Dorchap Lithium Project Update
Released
Released
Announcement PDF
ASX Release
17th October 2023
Phase 1 Drill Program Summary – Dorchap Lithium
Project Update
Dart Mining NL (ASX:DTM) (“Dart Mining” or “the Company”) is pleased to announce that all results from the
Phase 1 scout diamond drilling program at the Dorchap Range Lithium project are now available. This update
summarises an initial review of the drilling completed under Phase 1 of the Sociedad Química y Minera de
Chile S.A (NYSE:SQM) $12 million SQM earn-in agreement with Dart Mining.
Dorchap Range LCT Pegmatite Phase 1 Highlights
•
•
•
•
Core logging indicates Spodumene and Petalite are the dominant lithium mineral phases
Downhole assay highlight results included:
o MIDDH001 – Eagle Dyke
▪ 34.67m @ 0.11% Li2O from 65.7m (Dart Mining ASX June 2023)
o MIDDH002 – Eagle Dyke
▪ 16.75m @ 0.21% Li2O from 103.98m (Dart Mining ASX June 2023)
Including 0.81m @ 1.20% Li2O from 111.45m
o MIDDH004 – Fergusson’s Dyke
▪ 5.9m @ 0.81% Li2O from 204m
Including 3.3m @ 1.00% Li2O from 204.67m
o MIDDH005 – Fergusson’s Dyke
▪ 3.01m @ 0.26% Li2O from 78.49m (Dart Mining ASX June 2023)
Including 0.62m @ 1.63% Li2O from 80.43m
o MIDDH009 – Boones Dyke (Dart Mining ASX September 2023)
▪ 10.0m @ 1.08% Li2O from 313m
Including 7.0m @ 1.38% Li2O from 315m
o MIDDH010 Boones Dyke (Dart Mining ASX September 2023)
▪ 2.0m @ 1.07% Li2O from 302m
Including 1.0m @ 1.38% Li2O from 303m
Dart Mining has granted SQM, the right, to sole fund exploration expenditure totalling A$12million.
During the first earn in period, SQM may earn an initial 30% interest in the Dorchap Lithium Project by
sole funding exploration expenditure of A$3million
Chairman, James Chirnside commented: “The Phase 1 drill program has confirmed the lithium fertility of highly
fractionated pegmatites that occur within an area of some 160 km2. The imminent Phase 2 and permitting of
Phase 3 drilling is eagerly awaited as drilling focus moves to high priority targets within the Gosport dyke
Group.”
Dart Mining NL
ABN: 84 119 904 880
Level 6, 412 Collins Street
Melbourne VIC 3000
Contact: James Chirnside
Email: jchirnside@dartmining.com.au
Mobile: +61 447 447 613
Webpage: www.dartmining.com.au
LinkedIn: Dart Mining NL
Twitter: @DartMining
Page | 1
Discussion of Phase 1 Drilling Results
Phase 1 diamond drilling has been very successful in proving the lithium fertility of the roadside accessible dyke
targets tested to date and more broadly of the selected Dorchap Dyke Swarm fractionation target area, hosting
hundreds of prospective dykes. Extensive mapping and rock chip geochemistry combined with the new drilling
data has now provided geological context around width, grade, mineral chemistry and continuity variations
within the pegmatites. This program is the first diamond drilling undertaken along the Dorchap Lithium Project,
with interpretation beginning to consolidate into a robust geological model. This allows more predictive
targeting and a better understanding of the key controls to emplacement and grade distribution to be applied.
The current interpretation of the geological evolution and structural emplacement of the Dorchap Dyke Swarm
pegmatites involves variable syn-emplacement to post-emplacement shearing of the dykes (extensive at the
Eagle Dyke) that has generated mylonitic (sheared) textures that likely caused partial recrystallisation within
some pegmatite bodies and re-mobilised a portion of the contained lithium from the dyke into the surrounding
sediments as an exomorphic halo. Broadly, higher drill grade appears to correlate with larger primary
pegmatite crystal size (preserved megacrystic texture). This important textural characteristic appears
indicative of undeformed or weakly deformed portions of the pegmatites tested to date. The deformation and
hydrothermal alteration noted in portions of the pegmatites may be responsible for the broader, but overall
lower grade lithium intersections at Eagle dyke (34.67m @ 0.11% Li2O – Table 1) and similar recrystalised
intersections, in contrast, the dominant megacrystic pegmatite intersected at Boones (MIDDH009 and
MIDDH010) show higher grades (Table 1) with up to 10m @ 1.08% Li2O (Dart Mining ASX September 2023).
As previously observed, (Dart Mining ASX September 2023) an understanding of the structural evolution of the
region is critical to exploration success due to the controls on the emplacement, alteration and preservation
of primary lithium grades in the Dorchap pegmatite dykes. Building upon this structural model is a key focus
of the planned follow-up phases of diamond drilling under the SQM earn-in agreement. For reference, previous
updates have covered results of holes MIDDH001, MIDDH002 and MIDDH005 (Dart Mining ASX June 2023) and
MIDDH009 and MIDDH010 (Dart Mining ASX September 2023). A total of five separate pegmatite dykes have
been tested by a total of 12 diamond drill holes for a total of 3032m in Phase 1. A summary of the key results
of the full program are presented in Table 1 and discussed below with assay highlights from previously
announced and new data (MIDDH003, MIDDH004, MIDDH007, MIDDH008, MCDDH001 and MCDDH002)
tabulated. Drill hole location and orientation data are presented in Appendix 1 and tenement details appear
in Appendix 2.
Peak lithium assays from drill holes across the Phase 1 scout diamond drill program are geologically compelling
and have ensured continued support for ongoing lithium exploration under the SQM earn-in agreement. To
continue developing targets while permitting access for drilling the Gosport Group proceeds, investigations and
field-work has commenced with the aim of building a second low-impact diamond drilling program for
completion during the summer field period. The Gosport Group has already been outlined during mapping and
rock chip sampling as a highly prospective zone with multiple, closely spaced spodumene bearing lithium
mineralised dykes within a 2km x 1km area (Dart Mining ASX April 2017). Multiple closely spaced mineralised
dykes have the potential to be aggregated to build tonnage within the group, an important economic factor in
any future development. Planning for the Phase 3 diamond drill program has also advanced to the permitting
stage, approvals will provide new track access and drilling positions into the key targets of the central Gosport
Group (Figure 1).
Page | 2
Recent assay results from the remaining holes in the Phase 1 program cover the Eagle dyke (MIDDH003),
Fergusson’s dyke (MIDDH004), Blairs dyke (MIDDH006, MIDDH007 & MIDDH008) and the Rodda Creek dyke
(MCDDH001 & MCDDH002).
Hole MIDDH003 was drilled at the northern extent of the Eagle Dyke outcrop (Figure 1) at a high angle to the
northwest strike orientation, some 160m northwest of holes MIDDH001 and MIDDH002 (Table 1). Hole
MIDDH003 did not intersect any significant lithium mineralisation with only a narrow fine to granitic pegmatite
intersected between 229.2 to 232.09m (Figure 2). The Eagle dyke appears to narrow down dip and is
structurally complex, splitting into multiple dyke structures to the north.
Hole MIDDH004 was drilled below the eastern extent of the Fergusson’s dyke outcrop (Figure 1) at a high angle
to the northwest strike. The hole intersected 5.9m @ 0.81% Li2O from 204.0m, including 3.3m @ 1.00% Li2O
from 204.67m (Table 1 – Figure 3). This intersection consists of fine to medium crystalline pegmatite with
patchy megacrystic zones, indicating variable recrystalisation is present. Fergusson’s dyke appears to remain
steeply southwest dipping from surface and increases in width and lithium grade with depth from hole
MIDDH005 to MIDDH004.
Page | 3
Figure 1 - Dorchap Lithium Project – drill hole locations and named pegmatite targets in the Phase 1 Drill program.
Page | 4
Figure 2 – Composite oblique Cross-section of drilling completed across Eagle Dyke. Holes MIEDRC001-003 previously
reported (Dart Mining ASX June 2019). MIDDH001 – 002 previously reported (Dart Mining ASX June 2023).
Page | 5
Figure 3 – Oblique cross-section across Fergusson’s Dyke - MIDDH004 and MIDDH005 (Dart Mining ASX June 2023)
Holes MIDDH006, MIDDH007 and MIDDH008 tested Blairs dyke (Figure 1) with MIDDH006 intersecting 6.47m
@ 0.16% Li2O from 77.15m (Figure 4 – Table 1) across a sheared, recrystalised pegmatite dyke with significant
intermingled sediment and associated exomorphic halo. Blairs dyke appears to be moderately to steeply
southwest dipping with a northwest strike. Drill holes intersected the dykes strike at a high angle with
MIDDH008 drilling sub-parallel to the dip of the dyke. MIDDH006 intersected the dyke at a high angle to its
dip with an estimated true width zone of mixed dyke and sheared sediments over 6.47m (Table 1 – Figure 4).
Holes MIDDH007 and MIDDH008 were both drilled as scissor holes back toward MIDDH006 to confirm the
dip of the dyke. MIDDH007 passed below the interpreted down dip extent of the dyke (Figure 5) and
MIDDH008 passed through mixed sheared pegmatite and sediment (Figure 6) from 64.5 to 83.6m over a true
width of approximately 4m with no significant lithium results.
Page | 6
Figure 4 – Oblique cross-section across Blairs Dyke - MIDDH006 showing drill intersection and pegmatite interpretation.
Figure 5 – Oblique cross-section across Blairs Dyke - MIDDH007 showing pegmatite interpretation.
Page | 7
Figure 6 – Oblique cross-section across Blairs Dyke - MIDDH008 showing pegmatite interpretation.
Previously reported (Dart Mining ASX September 2023) holes MIDDH009 and MIDDH010 tested Boones dyke
(Figure 1) on two sections approximately 140m apart along strike.
MIDDH009 intersected 10m @ 1.08% Li2O (Table 1 – Figure 7) from 313m (including 7m @ 1.38% Li2O) from the
western dyke structure at Boones. The Boones dyke appears to dip steeply to the west and shows geological
continuity extends below 200m depth from surface. The true width of the pegmatite based on surface mapping
and the current drill interpretation is between 5 – 13m with an open strike extent of some 300m at surface. The
drill intersection assay highlight is approximately 5m in true width with the drill hole orientation approximately
perpendicular to the strike of the pegmatite.
MIDDH010 intersected 2m @ 1.07% Li2O (Table 1 – Figure 8) from 302m from the western dyke, some 90m
along strike from the western dyke intersection in MIDDH009 (Figure 7 and 8). Geological continuity extends
below 175m depth from surface with the true width of the pegmatite drill intersection being approximately 5m.
The drill intersection orientation is approximately perpendicular to the strike of the dyke with the assay highlight
having a true width of approximately 1.1m.
Page | 8
Figure 7 – Oblique cross-section interpretation of drill hole MIDDH009 with assay highlights from Boones Dyke.
Page | 9
Figure 8 – Oblique cross-section interpretation of drill hole MIDDH010 with assay highlights from Boones Dyke.
Hole MCDDH001 and MCDDH002 tested the Rodda Creek dyke within EL006486 (Figure 1). The drilling is oriented at a
high angle to the northwest strike of the dyke. MCDDH001 intersected a narrow dyke between 137.68 and 140.46m with
an assay highlight of 0.72m @ 0.49% Li 2O from 138.82m consisting of strongly recrystalised pegmatite with relict
megacrystic texture and minor cassiterite inclusions (Table 1 - Figure 9). The pegmatite in MCDDH001 is interpreted to
have a true width of 2.3m. MCDDH002 intersected a narrow pegmatite between 145.0 to 146.11m with no significant
lithium mineralisation. The pegmatite is intensely sheared and recrystalised showing minor scattered eucryptite and
cassiterite grains with a true width of 0.9m. The Rhoda Creek dyke is interpreted to dip steeply southwest and appears to
narrow down dip, becoming intensely sheared and recrystalised (Figure 10).
Page | 10
Figure 9 – Oblique cross-section interpretation of drill hole MCDDH001 with assay highlights from the Rodda Creek Dyke.
Page | 11
Figure 10 – Oblique cross-section interpretation of drill hole MCDDH002 from the Rodda Creek Dyke.
Page | 12
Table 1 – Notable lithium mineralised intervals – Phase 1 Program
Drill Hole
MIDDH001
MIDDH002
From (m)
65.7
103.98
Including: 111.45
To (m)
Interval (m)
100.37
120.73
112.26
34.67
16.75
0.81
Li2O (%)
0.11
0.21
1.20
MIDDH003
MIDDH004
204.00
Including: 204.67
209.90
208.00
5.90
3.3
0.81
1.00
MIDDH005
78.49
Including: 80.43
81.5
81.05
3.01
0.62
0.26
1.63
MIDDH006
MIDDH007
MIDDH008
77.15
83.62
6.47
0.16
MIDDH009
313
Including: 315
323
322
10
7
1.08
1.38
MIDDH010
Including:
MCDDH001
MCDDH002
302
303
304
304
2
1
1.07
1.38
138.82
139.54
0.72
0.49
Notes
Pegmatite & exomorphic halo
Coarse pegmatite
No Significant Intersection
Fine pegmatite with patchy
megacrystic texture
Megacrystic to recrystalised
pegmatite
Exomorphic halo and sheared
pegmatite
No Significant Intersection
No Significant Intersection
Megacrystic to recrystalised
pegmatite
Megacrystic to recrystalised
pegmatite
Recrystalised pegmatite with
relict megacrystic texture
No Significant Intersection
Dorchap Lithium Project Summary
Dart Mining geologists first identified the lithium prospectivity of pegmatite dykes in the Dorchap Range in 2016
and set about acquiring exploration leases across the region (Dart Mining ASX May 2016; Dart Mining ASX
August 2016). These are the first recorded lithium pegmatites identified in Victoria, and are believed to have
been sourced from the nearby Mount Wills Granite. A regional sampling program consisting of 826 samples has
identified a strong fractionation trend across the Dorchap Range, resolving a 20 km ×12 km zone of strongly
fractionated pegmatites bearing enriched Li, Cs, Ta, Be and Sn mineralisation (Dart Mining ASX July 2021).
Dart Mining’s chip sampling program has yielded rewarding results, including: 16m at >530 ppm Cs2O, 0.32%
Li2O and 104 ppm Ta2O5, and grab samples at 1.57% Li2O and 0.1% Ta2O5 at the Bluejacket Dyke in Glen Wills,
along with 10m at 0.95% Li2O from the Eagle Dyke and 10m at 1.38% Li2O from the Holloway Dyke (Dorchap
Range), and 10m at 1.22% Li2O from Scrubby Dyke, 1m at 838 ppm Cs2O and 0.46% SnO2, and a grab sample at
9.98% SnO2 from elsewhere in the Dorchap Range (Dart Mining ASX July 2021). The initial short drilling program
in 2019 has been followed by an airborne LiDAR mapping program in early 2021 (Dart Mining ASX March 2021),
which has allowed additional, detailed mapping of pegmatite dykes that were previously overlooked in pockets
of dense bush across the Dorchap Range.
––– END –––
Page | 13
For more information contact:
James Chirnside
Managing Director
Dart Mining NL
jchirnside@dartmining.com.au
+61 447 447 613
Peter Taylor
Investor Relations
NWR Communications
peter@nwrcommunications.com.au
+61 412 036 231
About Dart Mining
Dart Mining (ASX: DTM) has the aim of evaluating and developing several historic goldfields, as well as
substantiating a new porphyry province in Northeast Victoria. The area is prospective for precious, base, and
strategic metals. These include Lithium, Gold, Silver, Copper, Molybdenum, Zinc, Tungsten, Tin, Tantalum, and
a host of other important minerals. Dart Mining has built a strategically placed gold exploration footprint in
the Central and Northeast regions of Victoria, where historic surface and alluvial gold mining indicates the
existence of potentially significant gold endowment.
Additional JORC Information
Further details relating and information relating to Dart Mining’s Strategic and Technology metals
exploration programs can be found in Dart Mining’s ASX announcements:
13th September 2023: “Excellent Lithium Drill Results”
22nd June 2023: “First Assay Results from Phase 1 Drilling”
6th October 2021: “Lithium Drilling Update”
27th October 2021: “LiDAR Points Towards Increase in Lithium Pegmatites”
21st July 2021: “Strategic & Technology Metals”
18th March 2021: “LiDAR Data Acquisition over Strategic Projects”
10th February 2021: “Exploration Strategy & Tenement Status Update”
19th June 2019: “Lithium Project Update”
19th March 2019: “Lithium Exploration Drilling to Commence at the Dorchap Project”
14th November 2018: “Lithium Exploration Update”
10th September 2018: “Exploration Update: Dorchap Lithium Project”
10th May 2018: “Significant Lithium Mineralisation in Pegmatites of the Dorchap Range, Victoria”
21st December 2017: “Lithium Exploration Update”
6th October 2017: “Lithium Tenements & Prospects”
3rd April 2017: “Lithium Exploration Update”
3rd April 2017: “Exploration Program Confirms Significant Lithium Pegmatites in NE Victoria”
6th February 2017: “Acquisition of Tenement Package”
9th August 2016: “Company Update: Lithium”
1st June 2016: “Exploration Tenement Update”
18th May 2016: “Tenement Application Update”
Page | 14
Additional information on Dart Mining’s other recent and current exploration activities can be found in:
26th May 2022: “Granite Flat Drilling Completion”
15th February 2022: “Granite Flat Cu-Au Diamond Drilling Update”
11th October 2021: “Granite Flat Diamond Drilling Update”
29th September 2021: “Multiple Drill Targets Identified at Granite Flat”
14th September 2021: “Encouraging Copper-Gold Drill Results from Granite Flat”
27th May 2021: “Initiation of Geophysical Surveys at Granite Flat”
11th May 2021: “Diamond Drilling Program for Copper-Gold Mineralisation Commences”
18th March 2021: “LiDAR Acquisition over Strategic Projects”
8th March 2021: “Granite Flat High-Grade Gold, Silver, Copper Drill Results”
27th October 2020: “Orogenic Gold and Porphyry Prospectivity, Mitta Mitta, NE Victoria”
22nd September 2021: “Mt Elmo Goldfield Mineralisation”
6th April 2021: “Strong Gold Mineralisation Intercepted at Rushworth”
16th February 2021: “Sandy Creek Significant Gold Mineralisation”
19th October 2020: “Drill Results Reveal High-Grade Gold”
Competent Person’s Statement
The information in this report that relates to Exploration Results has been compiled by Mr Owen Greenberger
who is the full-time Head of Exploration for Dart Mining, and verified by Mr Dean Turnbull, a Competent
Person who is a Member of the Australian Institute of Geoscientists. Mr Turnbull is a consultant and Nonexecutive Director of Dart Mining. Mr Turnbull has sufficient experience that is relevant to the style of
mineralisation and type of deposits under consideration and to the activity being undertaken to qualify as a
competent person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves”. Mr Turnbull consents to the inclusion in the report of the
matters based on his information in the form and context in which it appears.
Forward-Looking Statement
Certain statements contained in this document constitute forward-looking statements. Forward-looking
statements include, but are not limited to, Dart Mining’s current expectations, estimates and projections
about the industry in which Dart Mining operates, and beliefs and assumptions regarding Dart Mining’s future
performance. Such forward-looking statements are based on a number of estimates and assumptions made
by the Company and its consultants in light of experience, current conditions and expectations of future
developments which the Company believes are appropriate in the current circumstances. When used in this
document, words such as; “anticipate”, “could”, “intends”, “estimate”, “potential”, “plan”, “seeks”, “may”,
“should”, and similar expressions are forward-looking statements. Although Dart Mining believes that its
expectations presented in these forward-looking statements are reasonable, such statements are subject to
known and unknown risks, uncertainties and other factors, which may cause the actual results, achievements
and performance of the Company to be materially different from the future results and achievements
expressed or implied by such forward-looking statements. Investors are cautioned that forward-looking
information is no guarantee of future performance and accordingly, investors are cautioned not to place
undue reliance on these forward-looking statements.
Page | 15
APPENDIX 1
Drill hole location and orientation details.
Drill Hole
MIDDH001
MIDDH002
MIDDH003
MIDDH004
MIDDH005
MIDDH006
MIDDH007
MIDDH008
MIDDH009
MIDDH010
MCDDH001
MCDDH002
Dyke /
Target
Eagle
Eagle
Eagle
Fergussons
Fergussons
Blairs
Blairs
Blairs
Boones
Boones
Rodda
Rodda
Easting
(MGA Z55)
524,012.9
523,982.5
523,882.1
524,531.2
524,578.1
526,079.9
526,112.4
526,109.4
524,656.5
524,586.2
529,426.5
529,426.9
Northing
RL
(MGA Z55)
(m)
5,949,105.9 1,159.2
5,949,096.3 1,163.0
5,949,207.0 1,105.0
5,950,327.3
979.0
5,950,374.3
970.4
5,954,138.9
816.7
5,954,232.9
805.3
5,954,206.0
811.2
5,957,946.9
951.8
5,958,069.3
961.2
5,949,661.0
561.5
5,949,660.8
561.4
Azimuth
(Grid)
31.5
28.5
46.3
74.8
16.8
55.6
204.1
183.4
249.5
234.8
14.5
59.8
Dip
-55.0
-54.9
-54.5
-54.8
-54.7
-55.0
-54.3
-70.3
-54.6
-54.9
-55.2
-54.9
Total
Depth
(m)
250
336.8
294.6
252.8
152.4
169.9
125.3
130.1
396.6
360.7
314.9
266.5
Page | 16
APPENDIX 2
TENEMENT STATUS
All tenement applications continue to pass through the approvals process with the tenements remaining
in good standing as of the 29th of September 2023 (Table 1.1 – Figure 1.1).
Table 1.1. TENEMENT STATUS
MIN006619
Mt View 2
Mining License
Area (km2)
Unless
specified
224 Ha
EL5315
Mitta Mitta4&5
Exploration Licence
148
100%
NE Victoria
EL006016
Rushworth4
Exploration Licence
32
100%
Central Victoria
EL006277
Empress5
Exploration Licence
87
100%
NE Victoria
EL006300
Eskdale3&5
Exploration Licence
96
100%
NE Victoria
EL006486
Mt Creek5
Exploration Licence
116
100%
NE Victoria
EL006764
Cravensville
Exploration Licence
170
100%
NE Victoria
EL006861
Buckland
Exploration Licence
414
100%
NE Victoria
EL007007
Union
Exploration Licence
3
100%
Central Victoria
EL006994
Wangara
Exploration Licence
190
100%
Central Victoria
EL007008
Buckland West
Exploration Licence
344
100%
NE Victoria
EL007099
Sandy Creek5
Exploration Licence
437
100%
NE Victoria
EL006865
Dart
Exploration Licence)
567
100%
NE Victoria
EL006866
Cudgewa
Exploration Licence
508
100%
NE Victoria
EL007170
Berringama
Exploration Licence
27
100%
NE Victoria
EL007430
Buchan
EL (Application)
546
100%
Gippsland
EL007435
Goonerah
EL (Application)
587
100%
Gippsland
EL008161
Colbinannin
100%
Central Victoria
EL007425
Deddick
Exploration Licence
341
100%
Gippsland
EL007428
Boebuck
Exploration Licence
355
100%
NE Victoria
EL007426
Walwa
Exploration Licence
499
100%
NE Victoria
EL007754
Tallandoon5
Exploration Licence
88
100%
NE Victoria
RL006615
Fairley’s2
Retention License
340 Ha
100%
NE Victoria
RL006616
Unicorn1&2
Retention License
23,243 Ha
100%
NE Victoria
EL9476
Woomargama
Exploration Licence
85
100%
New South Wales
EL9516
Brewarrina
Exploration Licence
185
100%
New South Wales
Tenement Number
Name
Tenement Type
EL (Application)
Interest
Location
100%
NE Victoria
All tenements remain in good standing as of 29 September 2023.
NOTE 1: Unicorn Project area subject to a 2% NSR Royalty Agreement with Osisko Gold Royalties Ltd dated 29 April
2013.
NOTE 2: Areas subject to a 1.5% Founders NSR Royalty Agreement.
NOTE 3: Areas are subject to a 1.0% NSR Royalty Agreement with Minvest Corporation Pty Ltd (See DTM ASX Release 1
June 2016).
NOTE 4: Areas are subject to a 0.75% Net Smelter Royalty on gold production, payable to Bruce William McLennan.
NOTE 5: Tenements subject to conditions noted in the SQM earn-in agreement (Dart Mining ASX December 2022 SQM
Earn-In)
17 | P a g e
Figure 1.1: Location of Dart Mining’s exploration properties in Northeastern and Central Victoria.
18 | P a g e
APPENDIX 3
JORC CODE, 2012 EDITION – TABLE 1
SECTION 1 SAMPLING TECHNIQUES AND DATA
Criteria
JORC Code Explanation
Sampling techniques
•
•
•
•
Nature and quality of sampling (e.g. cut channels, random chips, or
specific specialised industry standard measurement tools appropriate to
the minerals under investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc.). These examples should not be taken as
limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample representivity and
the appropriate calibration of any measurement tools or systems used.
Aspects of the determination of mineralisation that are Material to the
Public Report.
In cases where ‘industry standard’ work has been done this would be
relatively simple (e.g. ‘reverse circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to produce a 30 g charge for
fire assay’). In other cases more explanation may be required, such as
where there is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g. submarine nodules)
may warrant disclosure of detailed information.
Commentary
•
•
•
•
•
•
•
•
•
•
•
HQ diamond drill core was drilled using triple tube method to retain maximum
sample recovery.
Diamond core was sampled as half core at 1m intervals or to geological or
mineralogical boundaries, where relevant, to a minimum sample size of 0.2m and
a maximum of 1.5m. To ensure representative sampling, half core samples were
always taken from the same side of the core.
Only pegmatite dykes and contact zones are sampled due to the target
mineralisation.
In interpreted unmineralized zones, samples were not submitted for analysis.
Samples submitted to ALS were whole sample crushed to 70% <2mm, riffle/rotary
split off 1 kg, pulverise to >85% passing 75 microns, then assayed by ALS methods
ME-MS61 (0.25g sample aliquot by four-acid digest and ICP-MS and ICP-AES
analysis), ME-ICP89 and ME-MS91.
Certified Reference Materials OREAS 750, OREAS 751, OREAS 752, OREAS 753, and
OREAS 999 as well as CRM blank OREAS C27c were inserted every 10 samples as
part of a QA/QC system.
All-drill related data are referenced to the original ASX report by date published. All
details appear in the original report.
Chip samples are taken continuously perpendicular to the general strike of
mineralised structures in outcrop, and large samples (4 – 7kg) are taken where
possible to provide a more representative sample. The chip samples are of
adequate quality to be indicative of the area sampled.
Grab samples were collected from the outcrop over a small area (<1 – 5m in
diameter). The grab samples are generally small (ie. <7kg) and represent the local
area only, sampling only tests a small aerial extent, and are not considered as
being representative of the outcrop. The grab samples are of adequate quality to
be representative of the small area sampled and approximate the sampled in situ
mineralisation.
Rock samples are dried, crushed and whole sample pulverized and riffle split. A
sample aliquot (25g) is taken for analysis. Lithium has been analysed by ALS
Method ME-MS61– a four acid digest assay technique for total digestion.
Individual <7kg chip / grab samples were collected from outcrop, individual chips
making up the sample were <40mm and chipped from a random selection of the
19 | P a g e
Drilling techniques
•
Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air
blast, auger, Bangka, sonic, etc.) and details (e.g. core diameter, triple or
standard tube, depth of diamond tails, face-sampling bit or other type,
whether core is oriented and if so, by what method, etc.).
Drill sample recovery
•
Method of recording and assessing core and chip sample recoveries and
results assessed.
Measures taken to maximise sample recovery and ensure representative
nature of the samples.
Whether a relationship exists between sample recovery and grade and
whether sample bias may have occurred due to preferential loss/gain of
fine/coarse material.
•
•
Logging
•
Whether core and chip samples have been geologically and
mineralisation to generate a representative average sample of the mineralisation
targeted.
• Semi-quantitative XRD results we analysed from the same sample pulp analysed for
multi-element geochemistry.
• X-ray diffraction traces were obtained from the samples with a Panalytical Aeris
Research Powder Diffractometer. Operating conditions were 40kV/15mA, Fe Kß
filter, step scan 0.01/29 secs˚2Ɵ at, 1/4˚ divergence and a 1.0˚ ant-scatter slit. Scan
range was 5° to 90° 2Ɵ. Phases were identified by computer search/match of the
COD and ICDD 2022 Databases. Quantitative results have been determined with full
pattern Rietveld refinement software.
• 12 diamond holes drilled by DDH1 Ltd across the mineralised structures.
• 3 RC drillholes were drilled by EDrill Pty Ltd limited over two mineralised dyke
structures.
• Diamond Drilling (Core) is of HQ3 (63.5mm diameter) from surface. Drill holes are
angled, and core is orientated (Reflex Tool) to allow structural interpretation (not
yet completed)
• Face sampling 5.25” hammer Reverse Circulation drilling
• Holes surveyed using an Trushot downhole camera, both open hole and within
rods (for dip). Verified using clinometer and compass survey of rods.
• Face sampling 5 ¾’ RC drilling
• Each 2m composite sample was weighed and results recorded to monitor sample
recovery – a high average recovery was achieved in all holes.
• Experienced geologists ensured best drilling and sampling practices were
maintained.
• Experienced drillers ensured best drilling and sampling practices were maintained,
including pausing drilling between sample intervals to ensure all sample is out of
the system and regular cleaning of the sampling equipment.
• There was no observable relationship between sample recovery and grade.
•
Drill core recovery is recorded for each drill interval recorded by the drill
contractor. The drilled interval (recorded on core blocks) and the recovered
interval (measured during logging) are recorded in the company drill log database
and recovery is calculated
Share your feedback
Discover