AGM Investor Presentation
Released
Released
Announcement PDF
Unlocking Value in
Australia’s Precious &
Critical Minerals
An Australian gold and critical minerals explorer with two core
assets, a pipeline of early-stage ground and built-in optionality.
DartMining NL / ASX:DTM / OTC:DRTMF / FRA:IQR
I N V E S T O R P R E S E N T A T I O N | N O V E M B E R 2 0 2 6
dartmining.com.au ASX:DTM 2
dartmining.com.au ASX:DTM 2
Disclaimer
Forward-Looking Statement
This presentation has been prepared by Dart Mining NL (“Dart Mining” or “Company”). It contains forecasts
and forward looking statements which are not a guarantee of future performance and which involve certain
risks. Actual results and future outcomes will in all likelihood differ from those outlined herein. The
presentation should not be construedas an offer or invitation to subscribe for or purchase securities in Dart
Mining, nor is it an inducement to make an offer or an invitation with respect to said securities.
The Company believes that it has a reasonable basis for making the forward-looking statements in the
announcement based on the information containedin this and previous ASX announcements.
This presentation includes historical exploration results and project information. The Company is not aware
of any new information or data that materially affects the information included in this presentation, and the
Company confirms that, to the best of its knowledge, all material assumptions and technical parameters
underpinning the exploration results in this release continueto apply and have not materially changed.
Forward-looking statements are statements that are not historical facts. Words such as “expect(s)”,
“feel(s)”, “believe(s)”, “will”, “may”, “anticipate(s)” and similar expressions are intended to identify forward-
looking statements. These statements include, but are not limited to statements regarding future
production, resources or and exploration results.
All such statements are subject to certain risks and uncertainties, many of which are difficult to predict and
generally beyond the control of the Company, that could cause actual results to differ materially from those
expressed in, or implied or projected by, the forward-looking information and statements. These risks and
uncertainties include, but are not limited to: (i) those relating to the interpretation of drill results, the
geology, grade and continuity of mineral deposits and conclusions of economic evaluations, (ii) risks
relating to possible variations in , grade, planned mining dilution and ore loss, or recovery rates and changes
in project parameters as plans continue to be refined, (iii) the potential for delays in exploration or
development activities or the completion of feasibility studies, (iv) risks related to commodity price and
foreign exchange rate fluctuations, (v) risks related to failure to obtain adequate financing on a timely basis
and on acceptable terms ordelays in obtaining governmental approvals or in the completion of development
or construction activities, and (vi) other risks and uncertainties related to the Company’s prospects,
properties and business strategy.
Our audience is cautioned not to place undue reliance on these forward-looking statements that speak only
as of the date hereof, and we do not undertake any obligation to revise and disseminate forward-looking
statements to reflect events or circumstances after the date hereof, or to reflect the occurrence of or non-
occurrence of any events.
Competent Persons’ Statement
The information in this presentation that relates to exploration and Mineral Resources has been prepared,
compiled, and verified by Mr Andrew Dawes, who is a Member of the Australasian Institute of Mining and
Metallurgy and a Member of the Australian Institute of Geoscientists. Mr Andrew Dawes is employed by AHD
Resources and consults to Dart Mining NL. Mr Dawes has sufficient experience that is relevant to the style of
mineralisation and type of deposits under consideration and to the activity being undertaken to qualify as a
competent person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves”. Mr. Dawes takes responsibility for the exploration results,
and consents to the inclusion in the report of the matters based on his information in the form and context
in which it appears.
The Exploration Target has been prepared and reported in accordance with the Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves, 2012 Edition (JORC Code). The
information in this presentation has been prepared, compiled and verified by Mr Andrew Dawes, who is
a Member of the Australasian Institute of Mining and Metallurgy and a Member of the Australian Institute of
Geoscientists. Mr Andrew Dawes is employed by AHD Resources and consults to Dart Mining NL. Mr Dawes
has sufficient experience that is relevant to the style of mineralisation and type of deposits under
consideration and to the activity being undertaken to qualify as a competent person as defined in the 2012
Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves”. Mr. Dawes takes responsibility for the exploration results, and consents to the inclusion in the
report of the matters based on his information in the form and context in which it appears.
The information in this report that relates to Exploration Results in respect of the Project to be acquired
pursuant to the Acquisition is based on, and fairly represents, information compiled by Mr Cain Fogarty, who
is a current Member of the Australian Institute of Geoscientists (AIG). Mr Fogarty is employed as a consulting
Technical Advisor to DTM, is a vendor of the Yamarna Project and owns securities in DTM. Mr Fogarty has
sufficient experience, which is relevant to the style of mineralisation and types of deposit under
consideration and to the activities undertaken, to qualify as a Competent Person as defined in the 2012
Edition of the “Australasian Code of Reporting of Exploration Results, Mineral Resources and Ore Reserves”.
Mr Fogarty consents to the inclusion in the report of the matters based on the information in the form and
context in which it appears.
Dart Mining confirms that it is not aware of any new information or data that materially affects the
information included in this, or referenced relevant market announcements and, in the case of estimates of
mineral resources or ore reserves, that all material assumptions and technical parameters underpinning the
estimates continueto apply and have not materially changed.
dartmining.com.au ASX:DTM 3
dartmining.com.au ASX:DTM 3
Our Strategy
Advancing a pipeline of opportunities across Australia
NEAR-TERM CATALYSTS: Walwa drilling assays(Dec), Triumph resource growth work, completion of Indigo andBuckland sales.
01
Resource growth at
Triumph
150 koz1
Au Inferred
Resource inan intrusion-
relatedgold system
Most drilling is shallow, with
depth andstrike open
Exploration Target of
285koz to 613koz within
500m of the current
resource1*
02
Exploration Upside
at Walwa
Victoria's largest recorded
primary hardrock tinfield
Rock chips up to 3.96% Sn2
with tantalum andniobium
First hole intersected 29.4
m of pegmatite from 333.4
m; assaysdue December
2026
03
Low-cost
exploration pipeline
Low-cost, equity-aligned
entriesat Yamarna (WA)
andPine Creek (NT)
Gold, tungstenand
tantalum targets around
Walwa andRushworth
Ideasgenerated
organically
04
Optionality and value
generation
Project divestments
totalling $4.3M3
(contracted,
conditional)
Coonambula JV (45% earn-
in, pathway to 51%)
Convert non-coreassets
into capital and retained
exposure
Sources: 1. ASX:DTM 4March 2025(Mineral Resource), 11 November 2025 (Exploration Target). 2. ASX: DTM16September 20263.ASX:DTMMarch2026,9 June2026and 3November 2026(Indigo); 20 August
2026(placement); 24 November2026 (WalwaWDD001; down-holelength, true width not yet known). Saleproceeds arenotreceiveduntilcompletion.
*The potential quantity and grade of the Exploration Target is conceptual in nature and, assuch, there has been insufficient exploration drilling conducted to estimate a Mineral Resource. At this stage it is
uncertain if further exploration drilling will result in the estimation of a Mineral Resource.
dartmining.com.au ASX:DTM 4
dartmining.com.au ASX:DTM 4
Corporate Snapshot
Capital Structure1 Board & Management
MR. JAMES CHIRNSIDE
Executive Chairman
• +40years experience across fund
management, commodity trading, investment
banking, & mining operations
• DTM Executive Chairman since 2016.
• Bachelor of Business degree from Edith
Cowan University
MR. RICHARD UDOVENYA
Non-Executive Director | Lawyer
• Principal of Resources Law International
(Melb), focussed on natural resources
projects in Australia and Africa
• 40years legal experience in Aus and NZ
• Director of, and a legal advisor to, several Aus
and international resources companies
MR. DEAN TURNBULL
Non-Executive Director | Founder, Geologist
• +30 years’ as an exploration / mine geologist
specialising in 3D geological and structural
modelling
• Instrumental in the discovery and exploration
of the Unicorn Porphyry Mo–Cu–Ag project
• Member of AIG, Geology graduate, postgrad
Honours in geology from Key Centre for Ore
Deposit & Exploration Studies (CODES)
MR. TERRY BATES
Non-Executive Director | Geologist
• Exploration geologist with experience across
business and environmental management,
and as a Company Director
• Worked mining projects across Aus, West
Africa, Europe, South America, & APAC
• Strong expertise in corporate strategy and
management systems
• Honours degree in Geology, MBA and Dip AICD
$0.006
SHARE PRICE
as at 24 Nov 2026
$3.2M
MARKET CAP
$1.7M
CASH RESERVES
as at 30 Sept 2026 (inc $1.43M from
Aug 2026 Placement - Tranche 2)1
~256.9M
LISTED OPTIONS
Avg Ex Price: $0.062
Exp: 7 May 2028 - 31 Oct 2028
~260.2M
UNLISTED OPTIONS
Avg Ex Price: $0.019
Exp: 29 May 2028 - 30 Sept 2029
~56%
TOP 20 OWNERSHIP
535.5M
SHARE ON ISSUE
as at 24 Nov 2026
$4.3M
NON-CORE
DIVESTMENTS2
Sources: ASX:DTM 20 August 2026 (Placement Details). 1. Pro-formacapital structure includes shares issued under Tranche2 of the Placement announced 20 August 2026. 2. ASX:DTM March2026, 9June
2026and 3November 2026(Indigo); 20 August2026 (placement). Saleproceeds arenot receiveduntilcompletion.
dartmining.com.au ASX:DTM 5
dartmining.com.au ASX:DTM 5
Our Strategy
Advancing a pipeline of opportunities across Australia
RESOURCE GROWTH
Triumph & Coonambula
Central QLD, 100%.150 koz Au
Inferred Resource1; Exploration
Target well beyond the current
resource2.
Coonambula Sb-Au,
QLD (45% JV);
DISCOVERY UPSIDE
Walwa Sn-W-Ta
Project
NE VIC, 100%; VIC’s largest
recorded primary hardrock tin
field, first hole drilled to depth
OPTIONALITY
Non-Core assets,
JV’s
Indigo & Buckland sales, VIC
(pending); Rushworth & non-
coreVIC ground
EARLY STAGE PIPELINE
Low-cost, generative
Walwa W-Ta-Au targets, VIC;
Yamarna Au-Li, WA;
Pine Creek U-Au-Cu-Sn-W, NT;
Raglan Au-Cu, QLD
Sources: ASX: 1. DTM4 March2025 (MineralResource), 2.DTM11November 2025(Exploration Target)
dartmining.com.au ASX:DTM 6
dartmining.com.au ASX:DTM 6
Triumph Gold Project Central QLD
Advanced gold resource with
growth potential
150 koz gold resource, open at depth and along strike
• Intrusion-relatedgold system near the historic Norton goldfield,
~50 km southof Gladstone
• Inferred JORC 2012 Mineral Resource Estimate (MRE):
2.16 Mt @ 2.17g/t Au for 150,000oz (1 g/t cut-off)1
• Covers 5 closely spacedprospects (New Constitution, South
Constitution, Big Hans, Super Hans andBald Hill)
• 43% of contained ouncessit within50 m of surface and 77% within
100 m, supportingopen pit potential
• Exploration Target (outside the existingMRE):
5.1 to 7.6 Mt @ 1.72 to 2.52 g/t Au for 285,100 to 613,200 oz2
*
• Built from 216 drill interceptsacross 41 lodes, historical drilling is
shallow
Sources: ASX:1. DTM4 March2025 (MineralResource), 2.DTM11November 2025(Exploration Target).*The potential quantity and gradeoftheExplorationTarget is conceptual in nature and, as such, there has
beeninsufficient explorationdrilling conducted to estimate aMineralResource. At this stageit is uncertain if further explorationdrilling will result in the estimation of a MineralResource.
dartmining.com.au ASX:DTM 7
dartmining.com.au ASX:DTM 7
Triumph Gold Project Central QLD
High-grade mineralisation
outside the resource
Drilling to extend the system at depth and to the east
• Existing resource drilling highlights1
:
• 10m @ 26.86g/tAu from 51m (TDH056)
• 16m @ 8.44g/t Au from 38m (22SHRC018)
• 16m @ 5.48g/t Au from 34m (21SHRC002)
• 17m @ 4.30g/tAu from 1m (TDH118)
• 2025 program: 17 DD holes (2,761m) at New constitution, South Constitution
andBig Hans - highlight significant extensions, not yet incorporated into the
current JORC 2012 MRE
• Big Hans hole TRDD012: 4.4m @ 8.99 g/t Au from 171m, incl. 0.3m @ 114 g/t
Au and 3.1m @ 7.98 g/t Au from 179m, incl. 0.5m @ 45 g/t Au2
• New Constitution holeTRDD014: 1.4m @ 9.31 g/t Au from 56m, incl. 0.5m @
28.20 g/t Au and 2.6m @ 4.34 g/t Au from 233m, incl. 0.5m @ 24.6 g/t
Au (new lode)3
• Parallel lodes discovered by deep drilling, system open east and at depth
Sources: ASX: 1. DTM 14 October 2024,2. DTM22July 2025(TRDD012)and 3. DTM 20 November 2025(TRDD014). Intervals aredownhole lengths; truewidths not yet known. Cross section: TRDD014 throughNew
Constitution.
dartmining.com.au ASX:DTM 8
dartmining.com.au ASX:DTM 8
Triumph Gold Project Central QLD
Sources: ASX 1. DTM26March 2026,4 March 2025(MineralResource),11 November2025 (ExplorationTarget). The potential quantity and grade of the ExplorationTarget is conceptual; there has been insufficient
explorationto estimatea MineralResource andit is uncertain iffurther explorationwillresult inone, Rock chips areselective samples and not representative ofgrade.
A clear plan to grow the resource
Staged program to test the Exploration Target
• Step 1: Rework geophysicsand target the Exploration
Target lodes
• Step 2: New Constitutionresource update
• Step 3: Staged drill program across theExploration
Target lodes, prioritised by cost per ounce added
• Priority targets:
• Depthbeneath the SouthernMineralised
Corridor; chargeability anomaly NW of New
Constitution
• Northern Corridor where rock chips returned
109 g/t Au & 105 g/t Ag (RCKCH01) at Chandlers
and 73 g/t Au (RCKSG01) at Spotted Gum1
dartmining.com.au ASX:DTM 9
dartmining.com.au ASX:DTM 9
Coonambula Sb & Au Project* Central QLD
*Farm-inJoint Venture withGreatDivideMining(ASX:GDM). Dart has completedthedrilling required for a 45% interest and may earn up to51% oncompletion oftheMineralResource
Estimate. Sources: ASX:DTM 12 March2025,25February 2026, 16 April2026,4 June2026,10 June2026.
Low-cost entry with clear pathway to JORC MRE
One of the largest historical antimony
mining complexes in Central QLD
• Farm-in JV with Great Divide Mining (GDM):
45% earned, pathway to51% on resource and
metallurgy milestones
• 25km SW of Eidsvold goldfield, 70km SE of
Aeris Resources Cracow gold mine
• Shear-hosted Sb-Au-Ag lodesin granitoids of
the Rawbelle Batholith, within the New
England Orogen
• IP survey highlights anuntested northern
target, where chargeability coincides with
elevatedgold and antimony in soils
• Nextsteps: metallurgical testwork, 3D
modelling anda maidenJORC MRE
dartmining.com.au ASX:DTM 10
dartmining.com.au ASX:DTM 10
Coonambula Sb & Au Project* Central QLD
Sources: ASX: DTM10 November 2025, 15December 2025, 19February 2026, 16 April2026,10 June2026, 9July 2026. Intervals aredownhole lengths; true widths not yet known.
Gold along the full 730m strike, with an antimony-rich core
41 diamond holes for 4,100m completed,
maiden MRE next
• 41 diamond holes tested 730m strike to 185m vertical
depth, mineralisation remains openalong strike and at
depth
• Final assaysconfirm gold from end toend of thedrilled
strike
• Standout intercepts:
• 9.0m @ 5.8% Sb, 2.67 g/t Au from 32.5 m
(CBADD010)
• 6.5m @ 5.1 g/t Au from 180m (CBADD002)
• 4.9m @ 5.27 g/t Aufrom 21m (CBADD013)
• 1.3m @ 10.5% Sb, 3.8 g/t Au from 8.7m (CBADD006)
• Antimony andsilver concentrated in a central zone of
about 320 m. Goldcontinues west, where antimony
grades are generally <0.1% Sb
dartmining.com.au ASX:DTM 11
dartmining.com.au ASX:DTM 11
Walwa Sn-W-Ta Project NE Victoria
Source: ASX: 1. Bowen (1970). Mt Alwa andTheBounceTinMines. Miningand GeologicalJournal, Victoria.Vol6, No 6, 2. DTM 25
August 2026. Disclaimer: Historicalproductionand drilling datahas not been independentlyverified bytheCompany. Resource
estimates are not reported inaccordance withtheJORCCode2012. ACompetentPersonhas not done sufficient workto classify
themas MineralResources,and it is uncertain whether furtherwork willallow themto be reportedas such.
Victoria’s largest tin field,
never drilled at depth
Maiden 1,500 m diamond program underway
• 1,034 km²acrossthree 100%-owned licences with access tracks and
drill benches inplace
• Historic Walwa (Mt Alwa) tinmine sits onEL007426 and has the
highest recorded primary tinproduction in Victoria
• Mined from 1882and ~97kt of ore treatedfrom the open pit in late
1960s1
• 150 historical holes averaged ~50m; the deepest reached only 160m
• Historical intercepts: 5.1m at 0.34% SnO₂ from 7.5m and 6.1m at
0.58% SnO₂ from 35.1m (DDH2)2
• Pre JORC Historical MREs: 8.64 Mtat 0.163% Sn and 50 ppm Ta₂O₅,
andhigher-gradeselectivezone of 993,000 t at 0.38% Sn and 55
ppm Ta₂O₅ (Union Corporation, 1983)2
dartmining.com.au ASX:DTM 12
dartmining.com.au ASX:DTM 12
Walwa Sn-W-Ta Project NE Victoria
Source: ASX: 1. DTM 16 September 2026. Selectivegrab and float samples of visibly mineralised rock; not representative ofaverage dyke grade. Photois illustrativeonly.Historicalresults not
independently verified.
Surface results highlight
multi-element potential
High-grade tin confirmed, with tantalum and
niobium1
• 4 rock chip samples collectedby DTM (Jun2026) returned
elevatedlithium (31 to 170 ppm), rubidium (871 to 2,611 ppm) and
caesium (50 to 156 ppm)
• Results from the sampling are consistent with a highly
fractionated rare-metal pegmatitesystem
• Results from the program include:
Image: SampleWWP002 with interpreted black cassiteritein pegmatite from the pitwall ofthe
historicWalwa openpit
Sample Type Location Sn % Tappm
WWP002 In-situ grab SW wall, historicpit 3.96 165
WWP001 Float Pit floor 1.09 70
WWP003 Float Northof pit 0.61 29
WAS001 Outcrop grab Mt Alwa South,~700 m SSW 0.40 24
dartmining.com.au ASX:DTM 13
Walwa exploration model
Schematiconly,notto scale. Whitedashedlines show indicativedrilling direction only; finalhole design depends onresults. Depths from ASX: DTM25August and22October 2026.
Walwa Sn-W-Ta Project NE Victoria
Surface dykes are the roof of a buried tin system
• Stacked dykes. Tin-bearing aplite-pegmatite dykes below
the historically mineddykes(up to 8 m thick, dip 20-30° N-
NE and form a broad dome)
• 4 major dykes outcrop at the mine plus 2 more found in
drilling
• Feederstructures. Conduits to thesource, potential hosts
for thicker, continuous mineralisation
• Greisen Cap. Conceptual greisen-hosted tinzoneat the
top of the causative intrusion, est ~400 to 600 m below
surface, the larger-tonnageconcept
dartmining.com.au ASX:DTM 14
Maiden diamond drilling underway
Walwa Sn-W-Ta Project NE Victoria
Source: ASX:1. DTM22October2026 and2. DTM24November 2026Timing depends on contractor availability, weather and access conditions.
1,500m program testing the tin system below 160m for
the first time
• 9 drill pads DGPS-surveyed & permitted on existing tracks; allowing
for multipleholesper pad1
• Targetingholes beneath thehistoric pit, with resultsto guide later
holes
• HoleWDD001 drilled to 424.9 m (as at 18 Nov 2026) andis continuing
towards thedeeper greisen target2
• Drilling, loggingand sampling are continuing, with first assay results
expected in December 20262
Running alongside:
• Rock chip and channel sampling of tantalum-enriched albitite dykes
at Snake Gully
• Field inspection of McHargs (tungsten) andHall's (gold)
• Maiden drill planningat Koetong
dartmining.com.au ASX:DTM 15
First hole intersects thick
pegmatite at depth
Walwa Sn-W-Ta Project NE Victoria
WDD001 drilled to 424.9 m; drilling is continuing
• Pegmatite and aplite logged in nine intervals between30.65 m and
362.8 m down hole
• 29.4 m down-hole interval of pegmatite from 333.4 m, incl. 0.95 m
of metasedimentary rock
• Top of the interval is+300 m vertically below the collar, well below
the 160 m limit of historical drilling
• Pegmatite, aplite and greisenbecome more frequent below 333.4
m, suggesting the hole is approaching the targeted intrusion
• Further pegmatite, aplite and greisen seenin core photographs
below 362.8 m are yet to be logged
Source: ASX: DTM 24 November 2026 (WDD001) and 25 August 2026 (historical drilling). All intervals are down-hole lengths; true
widths arenot yet known. Historicalholes areprojected onto the section from upto 85 m either side. *Visual estimatesof mineral
abundance should never be considered a proxy or substitute for laboratory analyses where concentrations or grades are the
factor of principal economic interest. Visual estimatesalso potentially providenoinformation regarding impurities or deleterious
physicalproperties relevant to valuations.
dartmining.com.au ASX:DTM 16
Cassiterite logged from near
surface to 362.8m
Walwa Sn-W-Ta Project NE Victoria
Visual estimates; assays due December 2026
• Cassiterite or interpreted cassiterite logged in four of five
upper dykes, including in the 29.4 m interval at depth*
• Visible cassiterite (tin oxide, SnO₂) has been logged inthe
29.4 m interval (see images A & B)
Source: ASX: DTM24November 2026. Alllogged pegmatite and apliteintervals,including thosewith no or trace cassiterite,arereportedintherelease.
*Cautionarystatement onvisual estimates: Visualestimates ofmineralabundanceshould never beconsidered aproxyor
substitutefor laboratory analyses where concentrations or grades arethefactor of principaleconomicinterest. Visual
estimates alsopotentially providenoinformationregardingimpurities ordeleterious physicalproperties relevant to
valuations. The cassiteritecontent of the logged dykeintervals is visuallyestimated at less than2%. Laboratory assays
arerequiredto determinegrade. Allintervals are down-holelengths; truewidths arenot yetknown. The specimens shown
herewere selectedto show thecoarsecrystals and arenot representative ofthedykeas a whole.
From (m) To (m) Length (m) Logged observation*
30.65 38.40 7.75
Pegmatite and aplite; fine specks interpreted
as cassiterite
62.10 66.00 3.90
Aplite-dominant dyke; crystals to 50 mm
interpreted as cassiterite (images C and D)
129.80 133.30 3.50
Pegmatite with greisen; cassiterite crystals to
20 mm
333.40 362.80 29.40
Pegmatite (incl. 0.95 m metasediment); coarse
cassiterite at two points, sporadic specks
Image: Selected core specimen from the pegmatite interval inWDD001 at about 360.3 m, showing coarse dark
cassiterite crystals with green muscovite
Image: Close-up of thesame specimen.This specimen was selected to show the coarsecrystals and is not
representative of the interval as a whole* (NQ core).
C D
Image:Selected core specimens between 62.1 m and 66.0 m in WDD001, showing coarse dark red-brown
crystals interpreted to be cassiterite. C: crystal ~12 mm long nearthe upper contact ofthe dykeat~62 m.
D: crystal ~50 mm long at ~63.3 m.
dartmining.com.au ASX:DTM 17
Early-stage pipeline targets
Walwa District Targets NE Victoria
Tungsten, tantalum and gold prospects around Walwa
Koetong
• Sits on KoetongGranite, same host as Mt Paynter W-Sn deposit
(NSW) and includesseveral historic tungsten mines - Keady's,
Roper’s, Roper and O'Doughlin's, and Mclntyre’s
• Historic grab samples from Keady’sreturned assays up to 5.94%
WO3 & 10.0% Sn1
.
McHargs
• 2014 field work (AL8) defined a 3.1 km x 0.3 km tungsten soil anomaly
• Historic intersections of 2.3m @ 0.53% WO3 from 27.4m (DDH1),
3.1m @ 0.88% WO3 from 18.29m (DDH2)1
• Historical resources: 17kt at 1.26% WO₃ over 90 m of strike
(Comalco), and 353kt at 0.6% WO₃ (R.B. Mining)*
• Maiden drilling targetedfor 2027, pending landaccess
Hall’s
• Located 2km E along the same fault as McHargs with historic rock
chips up to 7.4g/tAu1
Source: 1. ASX: DTM 4 August2026.Disclaimer: Historicalproductionand drilling datahas not been independentlyverified bytheCompany. *Resourceestimates are not reported inaccordance withtheJORC
Code2012. ACompetent Person has not donesufficient worktoclassify themas Mineral Resources, and itis uncertainwhether further work will allowthemto bereported as such.
dartmining.com.au ASX:DTM 18
100% owned optionality
Other Victorian Projects
Located in proven Victorian gold and pegmatite provinces
Rushworth (Gold)
• 3x EL’s + 2x ELA’s over historic Rushworth Goldfield, ~100koz Au est
historical productionfrom high-grade reefs over 14km strike1
• LiDAR identified +4,600 historic workings to~40m, depth largely untested2
• 2025 DTM drilling returned 12.8m @ 1.75g/t Au from 36.7m downhole, incl.
1.6m @ 4.55g/tAu (PXDD006)3
Dorchap (Lithium)
• Covers ~60 km of the Dorchap DykeSwarm. Spodumene identified in
multiple pegmatite dykesover 12km strike
• Limited preliminary sampling confirmslithium‐fertile LCT dykesup to 1.13%
Li2O4
Granite Flat (Copper-Gold)
• Cu-Au porphyry and intrusion-relatedtarget betweenMitta Mitta and Glen
Wills, includeshistorical 3km x 2km Cu-Au soil anomaly5
• DTM drillingintersecting broad gold zones with Cu, Ag & Mo5
Source: ASX:1. DTM5November 2020,2. DTM4 April 2017,3.DTM24 December 2025(Rushworth); ASX: 4. DTM 20 June2024 (Dorchap). 5. DTM4 August 2022 (Granite Flat)Historicalproduction
figures are fromhistoricalrecords and havenot beenindependently verified.
dartmining.com.au ASX:DTM 19
District-scale ground next to
an +7Moz gold mine
Yamarna Au-Li Project WA
**Selectivesurface sample, not representative of a mineralised width (initial assay 19.86g/t Au). Historicalresults arefromWAMEX reports and havenot beenindependently verified.Sources: ASX:DTM 20
August 2026. DTM18November 2026
865 km² of largely undrilled tenure in the Yamarna district
• 1 granted EL and 7 applications across Yamarna South(320 km²) and
Yamarna North(545 km²)
• ~25km from Gold Fields’ 7.4 Moz Gruyere mine, with65km of strikealong
the Yamarna Shear Zone at Yamarna South
• Historical auger sampling outlined a gold-in-soil trend more than 20 km
longthat hasnever beenfollowedup
• Yamarna Northcovers a major jogin theshear zoneand magnetic
targets interpreted aspossible intrusions
• Historical rock chip at Sail & Anchor returned 19.9 g/t Au (repeat
assay)**
• Low-cost, equity-aligned entry
• Planned work: infill auger and geophysics at Yamarna South, then
aircore at Yamarna North
dartmining.com.au ASX:DTM 20
Large multi-commodity footprint
in a major mineral province
Pine Creek Project* NT
*These are applications, not grantedtenure. Completion is subject to due diligence, formal documentation andministerial approvalofthetransfer. Mineralisation in the wider provinceis not necessarily
indicative of mineralisation onDart’s applications. Source:ASX:DTM 29May 2026.
Seven exploration licence applications over about 4,717 km²
• Located inPine Creek Orogen, a province with +1,000 knownmineral
occurrences, including the Ranger andJabiluka uranium deposits
• Prospectivefor uranium, gold, copper, tin and tungsten
• Covers projected extensionsof thefault systems linkedto the Coronation
Hill and El Sherana corridors
• Known occurrences include historic tin andtungsten mines inthe
Yeuralba field, gold andcopper prospects at Eva Valley, andsecondary
uranium at the ABC prospect
• Low-cost entry: $150,000 total consideration($3,000 deposit paid)
• Priority targets on grant: unconformity-relateduranium beneath
Kombolgie sandstonecover, then gold, tin-tungstenand copper-gold
dartmining.com.au ASX:DTM 21
dartmining.com.au ASX:DTM 21
Divestment of Non-Core Assets NE VIC
Sources: ASX:DTM March2026, 9June 2026and 3November 2026(Indigo); 20 August 2026(placement).Sale proceeds arenot received untilcompletion.
Generating low-cost,
non-dilutive exploration capital
~$4.3M in contracted, conditional value
Buckland Project (pending completion)
• Sold to Daybreak Minerals Pty Ltd
• Consideration: $300k cash
• Retained Value: Right of first refusal on drilling services
Northern Porphyries (conditional on Indigo IPO)
• Sale of project portfolio including Mt Unicorn, Sandy Creek
and Tallandoon
• Consideration: $4.0M (50% cash + 50% Indigo shares @
IPO price) - $250k innon-refundable exclusivity fees
received to date
• Retained Value: 2.5% NSR on antimony from Sandy Creek
and Tallandoon, and right of first refusal ondrillingservices
dartmining.com.au ASX:DTM 22
News flow generated from all four strategic pillars
Pipeline of catalysts across the portfolio
Q4 2026 Q1 2027 Q2 2027 Q3 2027 Q4 2027
Triumph
Walwa &
District
Coonambula
Yamarna
Pine Creek
Geophysics rework, targeting (wet season) Advance diamond drilling
Resource update & growth drilling
District fieldwork
Metallurgy, 3D model
Ongoing diamonddrilling &
assays
McHargs drilling (subject to access)
Follow-up drilling
Hole 1& first assays
(WDD001)
Lady Mary, west drilling
Maiden MRE
Auger, geophysics
DTM GM approval Heritage, land access
Grants & land access
dartmining.com.au ASX:DTM 23
dartmining.com.au ASX:DTM 23
Our Strategy
Why Dart, Why Now
A GOLD RESOURCE
WITH ROOM TO GROW.
150 koz at Triumph, open at depth
and along strike, with a clear plan
to grow it
01
TIN DISCOVERY
UPSIDE, DRILLING NOW.
Walwa is being tested below the
160m limit of historical drilling for
the first time
02
PIPELINE OF VALUE
ACCRETIVE ASSETS.
Disciplined capital strategy
delivering Low-cost entries and
turning non-core assets into value
03
dartmining.com.au ASX:DTM 24
CONTACT
James Chirnside – Executive Chairman
Dart Mining NL (ASX: DTM)
jchirn
Share your feedback
Discover