RUSHWORTH GROWLERS HILL DRILLING RESULTS
Dart Mining NL (ASX:DTM) (“Dart Mining” or “the Company”) has completed Phase 1 drilling at
the Growlers Hill Prospect within the companies 100% owned Rushworth Gold tenement package.
All drillhole logging, sampling, results and interpretation are provided in this progress update.
The intersections from the Growlers Hill drilling to date clearly indicate multiple mineralised
structures exist within the strong North-South Growlers Hill fault channel, further drilling is
planned to target high grade gold shoots within these structures.
HIGHLIGHTS INCLUDE:
•
•
•
•
•
868m of drilling completed which has confirmed interpreted structural architecture of the
Growlers Hill Fault.
Final results have been received for all holes, with highlight results including:
o GHDD001 – 2.5m @ 0.63g/t Au from 104.5m inc. 0.5m @ 1.9g/t Au
o GHDD002 – 3.0m @ 0.42g/t Au from 57m inc. 0.5m @ 1.5g/t Au
o GHDD003 – 4.0m @ 0.44g/t Au from 116.7m inc. 0.35m @ 0.99g/t Au
o GHDD008 – 2.45m @ 0.43g/t Au from 113.5m
Gold intersections appeared on both the interpreted Growlers Hill Fault as mined on
surface and a deeper secondary structure as shown in Figures 1 – 5 below.
Interpretation indicates that several structures are present at depth below the surface
workings in a wide zone of structural deformation focused around larger, sub vertical
North-South orientated structures with smaller shallow dipping structures interlinking.
Phase 2 drilling has commenced with 472m of a planned 1,620m completed at Star of the
West, Henry Horne (formally known as Star of the West West) and Shellback Reef shown in
Figure 6.
Chairman, James Chirnside commented:
“Dart have commenced the first systematic, field wide drill evaluation at Rushworth aimed at better
understanding the structural controls on the high-grade gold shoots formerly mined on the
goldfield. This will help us to refine our mineralisation models for these orogenic gold deposits and
better target future drilling which is ongoing. Our target is structurally hosted high-grade zones
similar to the Fosterville mine, 45km away, however Rushworth has its own characteristics and we
are building our understanding of these with the ongoing drilling.”
1|Page
Drilling at Growlers Hill has confirmed the position at depth of gold bearing structures mined from
surface at Growlers Hill. Drilling intersected multiple sub-vertical North-South orientated
structures with low angle North dipping structures linking between them. Drill core and assays
demonstrate a strong mineralised fault structure below and adjacent to the known historic
workings providing ample encouragement for follow-up testing.
DRILLING RESULTS DISCUSSION
Drill testing of the Growlers Hill Reef aimed to test the structural controls on mineralisation
historically mined at surface, and at depth to ~100m from the Growlers Reef Shaft.
Drilling at Growlers Hill has confirmed the overall structural architecture and position at depth of
the structures exploited at surface. Drilling intersected multiple sub-vertical (~80 degrees to the
West) North-South orientated structures with shallow North dipping structures linking between
the major structures.
Lithology intersected was classic Central Victorian turbidite facies rocks, with interbedded
sandstone and shales exhibiting clear younging indicators of graded beds, and flame structures.
Younging direction and bedding to cleavage relationships show the lithology intersected is as
expected, with east-west orientated, south dipping bedding indicating the drilling intersected the
Growlers Hill faults as they break across the southern limb of an anticline. Drilling showed evidence
that more carbon rich shales exist within the stratigraphy at Rushworth, an important addition to
destabilise the mineralising fluid and promote deposition of Gold. Bedding parallel veins were
observed, with several small bedding parallel laminated quartz veins also present, providing
additional future targeting options as they approach the anticline fold closure.
The Southern Drillholes (GHDD003 & GHDD004 shown in Figure 2, GHDD007 & GHDD008 shown
in Figure 3) intersected a shallow mineralised structure before intersecting the main interpreted
Growlers Hill Structure at depth. The main structure has a significant impact on the local
weathering of rocks indicating a significant impact on the local fluid movement, however, this
structure was only weakly mineralised over a narrow width. GHDD003 intersected a footwall
structure below the Growlers Hill Fault which exhibited some width of disseminated sulphide
mineralisation. GHDD007 did not intersect the structures after encountering drilling difficulties and
being abandoned before target depth.
The Northern Drillholes (GHDD001 and GHDD002 shown in Figures 1, 4 & 5) intersected
mineralised structures in both the hangingwall and footwall of the main Growlers Hill Structure, as
well as the narrow low-grade intersection of the main Growlers Hill Structure. GHDD001 (Figure 4)
intersected 2.5m @ 0.6g/t Au at 104.5m from a very wide zone of broken ground and low density
stockwork veining from approximately 89m down hole to 120m depth. GHDD002 Figure
5intersected 3m @ 0.4g/t Au at 55m (Figure 5) from a series of veins cross cutting bedding, with
apparent sulphide pitting in slightly weathered sandstone, with the interpreted Growlers Fault
further downhole at 89m depth. Both zones from GHDD001 & GHDD002 show a significant amount
of alteration, with iron staining, chlorite and sericite surrounding most veins.
2|Page
Drilling has highlighted that the Growlers Hill Reef mined historically is likely a combination of
several structures, with historic mining likely exploiting dilatational zones where the major
structures intersected or bifurcated. Evidence for this can be seen in the en echelon shape of the
surface workings, evident in Lidar images, just to the north of the planned holes GHDD005 and
GHDD006 shown in Figure 1.
Results to date indicate that the wider Growlers Hill region is exhibiting encouraging widths and
grades of gold mineralisation across several structures that warrants follow up drilling. The
company has been waiting on the results before committing to drilling planned holes GHDD005 &
GHDD006 in the centre of the Growlers Hill region. With the encouraging results received from the
wider Growlers region indicating potential for multiple mineralised structures in close proximity,
the company intends to continue to explore the prospect for the ideal structural setting, starting
with GHDD005 & GHDD006 down plunge of the en echelon shaped zone identified in the surface
workings.
RUSHWORTH PHASE 2 DRILLING
Phase 2 drilling is progressing well with 472m drilled across the Star of the West, Henry Horne and
Shellback prospects, from a planned 1,630m.
Drilling targeted a North-South orientated structure to the western boundary of the Star of the
West prospect. 3 short drillholes were drilled along strike from the surface workings, however very
limited structure was identified in the drilling.
Drilling continued further West to the Henry Horne prospect (formally reported as Star of the West
West). Drilling progressed well before intersecting an interpreted large-scale East-West structure
where water return was lost which limited drilling progress and resulted in the abandonment of
the planned drilling through the structure. The planned drilling will be reassessed with alternate
hole designs or drilling method to be considered before recommencement. The nature and scale
of the structure is encouraging.
Drilling of the Shellback target to the eastern end of the Star of the West prospect is targeting an
east west orientated thrust fault and has intersected several bedding parallel structures with
linking tensional veins intersected parallel to the drillhole along 2m to 3m of core. The bedding
parallel structures appear to have a significant impact on the weathering profile of the surrounding
rocks, with the dominantly fresh rocks surrounding the structure exhibiting significant weathering
attributes. Core is being processed for submission to the laboratory.
3|Page
RUSHWORTH STRUCTURAL ARCHITECTURE
The Rushworth goldfield is focused along a series of regional East-West orientated anticline folds
which host shallow historic gold workings along a cumulative strike length of approximately 14km
(Figure 2). The major limbs of the anticline also exhibit smaller scale parasitic folding and various
changes in bedding strike and dip. Significant North-South orientated structures crosscut and
offset East-West bedding and fold hinges along the length of the field.
The East-West orientation of the field is unusual for Victorian Goldfields, which usually trend
North-South, due to the added structural complexity of the Rushworth Region being highly
influenced by the Lachlan Orocline formation and induced North-South crustal shortening through
subduction rollback.
Mineralisation historically exploited at Rushworth concentrated on Alluvial mining before focus
shifted to the hard rock source. Mineralisation is dominated by free gold located in quartz veins
hosted within sandstone and shale lithologies.
Mineralisation at Rushworth is comprised of three main structural architecture types.
1. Thrust hosted Quartz Veins. Formed during compressional events where folding has
accommodated as much crustal shortening as it can, thrust faulting then takes over,
utilising planer weakness usually associated with bedding and accommodates further
shortening. Structures progress along limbs of folds and when a hinge zone is intersected,
the fault structures break across the opposite fold limb introducing dilatational areas and
structural complexity of discordant bedding to promote the deposition of gold from the
mineralised fluid. This style of mineralisation is common across central Victoria particularly
at Fosterville, Bendigo and Ballarat fields.
2. North South Veins. Significant mineralised fault structures crosscut the East-West bedding
and thrust hosted quartz veins in a North-South orientation across the Rushworth
Goldfield. During the folding and rollback event of the Lachlan Orocline formation, NorthSouth structures would have formed to accommodate the rotation of the upper crust in the
region.
3. Saddle Reefs. Some historic workings reported exploiting “Bendigo Style” saddle Reefs
where soft shale units deform in a more ductile fashion than the surrounding sandstone
units and produce dilatational saddles in the hinge of the fold. This style of deformation
and mineralisation is particularly evident and reported in historic texts in the Nuggetty Reef
region.
Areas of significant interest for Dart Mining in the Rushworth Goldfield are areas of structural
intersections, i.e. where the Thrust Faults which strike parallel to bedding intersect the large-scale
North-South Structures. The intersection of major structures provides an increase in structural
complexity and opportunity for the further deposition of gold from mineralised fluids. The
intersection can also increase levels of mineralisation through introducing more mineralising
events.
4|Page
Figure 1: Growlers Hill Drilling Plan
5|Page
Figure 2: Cross Section 1 looking North showing drillholes GHDD003 and GHDD004
6|Page
Figure 3: Cross section 2 looking North showing drillholes GHDD007 and GHDD008
7|Page
Figure 4: Cross section 3 looking North showing drillhole GHDD001
8|Page
Figure 5: Cross section 4 looking North showing drillhole GHDD002
9|Page
Figure 6: Phase 2 drilling progress, tenement boundary outline in green under application to amalgamate into surrounding EL006016.
10 | P a g e
Figure 7: Rushworth Tenement location plan
11 | P a g e
Figure 8: Dart Tenement location plan
12 | P a g e
Approved for release by the Board of Directors.
For more information contact:
James Chirnside
Managing Director
Dart Mining NL
jchirnside@dartmining.com.au
+61 447 447 613
Aimee Coates
Investor Relations
Dart Mining NL
acoates@dartmining.com.au
About Dart Mining
Dart Mining (ASX: DTM) has the aim of evaluating and developing several historic goldfields, as well as
substantiating a new porphyry province in Northeast Victoria. The area is prospective for precious, base,
and strategic metals. These include Lithium, Gold, Silver, Copper, Molybdenum, Zinc, Tungsten, Tin,
Tantalum, and a host of other important minerals. Dart Mining has built a strategically placed gold
exploration footprint in the Central and Northeast regions of Victoria, where historic surface and alluvial
gold mining indicates the existence of potentially significant gold endowment.
Competent Person’s Statement
The information in this report has been prepared, compiled, and verified by Mr. Owen Greenberger (B.Sc.
Geology), a Competent Person who is a Member of the Australian Institute of Geoscientists. Mr.
Greenberger is Head of Exploration for Dart Mining. Mr. Greenberger has sufficient experience that is
relevant to the style of mineralisation and type of deposits under consideration and to the activity being
undertaken to qualify as a competent person as defined in the 2012 Edition of the “Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr. Greenberger consents to the
inclusion in the report of the matters based on his information in the form and context in which it appears.
Forward-Looking Statement
Certain statements contained in this document constitute forward-looking statements. Forward-looking
statements include, but are not limited to, Dart Mining’s current expectations, estimates and projections
about the industry in which Dart Mining operates, and beliefs and assumptions regarding Dart Mining’s
future performance. Such forward-looking statements are based on a number of estimates and
assumptions made by the Company and its consultants in light of experience, current conditions and
expectations of future developments which the Company believes are appropriate in the current
circumstances. When used in this document, words such as; “anticipate”, “could”, “intends”, “estimate”,
“potential”, “plan”, “seeks”, “may”, “should”, and similar expressions are forward-looking statements.
Although Dart Mining believes that its expectations presented in these forward-looking statements are
reasonable, such statements are subject to known and unknown risks, uncertainties and other factors,
which may cause the actual results, achievements and performance of the Company to be materially
different from the future results and achievements expressed or implied by such forward-looking
statements. Investors are cautioned that forward-looking information is no guarantee of future
performance and accordingly, investors are cautioned not to place undue reliance on these forwardlooking statements.
Additional JORC Information
Further details relating and information relating to Dart Mining’s Strategic and Technology metals
exploration programs can be found in Dart Mining’s ASX announcements available on the Company’s
Website.
13 | P a g e
APPENDIX 1
TENEMENT STATUS
All tenement applications continue to pass through the approvals process with the tenements
remaining in good standing as of the 1st June 2024 (Table 1 – Figure 7 & Figure 8).
Table 1. TENEMENT STATUS
Name
Tenement Type
EL5315
Mitta Mitta4&5
Exploration Licence
Area (km2)
Unless
specified
148
EL006016
Rushworth4
Exploration Licence
EL006277
Empress5
EL006300
Eskdale3&5
EL006486
Tenement
Number
Interest
Location
100%
NE Victoria
32
100%
Central Victoria
Exploration Licence
87
100%
NE Victoria
Exploration Licence
96
100%
NE Victoria
Mt Creek5
Exploration Licence
116
100%
NE Victoria
EL006764
Cravensville
Exploration Licence
170
100%
NE Victoria
EL006861
Buckland
Exploration Licence
414
100%
NE Victoria
EL007007
Union
Exploration Licence
3
100%
Central Victoria
EL006994
Wangara
Exploration Licence
190
100%
Central Victoria
EL007008
Buckland West
Exploration Licence
344
100%
NE Victoria
EL007099
Sandy Creek5
Exploration Licence
437
100%
NE Victoria
EL006865
Dart
Exploration Licence)
567
100%
NE Victoria
EL006866
Cudgewa
Exploration Licence
508
100%
NE Victoria
EL007170
Berringama
Exploration Licence
27
100%
NE Victoria
EL007430
Buchan
EL (Application)
546
100%
Gippsland
EL007435
Goonerah
EL (Application)
587
100%
Gippsland
EL008161
Colbinannin
EL (Application)
458
100%
Central Victoria
EL007425
Deddick
Exploration Licence
341
100%
Gippsland
EL007428
Boebuck
Exploration Licence
355
100%
NE Victoria
EL007426
Walwa
Exploration Licence
499
100%
NE Victoria
EL007754
Tallandoon5
Exploration Licence
88
100%
NE Victoria
RL006615
Fairley’s2
Retention License
340 Ha
100%
NE Victoria
RL006616
Unicorn1&2
Retention License
23,243 Ha
100%
NE Victoria
EL9476
Woomargama
Exploration Licence
85
100%
New South Wales
EL9516
Brewarrina
Exploration Licence
185
100%
New South Wales
All tenements remain in good standing as of 1 June 2024.
NOTE 1: Unicorn Project area subject to a 2% NSR Royalty Agreement with Osisko Gold Royalties Ltd dated 29
April 2013.
NOTE 2: Areas subject to a 1.5% Founders NSR Royalty Agreement.
NOTE 3: Areas are subject to a 1.0% NSR Royalty Agreement with Minvest Corporation Pty Ltd (See DTM ASX
Release 1 June 2016).
NOTE 4: Areas are subject to a 0.75% Net Smelter Royalty on gold production, payable to Bruce William
McLennan.
NOTE 5: Tenements subject to conditions noted in the SQM earn-in agreement (Dart Mining ASX December 2022
SQM Earn-In)
14 | P a g e
APPENDIX 2
Table 1: Growlers Hill Collar Information
Hole ID
Inclination
Azimuth
(Magnetic)
Achieved Hole
Depth (m)
Surveyed
Easting
Surveyed
Northing
Surveyed
Elevation_m
(RL)
-65.1
-70.4
-74.9
-82
-69.2
-79.8
58.3
91.1
59.3
56
35.8
31.8
152.7
102.5
139.7
137.7
73.3
179.2
321995.8
321996.9
322005.2
322004.7
322004.6
322004.1
5948699.2
5948697.9
5948595.8
5948595.8
5948596.9
5948596.2
196.3
195.2
187.4
186.1
185.9
186.5
GHDD001
GHDD002
GHDD003
GHDD004
GHDD007
GHDD008
Table 2: Growlers Hill Drilling Significant Intercepts
Hole ID
From
(m)
To
(m)
GHDD001
GHDD001
GHDD001
inc.
GHDD001
GHDD002
inc.
GHDD002
GHDD002
GHDD002
GHDD003
inc.
GHDD004
GHDD004
GHDD008
GHDD008
17.95
69.5
104.5
106.5
113.5
55.5
57
71.43
85.5
89
116.7
119.25
33
119.35
27.45
113.55
18.5
70
107
107
114
58.5
57.5
71.62
86.5
89.5
120.67
119.6
33.5
119.7
28.16
116
Length
(m)
Grade
(Au ppm)
0.55
0.5
2.5
0.5
0.5
3
0.5
0.19
1
0.5
3.97
0.35
0.5
0.35
0.71
2.45
0.24
0.73
0.63
1.92
0.95
0.42
1.53
0.27
0.32
0.27
0.44
0.99
1.11
0.32
0.3
0.43
15 | P a g e
APPENDIX 3
JORC CODE, 2012 EDITION – TABLE 1
SECTION 1 SAMPLING TECHNIQUES AND DATA
Criteria
JORC Code Explanation
Sampling techniques
•
•
•
•
Drilling techniques
•
Drill sample recovery
•
•
•
Logging
•
•
Nature and quality of sampling (e.g. cut channels, random chips, or
specific specialised industry standard measurement tools appropriate to
the minerals under investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc.). These examples should not be taken as
limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample representivity and
the appropriate calibration of any measurement tools or systems used.
Aspects of the determination of mineralisation that are Material to the
Public Report.
In cases where ‘industry standard’ work has been done this would be
relatively simple (e.g. ‘reverse circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to produce a 30 g charge for
fire assay’). In other cases more explanation may be required, such as
where there is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g. submarine nodules)
may warrant disclosure of detailed information.
Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air
blast, auger, Bangka, sonic, etc.) and details (e.g. core diameter, triple or
standard tube, depth of diamond tails, face-sampling bit or other type,
whether core is oriented and if so, by what method, etc.).
Method of recording and assessing core and chip sample recoveries and
results assessed.
Measures taken to maximise sample recovery and ensure representative
nature of the samples.
Whether a relationship exists between sample recovery and grade and
whether sample bias may have occurred due to preferential loss/gain of
fine/coarse material.
Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate Mineral
Resource estimation, mining studies and metallurgical studies.
Whether logging is qualitative or quantitative in nature. Core (or
Commentary
•
Diamond drilling was utilised to obtain NQ2 sized drill core which was logged in
detail at the Dart Core farm in Wodonga
• Zones of expected mineralisation, and zones showing visual prospectivity during
logging were split into a minimum 0.15m to maximum 0.5m sample intervals
• In interpreted unmineralized samples were not submitted for analysis.
• Sample intervals were whole core sampled
• Samples were submitted to Onsite Laboratories in Bendigo for Photon Assay
analysis
o Samples were crushed and pulverised to 90% passing 75 microns
o Samples wer rotary split into approximate 300gm sub samples
o Samples were passed through the Photon Assay machine for final
gold analysis.
• Certified Reference Materials OREAS 233, OREAS 235, OREAS 237, OREAS 277, and
OREAS 279 as well as CRM blank OREAS 22h were inserted a nominal 20 samples as
part of a QA/QC system.
• Whole core sampling, and the large subsample size of the Photon Assay technique
were utilised to combat the expected nuggerty nature of mineralisation at the
Rushworth Project.
• Diamond Drilling (Core) is of NQ2 (50.6mm diameter) from surface. Drill holes are
angled, and core is orientated (Reflex Tool) to allow structural interpretation
• Holes surveyed using an Trushot downhole camera, with 3m multishot survey
completed at the End of Hole
•
Drill core recovery is recorded for each drill interval recorded by the driller. The
drilled interval (recorded on core blocks) and the recovered interval (measured
during logging) are recorded in the company drill log database and recovery is
calculated as a percentage.
•
•
Drill core initial summary lithology logging is carried out to allow subsequent hole
planning and to track hole geology against hole plan.
Detailed geological logging of all drill core includes recording of recovery,
weathering, lithology, alteration, mineralization and RQD.
16 | P a g e
Sub-sampling
techniques and sample
preparation
•
•
•
•
•
•
•
Quality of assay data
and laboratory tests
•
•
•
Verification of
sampling and assaying
•
•
•
•
costean, channel, etc.) photography.
The total length and percentage of the relevant intersections logged.
If core, whether cut or sawn and whether quarter, half or all core taken.
If non-core, whether riffled, tube sampled, rotary split, etc. and whether
sampled wet or dry.
For all sample types, the nature, quality and appropriateness of the
sample preparation technique.
Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
Measures taken to ensure that the sampling is representative of the in
situ material collected, including for instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of the material
being sampled.
The nature, quality and appropriateness of the assaying and laboratory
procedures used and whether the technique is considered partial or
total.
For geophysical tools, spectrometers, handheld XRF instruments, etc.,
the parameters used in determining the analysis including instrument
make and model, reading times, calibrations factors applied and their
derivation, etc.
Nature of quality control procedures adopted (e.g. standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels of
accuracy (i.e. lack of bias) and precision have been established.
•
•
•
All drill core is photographed prior to sampling. This logging is qualitative.
100% of the drilling was logged.
•
Samples were submitted to ALS Chemex and analysed for a suite of trace elements
using ALS Methods ME-ICP89 and ME-MS91 (a peroxide leach is considered a total
extraction technique for lithium). These techniques are appropriate and
considered a total extraction technique for key metals Rb, Nb, Sn, Nb, Ta, Cs and Li.
Samples were whole sample crushed, pulverised to P85 at 75um and assayed by
ALS methods ME-ICP89 and ME-MS91.
ALS conducted their own internal laboratory checks.
Laboratory blanks, standards are reviewed per batch to monitor accuracy and
precision.
•
•
•
•
The verification of significant intersections by either independent or •
alternative company personnel.
•
The use of twinned holes.
Documentation of primary data, data entry procedures, data verification,
data storage (physical and electronic) protocols.
•
Discuss any adjustment to assay data.
•
•
•
•
Location of data points
•
•
Accuracy and quality of surveys used to locate drill holes (collar and down- •
hole surveys), trenches, mine workings and other locations used in Mineral
Resource estimation.
•
Specification of the grid system used.
Geological logging is completed by experienced geologists
The laboratory supplies all assay data as an export to a CSV file. The raw data is
edited to separate all duplicates and CRM results into a QA/QC tab in the CSV file
and reviewed.
Verification of significant intersections were made by alternative company
personnel.
No independent review of assay data has been carried out.
Geological data is logged quality controlled spreadsheet and checked.
Electronic-only assay data is imported into a database from the laboratory’s
electronic data.
No holes were twinned at this early exploration stage.
The location of drill hole collars were confirmed with a Trimble DA2 receiver and
Catalyst 0.3m Subscription set to MGA94 Grid Datum (Zone 55)
Accuracy is variable but is expected to be 0.3m
17 | P a g e
•
Quality and adequacy of topographic control.
•
•
•
Sample security
•
•
Data spacing for reporting of Exploration Results.
•
Whether the data spacing and distribution is sufficient to establish the
degree of geological and grade continuity appropriate for the Mineral •
Resource and Ore Reserve estimation procedure(s) and classifications
applied.
Whether sample compositing has been applied.
Whether the orientation of sampling achieves unbiased sampling of possible •
structures and the extent to which this is known, considering the deposit
type.
If the relationship between the drilling orientation and the orientation of key •
mineralised structures is considered to have introduced a sampling bias, this
should be assessed and reported if material.
The measures taken to ensure sample security.
•
Audits or reviews
•
The results of any audits or reviews of sampling techniques and data.
Data spacing and
distribution
Orientation of data in
relation to geological
structure
•
•
•
•
•
•
•
During the mapping and Collar pickup process with constant visual quality
assessment conducted, the receiver maintained an accuracy level <0.4m.
Elevation
Down hole, multi-shot surveys were taken at 15m then a nominal 30 m interval
where possible using a Trueshot survey tool. A 3m multi-shot survey was
conducted at end of hole.
Drill sites were restricted to existing tracks. It was not intended to establish a drill
spacing for resource estimation although these holes can be used at a later date.
Drill core sampling minimum 0.15m and maximum 0.5m with sampling to
lithological and mineralogical boundaries and is considered appropriate for the
style of mineralisation.
Drilling was restricted to existing tracks and pads. However, in all cases it was
possible to drill at a high angle to the host structures and achieve a suitable
orientation that crosscuts the expected mineralised orientation.
Drill transects were oriented perpendicular across the known trend of major
structures.
All samples submitted for analysis are placed in sealed poly-weave bags and
delivered to the laboratory by Dart Staff
An internal review of procedures, operations, sampling techniques and analytical
techniques was made by Dart Mining.
No external review of sampling or results has been undertaken at this early stage
of exploration.
18 | P a g e
SECTION 2 REPORTING OF EXPLORATION RESULTS
Criteria
Mineral tenement
and land tenure
status
JORC Code Explanation
Commentary
•
Type, reference name/number, location and ownership including agreements
or material issues with third parties such as joint ventures, partnerships,
overriding royalties, native title interests, historical sites, wilderness or
national park and environmental settings.
The security of the tenure held at the time of reporting along with any known
impediments to obtaining a licence to operate in the area.
•
•
All tenements remain in good standing as of 1st June 2024
Details of Dart Mining tenements shown in Appendix 2 and Figure 7 and Figure 8
Acknowledgment and appraisal of exploration by other parties.
•
Gold was discovered in Rushworth in August 1853, and for several years
production was from alluvial workings. This developed into reef workings by 1860.
Mining had almost completely ceased by 1914 and attempts to revitalise the
goldfield since have been met with no success.
Garratt (1985) calculated at least 97,000 oz of gold was produced from the
Rushworth Goldfield, with a further 40,000 oz from the Whroo Goldfield 6km to
the south of Rushworth. These figures are considered an absolute minimum for
production due to poor record keeping prior to the 1860’s and the numbe