
Including
171.3
0.3
114.00
276.00
Including
174.0
0.6
2.18
22.20
TRDD012
179.5
3.1
7.98
30.62
Including
180.5
1.2
20.90
71.51
Including
180.5
0.5
45.90
157.00
Extension to MRE
Extension to MRE
3|Page
The drilling at Big Hans was focused on the southern extensions of the known mineralisation. Dart
started with a confirmation drill hole (TRDD011) before drilling towards the south (TRDD012) to
understand orientation at the southern end of the existing mineralisation. The concept that Dart was
testing with a south facing drill hole was to understand if there was a link between Big Hans and Super
Hans which would be analogous to New Constitution and South Constitution prospects. Between the
southern end of Big Hans and western end of Super Hans is a 200m gap with no drilling (see Figure
1). Dart intends to infill this gap zone to establish a representative geological interpretation from
diamond drilling. These adjacent parallel new lodes present further open cut targets and any increase
in the number of stacked lodes could have an improved economic impact on strip ratio in a mining
study scenario.
The intercept of 0.3m @ 114.00 g/t Au from 171.3m within TRDD012 is the highest single assay result
for drilling across any of the Triumph assays to date. The previous highest result was 1.0m @ 69.8 g/t
Au from 17.0m in TDH155 which was drilled in the Advance prospect.
The geological logging of the interval (TRDD012) highlights the strong presence of arsenopyrite,
pyrite, and some sphalerite and is vein dominated, which is typical of Triumph mineralisation.
Alteration, which can be seen in Figure 2, is characterised by strong sericitic to chloritic vein selvage
alteration with observations of silicification and albitisation of the host tonalite. Figure 2 also
highlights the sampling intervals of 4.4m @ 8.99 g/t Au and 28.09 g/t Ag from 171.3m with the sub
sample of 0.3m @ 114.00 g/t Au from 171.3m.
Figure 2: Core tray highlighting high-grade, thick sample interval of strong alteration and visual
mineralisation present - TRDD012.
More evidently in Figure 5, the long section highlights that the Big Hans deposit has limited
exploration below 100-150m depth. Dart’s drilling in this announcement supports a strong
exploration prospectivity for deeper, high-grade mineralisation associated with some of the key lodes
within each of the systems. Very limited drilling beyond 150m depth across all key deposits leaves
strong exploration prospectivity for Dart to unlock and discover.
4|Page
Figure 3: TRDD011 cross section showing new zones of mineralisation and assays > 0.1 g/t Au.
Figure 4: TRDD012 oblique cross section showing projected extension zone of mineralisation in green and
assays > 0.1 g/t Au.
5|Page
Figure 5: Long section through Big Hans lodes.
6|Page
NEXT STEPS
At the Triumph Gold Project, Dart intends to:
•
Drill test depth potential beneath the Southern Mineralised Corridor and chargeability
anomaly to the Northwest of New Constitution;
•
Continue Diamond drilling to expand the existing resources along strike and at depth;
•
In the next quarter complete and announce a high-quality Exploration Target for the Triumph
Gold Project based upon existing drilling in areas where this drilling does not yet have the
required density to proclaim a JORC Resource;
•
Undertake regional exploration, targeting the project area, as well as testing bulk tonnage
targets including those at depth;
•
Continue to review and identify additional prospective target zones for exploration in
addition to existing resource areas; and
Continue to review and identify further advanced projects throughout Central Queensland
for potential acquisition and joint venture.
•
Approved for release by the Board of Directors.
For more information contact:
Please see our Investor Hub for further information
James Chirnside
Managing Director
Dart Mining NL
jchirnside@dartmining.com.au
+61 419 605 842
Owen Greenberger
Head of Exploration / Investor Relations
Dart Mining NL
ogreenberger@dartmining.com.au
About Dart Mining
The Triumph Gold Project is Dart’s first step into an advanced intrusion related gold system project in
Queensland. Dart will look to develop a regional presence in Queensland through advanced stage intrusion
related and epithermal gold projects. Dart Mining will continue to evaluate several historic goldfields in
Central and Northeast Victoria including the Rushworth Goldfield and the new porphyry and lithium province
in Northeast Victoria identified by Dart. The area is prospective for precious, base, and strategic metals. Dart
Mining has built a strategic and highly prospective gold exploration portfolio in Central and Northeast regions
of Victoria, where historic surface and alluvial gold mining indicates the existence of potentially large gold
endowment.
7|Page
Competent Person’s Statement
The information in this report has been prepared, compiled, and verified by Mr. Owen Greenberger (B.Sc.
Geology), a Competent Person who is a Member of the Australian Institute of Geoscientists. Mr. Greenberger
is Head of Exploration for Dart Mining. Mr. Greenberger has sufficient experience that is relevant to the style
of mineralisation and type of deposits under consideration and to the activity being undertaken to qualify as
a competent person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves”. Mr. Greenberger takes responsibility for the exploration
results, and consents to the inclusion in the report of the matters based on his information in the form and
context in which it appears.
The information in this report that relates to Mineral Resources is based on information compiled and
reviewed by Mr Andrew Dawes, who is a Member of the Australasian Institute of Mining and Metallurgy and
a Member of the Australian Institute of Geoscientists. Mr Andrew Dawes is employed by AHD Resources and
consults to Dart Mining NL. Mr Andrew Dawes has sufficient experience that is relevant to the style of
mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a
Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Mineral Resources.
Mr Andrew Dawes consents to the inclusion in the report of the matters based on his information in the form
and context in which it appears.
Dart Mining confirms that it is not aware of any new information or data that materially affects the
information included in this, or referenced relevant market announcements and, in the case of estimates of
mineral resources or ore reserves, that all material assumptions and technical parameters underpinning the
estimates continue to apply and have not materially changed
Forward-Looking Statement
Certain statements contained in this document constitute forward-looking statements. Forward-looking
statements include, but are not limited to, Dart Mining’s current expectations, estimates and projections
about the industry in which Dart Mining operates, and beliefs and assumptions regarding Dart Mining’s future
performance. Such forward-looking statements are based on a number of estimates and assumptions made
by the Company and its consultants in light of experience, current conditions and expectations of future
developments which the Company believes are appropriate in the current circumstances. When used in this
document, words such as; “anticipate”, “could”, “intends”, “estimate”, “potential”, “plan”, “seeks”, “may”,
“should”, and similar expressions are forward-looking statements. Although Dart Mining believes that its
expectations presented in these forward-looking statements are reasonable, such statements are subject to
known and unknown risks, uncertainties and other factors, which may cause the actual results, achievements
and performance of the Company to be materially different from the future results and achievements
expressed or implied by such forward-looking statements. Investors are cautioned that forward-looking
information is no guarantee of future performance and accordingly, investors are cautioned not to place
undue reliance on these forward-looking statements.
8|Page
APPENDIX ONE
THE TRIUMPH GOLD PROJECT
The Triumph Gold Project (Triumph or Project) is located approximately 520km by road north of
Brisbane, Queensland, and is well serviced by the coastal port city of Gladstone 80km by road to the
north. The Project is comprised of two Exploration Permits: EPM 18486 and EPM 19343 covering an
area of 137.6 sq.km or 43 sub-blocks in total. The Company has recently applied for additional area
immediately adjacent east of the triumph project with EMP 29097.
Figure 6: Location of the Triumph Gold Project
Local Geology
The Triumph Gold Project is located in the Yarrol belt of the Wandilla Province (New England
Orogen), where late Permian to Middle Triassic leucocratic intrusives are scattered throughout
Devonian and Carboniferous sediments. Known mineralisation at Triumph is located within one of
these intrusive bodies, the Norton Tonalite.
The Norton Tonalite is dissected by numerous brittle faults and shears, as well as common minor
mafic intrusive dykes of dolerite to basaltic composition. There is a distinct magnetic low signature
at the core of the Norton Tonalite which is yet to be drill tested (ASX SHN: (ASX SHN: Robust Maiden
Resource at Triumph Gold Project (31 March 2022)).
9|Page
Structure
The Norton Tonalite is sinistrally offset by 1.8km by the northwest-trending Norton Fault, which can
be traced for over 28km. Initially thought to post date mineralisation, a single drill hole has
intersected the interpreted Norton Fault which returned 1m @ 2.9g/t Au and 1m @ 2.2g/t Au (ASX
MKB: Triumph Gold Project Update Amended (25 July 2014) indicating that the fault may have been
active during the main gold mineralisation event.
On a local scale the Norton Tonalite has two distinct fracture orientations that both host gold
mineralisation. One fracture set is approximately east-west striking and the other is northwestsoutheast striking. These fracture orientations are likely to have formed contemporaneously (ASX
SHN: Robust Maiden Resource at Triumph Gold Project (31 March 2022)).
Mineralisation
Gold and silver mineralisation is hosted in quartz-sulphide veins with pyrite and arsenopyrite
forming the bulk of the sulphide. Calcite is abundant in some lodes and present in most or all of
them. Veins typically show sericite-chlorite alteration halos although this appears to be more
associated with quartz veining rather than sulphides. Mineralisation at Triumph is interpreted as an
intrusion related gold system (IRGS) (ASX SHN: Robust Maiden Resource at Triumph Gold Project
(31 March 2022)).
Morrison (Intrusion-Related Gold Deposits in North Queensland, GSQ Project final meeting 7th December, 2017)
stated that there were over 130 known IRGS in Queensland with 17 of these having resources over
1 million ounces. Sunshine have stated that Triumph is analogous to the Ravenswood IRGS gold
deposit which has an endowment in excess of 5 million ounces of gold (ASX SHN: Follow Up Drilling
at Liontown (19 June 2024)).
Resource Highlights
The Project is located across the historic Norton Goldfield and has a current JORC (2012) Mineral
Resource Estimate prepared over five prospects in close proximity: Inferred gold resource of
150,091 oz made up of 2,16 million tonnes at a grade of 2.17g/t gold using a 1g/t cut-off has been
declared in 2025 (ASX: DTM Mar 2025).
More than 75% of the Triumph Inferred resource is within 100m of the surface and largely located
within 1.2km of strike within a 6km long structural corridor (ASX SHN: Follow Up Drilling at
Liontown (19 June 2024)). Dart considers that there is potential for proving up mineralisation below
current drilling and open pit depths that may result in underground mining options subject to
favourable economic studies.
10 | P a g e
APPENDIX TWO
JORC Code, 2012 Edition – Table 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Sampling
techniques
• Nature and quality of sampling (eg cut channels, random
chips, or specific specialised industry standard measurement
tools appropriate to the minerals under investigation, such as
down hole gamma sondes, or handheld XRF instruments,
etc). These examples should not be taken as limiting the
broad meaning of sampling.
• Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
• Aspects of the determination of mineralisation that are
Material to the Public Report.
• In cases where ‘industry standard’ work has been done this
would be relatively simple (eg ‘reverse circulation drilling was
used to obtain 1 m samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other cases more
explanation may be required, such as where there is coarse
gold that has inherent sampling problems. Unusual
commodities or mineralisation types (eg submarine nodules)
may warrant disclosure of detailed information.
• Drill type (eg core, reverse circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic, etc) and details (eg core
diameter, triple or standard tube, depth of diamond tails, facesampling bit or other type, whether core is oriented and if so,
by what method, etc).
• Method of recording and assessing core and chip sample
recoveries and results assessed.
• Measures taken to maximise sample recovery and ensure
representative nature of the samples.
• Whether a relationship exists between sample recovery and
grade and whether sample bias may have occurred due to
Drilling
techniques
Drill sample
recovery
Commentary
•
•
•
•
Sampling has been made on NQ diamond drilled core.
Sampling is whole core sampling based on the geologists sub sampling
(down to 30cm) logging definition.
As it is whole core, no sub-sampling techniques were used.
Samples are prepared with PREP-31B which includes crush to 70 %
passing 2mm, riffle split off 1kg, pulverise split to better than 85%
passing 75 microns.
•
Drilling is diamond drilling NQ core size and is triple tube drilling. Core
is oriented where possible using the Reflex ACT III tool.
•
Core is measured after each run and core recovery based on the drill
metres is recorded.
Once in the transition and fresh material, Triumph experiences limited
to no core loss with the exception of intensely broken zones where
recovery is still > 95%.
•
11 | P a g e
Criteria
JORC Code explanation
preferential loss/gain of fine/coarse material.
Logging
Subsampling
techniques
and sample
preparation
Quality of
assay data
and
laboratory
tests
• Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies and
metallurgical studies.
• Whether logging is qualitative or quantitative in nature. Core
(or costean, channel, etc) photography.
• The total length and percentage of the relevant intersections
logged.
• If core, whether cut or sawn and whether quarter, half or all
core taken.
• If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
• For all sample types, the nature, quality and appropriateness
of the sample preparation technique.
• Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
• Measures taken to ensure that the sampling is representative
of the in situ material collected, including for instance results
for field duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain size of the
material being sampled.
• The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is
considered partial or total.
• For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining the
analysis including instrument make and model, reading times,
calibrations factors applied and their derivation, etc.
• Nature of quality control procedures adopted (eg standards,
blanks, duplicates, external laboratory checks) and whether
acceptable levels of accuracy (ie lack of bias) and precision
have been established.
Commentary
•
•
•
•
•
•
•
•
•
•
No relationship has been observed between sample recovery and gold
grade.
The drill core has been geologically and geotechnically logged to a level
to support appropriate mineral resource estimation, mining studies and
metallurgical studies. Core is logged both qualitatively and
quantitatively. Core tray photography is both wet and dry photography.
All 2,475m have been logged so far. Sampling is discrete based on
observed mineralisation, alteration, key structural features.
Core is whole core sampling so no sub-sampling techniques in the field
are used which ensures appropriate in-situ representation.
The PREP-31B method includes crush to 70 % passing 2mm, riffle split
off 1kg, pulverise split to better than 85% passing 75 microns. The
larger 1kg riffle split is larger than the standard 250g to reduce sample
size bias.
Sampling size is suitable to represent the mineralisation intersected.
All samples were analysed at ALS Global (ALS, Brisbane).
All samples were assayed for Au using a 50g fire assay with AU-ICP22
determination as well as ME-MS61 for multi element. In the case
where key elements are over range, Ag, Pb, Zn, and Cu was completed
using OG-62. As completed with OG46, and Au completed with GRA22.
The three types of QAQC samples were used were Certified Reference
Material (CRM/Standards), Field Duplicates, and Blank material.
The Blanks consist of store-bought sand which has been shown to be
barren based on previous work. The Blanks are used to provide
information of any possible contamination or calibration issues during
the crush, pulverisation, and analytical phases. The field duplicates
utilised the spear to collect a second sample to test repeatability
(precision) of the original sample. The standards samples are used to
12 | P a g e
Criteria
JORC Code explanation
Commentary
•
•
•
Verification
of sampling
and
assaying
• The verification of significant intersections by either
independent or alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
• Discuss any adjustment to assay data.
•
•
•
•
Location of
data points
Data spacing
and
distribution
• Accuracy and quality of surveys used to locate drill holes
(collar and down-hole surveys), trenches, mine workings and
other locations used in Mineral Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
•
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
• Whether sample compositing has been applied.
•
•
•
•
test the accuracy of the analyses.
Three CRMs were OREAS standards and include: OREAS 277, OREAS
245, and OREAS 233.
QAQC samples were entered into the sample stream at a rate of 1 in
20.
Where lower detection limits were reported for assay results these
were replaced by half the lower detection limit for geological
interpretation and modelling purposes.
All core photos are reviewed by the Competent Person and also visited
site during early drilling.
No twinned holes have been undertaken.
Data from the field log sheets is entered into a digital database,
primarily an Excel spreadsheet with subsequent conversion into an SQL
database maintained by EarthSQL at the completion of the hole. The
Excel spreadsheet has been created with a series of validation criteria
in the form of pulldown menus for each data entry that restricts what
can be entered into each field and significantly reduces the error
associated with data entry.
Assay results are received from the laboratory in electronic (via email)
format onsite and sent to Sample Data importing to the EarthSQL
database. The electronic results are provided in an CSV file.
Collars are collected by Dart Geologists using a dGPS Trimble device
and is suitable for collecting collar XYZ.
All collar coordinates are in MGA94 Z56.
Downhole survey has been surveyed using Reflex survey tool.
AHD Resources was provided a 3D elevation topography or digital
terrain model (“DTM”) for the Triumph area from Dart Mining in the
form of a .msh file.
The drilling is in fill drilling of the existing Mineral Resource Estimate. As
such, the geological continuity is known and expected. Where new
lodes are intercepted, multiple drill holes confirm the new lodes along
strike. Given the close proximity to the existing MRE, the spacing is
sufficient to have confidence in the continuity.
13 | P a g e
Criteria
JORC Code explanation
Commentary
•
•
Orientation
of data in
relation to
geological
structure
• Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which this is
known, considering the deposit type.
• If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to have
introduced a sampling bias, this should be assessed and
reported if material.
Sample
security
• The measures taken to ensure sample security.
•
Audits or
reviews
• The results of any audits or reviews of sampling techniques
and data.
•
•
No sample compositing has been applied.
Drilling is typically orientated perpendicular to the interpreted strike of
mineralization where possible.
Darts objecting in drilling TRDD012 was the see if the structures
continue southward or to the east (towards Super Hans). Observations
of the structural logging highlight all south striking mineralised veins.
The drill hole is drilled approximately 35 degrees to the strike
orientation of the interpreted mineralisation but considering the
consistent sub perpendicular drilling due to topography constraints and
the discrete sampling by the field geologist, the impact of orientation
bias is limited.
Samples are under the care of Dart Geologists from logging through to
delivery to ALS in Brisbane.
No external reviews of audits on this drilling have been completed.
Drilling has been reviewed internally within Dart.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Mineral
tenement
and land
tenure status
• Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint
ventures, partnerships, overriding royalties, native title interests,
historical sites, wilderness or national park and environmental
settings.
• The security of the tenure held at the time of reporting along with any
known impediments to obtaining a licence to operate in the area.
Commentary
•
•
•
The Triumph project consists of EPM 18486 and EPM 19343,
both 100% owned by XXXX Gold Pty Ltd, a wholly owned
subsidiary of Sunshine Gold Limited. The tenements are in good
standing and no known impediments exist. Dart Mining NL has
completed the acquisition of these two tenements and the
process to transfer title is underway.
ML80035 (Norton Mine ML or Norton Mining Lease) (covering
an area of 0.2km) is located within the project area and is
excluded from the tenure.
Exploration is prohibited within a small area of Category B
environmentally protected area as well as a National Park
shown in Figure 2. The current approved Environmental
Authority (EA) allows for advanced exploration activities to
14 | P a g e
Criteria
Exploration
done by
other parties
JORC Code explanation
• Acknowledgment and appraisal of exploration by other parties.
Commentary
•
•
•
occur up to the National Park (NP) boundary.
The first record of modern exploration being undertaken in the
area was carried out by Delhi Australian Petroleum Limited
(Delhi) from 1966 to 1971. Initially Delhi undertook gridding,
mapping of the old workings, dump sampling and an IP survey.
The IP survey highlighted five anomalous zones in and around
the old Norton workings. Three of these zones, at the
Frampton, Bald Hill and Galena prospects, were drill tested with
fiv
Share your feedback
Discover