Triumph Drilling Continues to Widen New Constitution
Released
Released
Announcement PDF
Dart Mining NL
ABN: 84 119 904 880
Level 6, 412 Collins Street
Melbourne VIC 3000
Contact: James Chirnside
Email: jchirnside@dartmining.com.au
Mobile: +61 447 447 613
Webpage: www.dartmining.com.au
LinkedIn: Dart Mining NL
Twitter: @DartMining
1 | P a g e
ASX Release
20th November 2025
TRIUMPH DRILLING CONTINUES TO WIDEN NEW CONSTITUTION CORRIDOR
Dart Mining NL (“Dart” or the “Company”) is pleased to announce a drilling update on the Triumph
Gold Project in Central Queensland. Dart completed the last of the ‘deep drilling’ drill holes prior to
mobilising to the Coonambula antimony-gold project. This update includes assay results for
TRDD014 and continues to highlight that the New Constitution orebody is wider than previously
thought and should improve any future economic assessments. Triumph has an existing Inferred
Mineral Resource of 2.16 Mt @ 2.17g/t Au for 150,000oz gold (ASX: DTM 4 Mar 2025). Dart recently
announced a high-integrity Exploration Target for the Triumph Project of 5.1 - 7.6 Mt @ 1.72 - 2.52
g/t Au for 285,100-613,200oz gold, with a base case of 6.9Mt @ 2.29 g/t Au for 506,800oz gold
(ASX: DTM 11 Nov 2025).
HIGHLIGHTS
• Dart has completed a total 2,761m (17 holes) of diamond core drilling across New Constitution,
South Constitution, and Big Hans;
• Assays have been received for the last of the trial deep drill holes, TRDD014 (through New
Constitution), with results for all outstanding Triumph drilling now completed;
• Highlight significant assays include:
• TRDD014: 2.1m @ 3.02 g/t Au + 52.03g/t Ag from 33.5m;
▪ Including 0.5m @ 8.54 g/t Au + 41.50 g/t Ag from 34.5m;
• TRDD014: 1.4m @ 9.31 g/t Au + 39.70 g/t Ag from 56.0m
▪ Including 0.5m @ 28.20 g/t Au + 121.00 g/t Ag from 56.4m;
• TRDD014: 2.4m @ 2.28 g/t Au + 8.33 g/t Ag from 116.1m;
▪ Including 0.3m @ 7.64 g/t Au and 44.40 g/t Ag from 118.2m; and
• TRDD014: 2.6m @ 4.34 g/t Au + 13.46 g/t Ag from 233.0m
▪ Including 0.5m @ 24.60 g/t Au + 74.00 g/t Ag from 233.7m.
▪
With the completion of the trial deep drilling, Dart is pleased with the discovery of the parallel lodes.
The deeper drilling proved that mineralisation extends at depth around New Constitution. Further,
TRDD014 also provided insight into broad mineralised zones with the continuous drilling over longer
distances which has not been completed across the key prospects before. Results show a 110m
widening of the gold system to the east of previously known mineralised zones.
2 | P a g e
Darts Chairman, James Chirnside, commented: “The parallel lodes discovered during this phase of
deep drilling, as well as the open nature of mineralisation at depth is very pleasing. The extension of
broad mineralisation zones is also very encouraging. These new mineralised zones remain open to
the east, and at depth, which gives us an abundance of new target areas for drill testing going
forward. This phase of deep drilling around the New Constitution prospect has confirmed, along with
the other deep holes, that higher grades of mineralisation exist deeper in the system. These results
are typical of Triumph mineralisation, with discrete high-grade gold and silver intercepts that
demonstrate a substantial increase in the width of the mineralised system being intersected.”
A summary of the drill hole significant assay results for TRDD014 is shown in Table 1. Significant
intercepts that are interpreted to be new lodes are also highlighted in Table 1. These new lodes
present additional targets for Dart to consider in future exploration to expand the Mineral Resource
Estimate around the existing known mineralisation. These adjacent parallel new lodes present
further open cut targets and any increase in the number of stacked lodes could have an improved
economic impact on strip ratio in a mining study scenario. Specifically, with TRDD014, the
mineralisation intercepted to the east at depth represents ~110m widening of the New
Constitution system to the east.
Table 1: Summary of significant intercepts of drilling results for TRDD014 plus notable new lode intercepts.
Drill Hole Name From Depth (m) Thickness (m) Au g/t Ag g/t Notes
TRDD014 33.5 2.1 3.02 52.03
including 34.5 0.5 8.54 41.50
TRDD014 56.0 1.4 9.31 39.70
including 56.4 0.5 28.20 121.00
TRDD014 81.5 1.1 0.92 4.23
TRDD014 85.5 2.5 0.4 3.61
including 87.5 0.5 1.01 6.75
TRDD014 90.8 1.2 0.61 3.64 New Lode
TRDD014 116.1 2.4 2.28 8.33 New Lode
including 118.2 0.3 7.64 44.40
TRDD014 154.4 0.4 1.31 7.61 New Lode
TRDD014 166.3 0.6 2.14 3.87 New Lode
TRDD014 171.7 1.0 2.01 6.71 New Lode
TRDD014 182.9 0.6 1.35 7.98 New Lode
TRDD014 189.6 0.3 2.38 10.10 New Lode
TRDD014 233.0 2.6 4.34 13.46 New Lode
including 233.7 0.5 24.60 74.00
TRDD014 292.0 1.4 1.09 7.54 New Lode
including 292.0 0.5 2.36 15.15
The Dart drilling to date for the New Constitution prospect is shown in Figure 1. A cross section of
the TRDD014 assay results is shown in Figure 2.
3 | P a g e
Figure 1: Location of reported drill hole assays compared to the existing Mineral Resource Estimate.
4 | P a g e
Figure 2: Cross section highlighting assay results > 0.1 g/t Au and new lode interpretations compared to the
existing Mineral Resource Estimate.
Gold mineralisation is hosted within quartz-sulphide veins and is associated with pyrite and
arsenopyrite, with gold and silver likely contained within the pyrite, with the pyrrhotite likely an
associated but not host sulphide. The veins typically show a sericite (+/-chlorite) alteration halo,
however this appears to be more associated with the quartz veining itself rather than sulphides.
Observations of the gold-silver-copper-lead-zinc-arsenic mineralisation within sulphidic zones is
hosted in composite intrusions classified as Tonalite. These intrusives exhibit at least two phases of
alteration, which may represent at least two different distinct phases or a spatial association and
fractionation between the phases. Alteration within and peripheral to mineralised sulphidic veins
occurs as spatially and temporally associated strong to intense phyllic (sericite/muscovite ± pyrite-
silica) alteration with predominantly narrow vein selvages. Pockets of weak to strong potassic
(biotite-K feldspar) alteration associated with weak copper mineralisation are observed.
EXPANSION FOCUS – NORTH AND SOUTH CORRIDOR
Existing drill intercept highlights are shown on Figure 3 for the Southern Mineralised Corridor
including the Super Hans, Big Hans, New Constitution and South Constitution resource blocks.
Existing drill intercept highlights are shown on Figure 4 for the Northern Mineralised Corridor
including the Bald Hill resource block and historic Advance mine area. Both areas highlight strong
geophysical extensions which are shown in the background of Figure 3 and Figure 4 by the
chargeability (ASX: MBK Nov 2016, MBK Jan 2017) as well as historical and current drilling intercepting
high grade material. These areas will be a focus for Mineral Resource growth as Dart works through
the numerous targets at Triumph with historical and current drilling intercepting high grade
material.
5 | P a g e
Figure 3 – Existing drill intercept highlights for the Southern Mineralised Corridor including (east to west)
the Super Hans, Big Hans, New Constitution and South Constitution resource blocks with chargeability
(geophysics) maps as the background.
Figure 4 - Existing drill intercept highlights the Northern Mineralised Corridor including the Bald Hill
resource block, Bald Hill East and historic Advance mine area with chargeability (geophysics) maps as the
background.
6 | P a g e
NEXT STEPS
At the Triumph Gold Project, Dart intends to:
• Review pre-existing geophysics data to identify additional exploration targets;
• Drill test depth potential beneath the Southern Mineralised Corridor and chargeability
anomaly to the Northwest of New Constitution;
• Continue Diamond drilling to expand the existing resources along strike and at depth;
• Undertake regional exploration, targeting the project area, as well as testing bulk tonnage
targets including those at depth;
• Continue to review and identify additional prospective target zones for exploration in
addition to existing resource areas; and
• Continue to review and identify further advanced projects throughout Central Queensland
for potential acquisition and joint venture.
Approved for release by the Board of Directors.
For more information contact:
Please see our Investor Hub for further information
James Chirnside
Managing Director
Dart Mining NL
jchirnside@dartmining.com.au
+61 419 605 842
Owen Greenberger
Head of Exploration / Investor Relations
Dart Mining NL
ogreenberger@dartmining.com.au
7 | P a g e
About Dart Mining
The Triumph Gold Project is Dart’s first step into an advanced intrusion related gold system project in
Queensland. Dart will look to develop a regional presence in Queensland through advanced stage intrusion
related and epithermal gold projects. Dart is farming into the Coonambula Antimony-Gold Project in Central
Queensland. Dart Mining will refocus our Victorian exploration to Central Victoria around our highly
prospective Rushworth Goldfield tenements.
Competent Person’s Statement
The information in this report has been prepared, compiled, and verified by Mr Andrew Dawes, who is a
Member of the Australasian Institute of Mining and Metallurgy and a Member of the Australian Institute of
Geoscientists. Mr Andrew Dawes is employed by AHD Resources and consults to Dart Mining NL. Mr Dawes
has sufficient experience that is relevant to the style of mineralisation and type of deposits under
consideration and to the activity being undertaken to qualify as a competent person as defined in the 2012
Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”.
Mr. Dawes takes responsibility for the exploration results, and consents to the inclusion in the report of the
matters based on his information in the form and context in which it appears.
Dart Mining confirms that it is not aware of any new information or data that materially affects the
information included in this, or referenced relevant market announcements and, in the case of estimates of
mineral resources or ore reserves, that all material assumptions and technical parameters underpinning the
estimates continue to apply and have not materially changed
Forward-Looking Statement
Certain statements contained in this document constitute forward-looking statements. Forward-looking
statements include, but are not limited to, Dart Mining’s current expectations, estimates and projections
about the industry in which Dart Mining operates, and beliefs and assumptions regarding Dart Mining’s future
performance. Such forward-looking statements are based on a number of estimates and assumptions made
by the Company and its consultants in light of experience, current conditions and expectations of future
developments which the Company believes are appropriate in the current circumstances. When used in this
document, words such as; “anticipate”, “could”, “intends”, “estimate”, “potential”, “plan”, “seeks”, “may”,
“should”, and similar expressions are forward-looking statements. Although Dart Mining believes that its
expectations presented in these forward-looking statements are reasonable, such statements are subject to
known and unknown risks, uncertainties and other factors, which may cause the actual results, achievements
and performance of the Company to be materially different from the future results and achievements
expressed or implied by such forward-looking statements. Investors are cautioned that forward-looking
information is no guarantee of future performance and accordingly, investors are cautioned not to place
undue reliance on these forward-looking statements.
8 | P a g e
APPENDIX ONE
THE TRIUMPH GOLD PROJECT
The Triumph Gold Project (Triumph or Project) is located approximately 520km by road north of
Brisbane, Queensland, and is well serviced by the coastal port city of Gladstone 80km by road to the
north. The Project is comprised of two Exploration Permits: EPM 18486 and EPM 19343 covering an
area of 137.6 sq.km or 43 sub-blocks in total. The Company has recently applied for additional area
immediately adjacent east of the triumph project with EMP 29097.
Figure 5: Location of the Triumph Gold Project
Local Geology
The Triumph Gold Project is located in the Yarrol belt of the Wandilla Province (New England
Orogen), where late Permian to Middle Triassic leucocratic intrusives are scattered throughout
Devonian and Carboniferous sediments. Known mineralisation at Triumph is located within one of
these intrusive bodies, the Norton Tonalite.
The Norton Tonalite is dissected by numerous brittle faults and shears, as well as common minor
mafic intrusive dykes of dolerite to basaltic composition. There is a distinct magnetic low signature
at the core of the Norton Tonalite which is yet to be drill tested (ASX SHN: (ASX SHN: Robust Maiden
Resource at Triumph Gold Project (31 March 2022)).
9 | P a g e
Structure
The Norton Tonalite is sinistrally offset by 1.8km by the northwest-trending Norton Fault, which can
be traced for over 28km. Initially thought to post date mineralisation, a single drill hole has
intersected the interpreted Norton Fault which returned 1m @ 2.9g/t Au and 1m @ 2.2g/t Au (ASX
MKB: Triumph Gold Project Update Amended (25 July 2014) indicating that the fault may have been
active during the main gold mineralisation event.
On a local scale the Norton Tonalite has two distinct fracture orientations that both host gold
mineralisation. One fracture set is approximately east-west striking and the other is northwest-
southeast striking. These fracture orientations are likely to have formed contemporaneously (ASX
SHN: Robust Maiden Resource at Triumph Gold Project (31 March 2022)).
Mineralisation
Gold and silver mineralisation is hosted in quartz-sulphide veins with pyrite and arsenopyrite
forming the bulk of the sulphide. Calcite is abundant in some lodes and present in most or all of
them. Veins typically show sericite-chlorite alteration halos although this appears to be more
associated with quartz veining rather than sulphides. Mineralisation at Triumph is interpreted as an
intrusion related gold system (IRGS) (ASX SHN: Robust Maiden Resource at Triumph Gold Project
(31 March 2022)).
Morrison (Intrusion-Related Gold Deposits in North Queensland, GSQ Project final meeting 7th
December, 2017)
stated that there were over 130 known IRGS in Queensland with 17 of these having resources over
1 million ounces. Sunshine have stated that Triumph is analogous to the Ravenswood IRGS gold
deposit which has an endowment in excess of 5 million ounces of gold (ASX SHN: Follow Up Drilling
at Liontown (19 June 2024)).
Resource Highlights
The Project is located across the historic Norton Goldfield and has a current JORC (2012) Mineral
Resource Estimate prepared over five prospects in close proximity: Inferred gold resource of
150,091 oz made up of 2,16 million tonnes at a grade of 2.17g/t gold using a 1g/t cut-off has been
declared in 2025.
More than 75% of the Triumph Inferred resource is within 100m of the surface and largely located
within 1.2km of strike within a 6km long structural corridor (ASX SHN: Follow Up Drilling at
Liontown (19 June 2024)). Dart considers that there is potential for proving up mineralisation below
current drilling and open pit depths that may result in underground mining options subject to
favourable economic studies.
10 | P a g e
APPENDIX TWO
JORC Code, 2012 Edition – Table 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut channels, random
chips, or specific specialised industry standard measurement
tools appropriate to the minerals under investigation, such as
down hole gamma sondes, or handheld XRF instruments,
etc). These examples should not be taken as limiting the
broad meaning of sampling.
• Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
• Aspects of the determination of mineralisation that are
Material to the Public Report.
• In cases where ‘industry standard’ work has been done this
would be relatively simple (eg ‘reverse circulation drilling was
used to obtain 1 m samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other cases more
explanation may be required, such as where there is coarse
gold that has inherent sampling problems. Unusual
commodities or mineralisation types (eg submarine nodules)
may warrant disclosure of detailed information.
• Sampling has been made on HQ and NQ diamond drilled core.
• Sampling is whole core sampling based on the geologists sub sampling
(down to 30cm) logging definition.
• As it is whole core, no sub-sampling techniques were used.
• Samples are prepared with PREP-31B which includes crush to 70 %
passing 2mm, riffle split off 1kg, pulverise split to better than 85%
passing 75 microns.
Drilling
techniques
• Drill type (eg core, reverse circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic, etc) and details (eg core
diameter, triple or standard tube, depth of diamond tails, face-
sampling bit or other type, whether core is oriented and if so,
by what method, etc).
• Drilling is diamond drilling either HQ or NQ core size and is triple tube
drilling. Core is oriented where possible using the Reflex ACT III tool.
Drill sample
recovery
• Method of recording and assessing core and chip sample
recoveries and results assessed.
• Measures taken to maximise sample recovery and ensure
representative nature of the samples.
• Whether a relationship exists between sample recovery and
grade and whether sample bias may have occurred due to
• Core is measured after each run and core recovery based on the drill
metres is recorded.
• Once in the transition and fresh material, Triumph experiences limited
to no core loss with the exception of intensely broken zones where
recovery is still > 95%.
11 | P a g e
Criteria JORC Code explanation Commentary
preferential loss/gain of fine/coarse material. • No relationship has been observed between sample recovery and gold
grade.
Logging • Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies and
metallurgical studies.
• Whether logging is qualitative or quantitative in nature. Core
(or costean, channel, etc) photography.
• The total length and percentage of the relevant intersections
logged.
• The drill core has been geologically and geotechnically logged to a level
to support appropriate mineral resource estimation, mining studies and
metallurgical studies. Core is logged both qualitatively and
quantitatively. Core tray photography is both wet and dry photography.
• All 2,761m have been logged so far. Sampling is discrete based on
observed mineralisation, alteration, key structural features.
Sub-
sampling
techniques
and sample
preparation
• If core, whether cut or sawn and whether quarter, half or all
core taken.
• If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
• For all sample types, the nature, quality and appropriateness
of the sample preparation technique.
• Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
• Measures taken to ensure that the sampling is representative
of the in situ material collected, including for instance results
for field duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain size of the
material being sampled.
• Core is whole core sampling so no sub-sampling techniques in the field
are used which ensures appropriate in-situ representation.
• The PREP-31B method includes crush to 70 % passing 2mm, riffle split
off 1kg, pulverise split to better than 85% passing 75 microns. The
larger 1kg riffle split is larger than the standard 250g to reduce sample
size bias.
• Sampling size is suitable to represent the mineralisation intersected.
Quality of
assay data
and
laboratory
tests
• The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is
considered partial or total.
• For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining the
analysis including instrument make and model, reading times,
calibrations factors applied and their derivation, etc.
• Nature of quality control procedures adopted (eg standards,
blanks, duplicates, external laboratory checks) and whether
acceptable levels of accuracy (ie lack of bias) and precision
have been established.
• All samples were analysed at ALS Global (ALS, Brisbane).
• All samples were assayed for Au using a 50g fire assay with AU-ICP22
determination as well as ME-MS61 for multi element. In the case
where key elements are over range, Ag, Pb, Zn, and Cu was completed
using OG-62. As completed with OG46, and Au completed with GRA22.
• The three types of QAQC samples were used were Certified Reference
Material (CRM/Standards), Field Duplicates, and Blank material.
• The Blanks consist of store-bought sand which has been shown to be
barren based on previous work. The Blanks are used to provide
information of any possible contamination or calibration issues during
the crush, pulverisation, and analytical phases. The field duplicates
utilised the spear to collect a second sample to test repeatability
(precision) of the original sample. The standards samples are used to
12 | P a g e
Criteria JORC Code explanation Commentary
test the accuracy of the analyses.
• Three CRMs were OREAS standards and include: OREAS 277, OREAS
245, and OREAS 233.
• QAQC samples were entered into the sample stream at a rate of 1 in
20.
• Where lower detection limits were reported for assay results these
were replaced by half the lower detection limit for geological
interpretation and modelling purposes.
Verification
of sampling
and
assaying
• The verification of significant intersections by either
independent or alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
• Discuss any adjustment to assay data.
• All core photos are reviewed by the Competent Person and he also
visited site during early drilling.
• No twinned holes have been undertaken.
• Data from the field log sheets is entered into a digital database,
primarily an Excel spreadsheet with subsequent conversion into an SQL
database maintained by EarthSQL at the completion of the hole. The
Excel spreadsheet has been created with a series of validation criteria
in the form of pulldown menus for each data entry that restricts what
can be entered into each field and significantly reduces the error
associated with data entry.
• Assay results are received from the laboratory in electronic (via email)
format onsite and sent to Sample Data importing to the EarthSQL
database. The electronic results are provided in an CSV file.
Location of
data points
• Accuracy and quality of surveys used to locate drill holes
(collar and down-hole surveys), trenches, mine workings and
other locations used in Mineral Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• Collars are collected by Dart Geologists using a dGPS Trimble device
and is suitable for collecting collar XYZ.
• All collar coordinates are in MGA94 Z56.
• Downhole survey has been surveyed using Reflex survey tool.
• AHD Resources was provided a 3D elevation topography or digital
terrain model (“DTM”) for the Triumph area from Dart Mining in the
form of a .msh file.
Data spacing
and
distribution
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
• Whether sample compositing has been applied.
• The drilling is in fill drilling of the existing Mineral Resource Estimate. As
such, the geological continuity is known and expected. Where new
lodes are intercepted, multiple drill holes confirm the new lodes along
strike. Given the close proximity to the existing MRE, the spacing is
sufficient to have confidence in the continuity.
13 | P a g e
Criteria JORC Code explanation Commentary
• No sample compositing has been applied.
Orientation
of data in
relation to
geological
structure
• Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which this is
known, considering the deposit type.
• If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to have
introduced a sampling bias, this should be assessed and
reported if material.
• Drilling is typically orientated perpendicular to the interpreted strike of
mineralization where possible.
• No orientation-based sampling bias has been recognised. However, in
some cases the drilling has been sub-parallel to mineralised structures.
This has been accounted for in the geological interpretation of the
mineral resources and modelled as true thickness based on the
interpretation.
Sample
security
• The measures taken to ensure sample security. • Samples are under the care of Dart Geologists from logging through to
delivery to ALS in Brisbane.
Audits or
reviews
• The results of any audits or reviews of sampling techniques
and data.
• No external reviews of audits on this drilling have been completed.
Drilling has been reviewed internally within Dart.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria JORC Code explanation Commentary
Mineral
tenement
and land
tenure status
• Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint
ventures, partnerships, overriding royalties, native title interests,
historical sites, wilderness or national park and environmental
settings.
• The security of the tenure held at the time of reporting along with any
known impediments to obtaining a licence to operate in the area.
• The Triumph project consists of EPM 18486 and EPM 19343,
both 100% owned by Dart Exploration (QLD) Pty Ltd, a wholly
owned subsidiary of Dart Mining NL. The tenements are in good
standing, and no known impediments exist.
• ML80035 (Norton Mine ML or Norton Mining Lease) (covering
an area of 0.2km) is located within the project area and is
excluded from the tenure.
• Exploration is prohibited within a small area of Category B
environmentally protected area as well as a National Park
shown in Figure 2. The current approved Environmental
Authority (EA) allows for advanced exploration activities to
occur up to the National Park (NP) boundary.
Exploration
done by
other parties
• Acknowledgment and appraisal of exploration by other parties. • The first record of modern exploration being undertaken in the
area was carried out by Delhi Australian Petroleum Limited
(Delhi) from 1966 to 1971. Initially Delhi undertook gridding,
14 | P a g e
Criteria JORC Code explanation Commentary
mapping of the old workings, dump sampling and an IP survey.
The IP survey highlighted five anomalous zones in and around
the old Norton workings. Three of these zones, at the
Frampton, Bald Hill and Galena prospects, were drill tested with
five holes by Noranda Australia Limited in 1969 in joint venture
with Delhi. Following Noranda’s withdrawal from the joint
venture Delhi completed a further three drillholes, one at each
of the Bald Hill, Frampton and New Constitution prospects.
Frampton is now part of ML 80035. Significant gold
intersections in drillholes outside of ML 80035 were reported,
for example NCDH-1 at the New Constitution prospect that
returned 1.5 m @ 5.5 g/t Au and 24.5 g/t Ag from 109.8 m
depth.
• A significant amount of exploration was undertaken by Amoco
Minerals Australia Company, its successor Cyprus Minerals
Australia Company and joint venture partners Pacific
Goldmines, Astrik Resources and Climax Mining Limited on EPM
3581 between 1985 and 1988. Much of this work was focused
on close-spaced drilling at the Frampton, Chandler and Never
Never prospects now within the Norton Gold Fields ML – to
outline ore reserves. Within the area of EPM 18486 the work on
historical EPM 3581 consisted of stream sediment, rock and
float sampling as well as trenching at Bald Hill and Han’s Big
Dyke and drilling at Bald Hill. Nine holes at the eastern end of
the Frampton-Chandler prospect also lie within SHN’s EPM
18486. Seven of these holes intersected narrow (0.2 m to 1 m)
intervals of high-grade gold mineralisation – examples being 1
m at 16.6 g/t, 1 m at 12.0 g/t and 0.2 m at 24.6 g/t.
• From 1993 to 1999 much of the area was held by Gold
Exploration Pty Ltd and subsequently Coffee Gold NL under EPM
9778. MDL 130, then covering the core of the Norton goldfield,
was excluded from this project. The work undertaken during
this period was minimal and consisted mainly of rock chip
sampling and geological reconnaissance work.
15 | P a g e
Criteria JORC Code explanation Commentary
• Following a hiatus of several years the Norton Goldfield and
surrounding area was held under EPM 13584 and ML 80035,
initially by AT Prowse and latterly by Norton Gold Fields Limited
from 2002. EPM 13584 has been surrendered but ML 80035 still
exists.
Geology • Deposit type, geological setting and style of mineralisation. • The local geology comprises the metasedimentary Wandilla
Formation (part of the Devonian-Carboniferous Curtis Island
Group)
Share your feedback