ROCK CHIP SAMPLES - ANNOUNCEMENT AMENDMENT
Dart Mining NL (ASX: DTM) (“Dart”, or “the Company”) wishes to advise that the following
amendments have been made to the announcement released on 20th December 2024 ‘Triumph
Rock Chip Sampling’.
These amendments are included in the attached revised announcement.
•
The title has been updated to remove ‘Mineralised’ from the heading.
•
Reference to the pXRF results have been removed from page 2 and the following caution
added:
Visual estimates of mineralisation abundance should never be considered a proxy or
substitute for Laboratory analysis. Visual estimates potentially provide no information
regarding concentration of economic grades or factors, impurities or deleterious physical
properties relevant to valuation.
•
The Competent Person Statement on page 5 now includes the person taking responsibility
for the exploration results.
Sample details have now been included in Appendix 1 and the previous Appendix 1 is now
labelled Appendix 2.
A cautionary statement has been added after the Mineral Resource Estimate in Table 3,
Appendix 2.
The JORC Code has now been included at Appendix 3.
•
•
•
Approved for release by the Board of Directors.
For more information contact:
James Chirnside
Managing Director
Dart Mining NL
jchirnside@dartmining.com.au
+61 447 447 613
Dart Mining NL
ABN: 84 119 904 880
Level 6, 412 Collins Street
Melbourne VIC 3000
Aimee Coates
Investor Relations
Dart Mining NL
acoates@dartmining.com.au
Contact: James Chirnside
Email: jchirnside@dartmining.com.au
Mobile: +61 447 447 613
Webpage: www.dartmining.com.au
LinkedIn: Dart Mining NL
Twitter: @DartMining
ASX Release
23 December 2024
ROCKCHIP SAMPLES SUPPORT NEW TARGET AREAS AT TRIUMPH
HIGHLIGHTS
•
•
•
•
•
•
•
Phase 1 Drilling underway at the Constitution prospect.
Drilling will pause over the Christmas and New Year Holidays, expected to resume on the 8th of
January 2025.
Outcrop mapping and rock chip sampling has confirmed visual observations of mineralisation
in 5 new target locations.
These 5 areas are part of the Southern Corridor and highlight the attractive resource expansion
potential at Dart’s newly acquired Triumph project.
The rock chips exhibit veins with both fresh sulphide and Fe oxide after sulphide and all rock
chip samples have anomalous pathfinder element readings via pXRF.
These 5 undrilled locations now confirm historical observations of mineralisation and Dart will
incorporate these targets into 2025 scheduled drill planning.
Rock chip results are expected mid to late January 2025.
Dart Mining NL (“Dart” or the “Company”) is pleased to announce that the commencement of on
ground reconnaissance activities has affirmed historical outcropping targets in Triumph’s South
Corridor. These 5 locations, which remain undrilled, present new resource growth target areas for
Dart to include in their resource growth drilling.
Figure 1 – Example of the mineralised rock chips collected in December 2024 for analysis.
Dart Mining NL
ABN: 84 119 904 880
Level 6, 412 Collins Street
Melbourne VIC 3000
Contact: James Chirnside
Email: jchirnside@dartmining.com.au
Mobile: +61 447 447 613
Webpage: www.dartmining.com.au
LinkedIn: Dart Mining NL
Twitter: @DartMining
1|Page
Figure 1 shows two example rock chips collected which have been interpreted to exhibit fresh
sulphide and Fe oxide after sulphide in hand sample. Observation of outcropping quartz veining was
recorded, and Dart has included these areas in their drill planning. Rock chips have been delivered
to ALS Global in Brisbane with gold and multi element results due mid-late January 2025.
Visual estimates of mineralisation abundance should never be considered a proxy or substitute for Laboratory analysis.
Visual estimates potentially provide no information regarding concentration of economic grades or factors, impurities
or deleterious physical properties relevant to valuation.
Figure 2 shows these target areas relative to the Southern Corridor current Mineral Resource
Estimate (MRE) locations. Results of historical rock chip sampling in these areas by Metal Bank and
Roar Resources (ASX: MBK April 2014) include:
•
53.5 g/t Au Cattle Creek Zone;
•
47.1 g/t Au Welcome Zone;
•
32.7 g/t Au Old Welcome Zone;
•
32.3 g/t Au Old Welcome Zone; and
•
26.8 g/t Au
Figure 2 – Plan map showing the new target areas with no drilling
Darts Chairman, James Chirnside, commented: “These early rock chip samples collected from
undrilled target areas confirm Dart’s interpretation of resource expansion potential at Triumph.
While we’ve been busy initiating a milestone drilling programme, the geology field team have been
focussing on developing a range of areas across the lease areas to add to Dart’s growing list of
resource growth targets at Triumph. The advantage of the Dart owned and operated diamond drill
rig at site allows the team to obtain important data on geological structure and mineralisation as
drilling progresses.”
2|Page
TRIUMPH GOLD PROJECT DRILLING
Diamond drilling at the Constitution Prospect commenced in December and has paused until the
new year. Dart looks forward to the recommencement of drilling in early January and providing
shareholders with strong news flow as assay results and visuals are returned.
Figure 3: Dart owned Drilling Rig in operation at Triumph
Figure 4: First competent core returned from hole TRDD001
3|Page
The addition of new undrilled targets with high-grade surface expressions provides significant
potential and demonstrates the scale of this intrusion related gold system (IRGS).
NEXT STEPS
At the Triumph Gold Project, Dart intends to:
•
Update the Mineral Resource Estimate (MRE), intended for ASX release early 2025;
•
Continuation of Diamond drilling programme to expand the existing resources along strike
and at depth in accordance with Table 1 below;
•
Undertake regional exploration, targeting the project area, as well as testing bulk tonnage
targets;
•
Continue to review and identify additional prospective target zones for exploration at
Triumph in addition to existing resource areas;
Continue to review and identify further advanced projects throughout Central Queensland
for potential acquisition or joint venture;
•
•
Consider existing project rationalisation through divestment throughout 2025
Table 1 – Project timelines assuming a single rig operation only
Approved for release by the Board of Directors.
For more information contact:
James Chirnside
Managing Director
Dart Mining NL
jchirnside@dartmining.com.au
+61 447 447 613
Aimee Coates
Investor Relations
Dart Mining NL
acoates@dartmining.com.au
4|Page
About Dart Mining
The Triumph Gold Project is Dart’s first step into an advanced intrusion related gold system project in
Queensland. Dart will look to develop a regional presence in Queensland through advanced stage intrusion
related and epithermal gold projects. Dart Mining will continue to evaluate several historic goldfields in
Central and Northeast Victoria including the Rushworth Goldfield and the new porphyry and lithium province
in Northeast Victoria identified by Dart. The area is prospective for precious, base, and strategic metals. Dart
Mining has built a strategic and highly prospective gold exploration portfolio in Central and Northeast regions
of Victoria, where historic surface and alluvial gold mining indicates the existence of potentially large gold
endowment.
Competent Person’s Statement
The information in this report has been prepared, compiled, and verified by Mr. Owen Greenberger (B.Sc.
Geology), a Competent Person who is a Member of the Australian Institute of Geoscientists. Mr. Greenberger
is Head of Exploration for Dart Mining. Mr. Greenberger has sufficient experience that is relevant to the style
of mineralisation and type of deposits under consideration and to the activity being undertaken to qualify as
a competent person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves”. Mr. Greenberger takes responsibility for the exploration
results, and consents to the inclusion in the report of the matters based on his information in the form and
context in which it appears.
Forward-Looking Statement
Certain statements contained in this document constitute forward-looking statements. Forward-looking
statements include, but are not limited to, Dart Mining’s current expectations, estimates and projections
about the industry in which Dart Mining operates, and beliefs and assumptions regarding Dart Mining’s future
performance. Such forward-looking statements are based on a number of estimates and assumptions made
by the Company and its consultants in light of experience, current conditions and expectations of future
developments which the Company believes are appropriate in the current circumstances. When used in this
document, words such as; “anticipate”, “could”, “intends”, “estimate”, “potential”, “plan”, “seeks”, “may”,
“should”, and similar expressions are forward-looking statements. Although Dart Mining believes that its
expectations presented in these forward-looking statements are reasonable, such statements are subject to
known and unknown risks, uncertainties and other factors, which may cause the actual results, achievements
and performance of the Company to be materially different from the future results and achievements
expressed or implied by such forward-looking statements. Investors are cautioned that forward-looking
information is no guarantee of future performance and accordingly, investors are cautioned not to place
undue reliance on these forward-looking statements.
5|Page
APPENDIX ONE
Table 2. Sample Details
SampleID
Surveyed
Easting
(MGA Zone 56)
Surveyed
Northing
(MGA Zone 56)
24TRRC001
24TRRC002
24TRRC003
24TRRC004
24TRRC005
24TRRC006
24TRRC007
334031.91
334041.12
334308.57
334362.77
334531.49
334521.32
334779.15
7308836.74
7308828.63
7308552.83
7308369.2
7307960.77
7307963.3
7308826.59
Date
Sampled
11-Dec-24
11-Dec-24
11-Dec-24
11-Dec-24
11-Dec-24
11-Dec-24
11-Dec-24
Quartz
(%)
2
2
1
5
20
10
10
Comments
In creek gully outcrop. Veinlets with FeOX striking @ 330 in TLT in bottom of creek.
Very close to TRRC002 along strike. Also Veinlets with minor FeOX in TLT. Possibly same structure.
Float away from any outcrop. TLT with FeOX and Qtz
Mullock from next to historic shaft. Disseminated py in TLT with Qtz VN <10mm . Shaft striking 290 maybe.
Close to TRRC006. Qtz VN with FeOX in float. No Out corp near by on steep slope
Close to TRRC005. Qtz VN with FeOX in float. No Out corp near by on steep slope
Qtz VN with FeOX in float next to costine striking 90
Visual estimates of mineralisation abundance should never be considered a proxy or substitute for Laboratory analysis. Visual estimates potentially provide no information regarding
concentration of economic grades or factors, impurities or deleterious physical properties relevant to valuation.
6|Page
APPENDIX TWO
THE TRIUMPH GOLD PROJECT
The Triumph Gold Project (Triumph or Project) is located approximately 520km by road north of
Brisbane, Queensland, and is well serviced by the coastal port city of Gladstone 80km by road to the
north. The Project is comprised of two Exploration Permits: EPM 18486 and EPM 19343 covering an
area of 137.6 sq.km or 43 sub-blocks in total. The Company has recently applied for additional area
immediately adjacent east of the triumph project with EMP 29097.
Figure 7: Location of the Triumph Gold Project
Geology
The Triumph Gold Project is located in the Yarrol belt of the Wandilla Province (New England
Orogen), where late Permian to Middle Triassic leucocratic intrusives are scattered throughout
Devonian and Carboniferous sediments. Known mineralisation at Triumph is located within one of
these intrusive bodies, the Norton Tonalite.
The Norton Tonalite is dissected by numerous brittle faults and shears, as well as common minor
mafic intrusive dykes of dolerite to basaltic composition. There is a distinct magnetic low signature
at the core of the Norton Tonalite which is yet to be drill tested (ASX SHN: Robust Maiden Resource at Triumph
Gold Project (31 March 2022)).
Structure
The Norton Tonalite is sinistrally offset by 1.8km by the northwest-trending Norton Fault, which can
be traced for over 28km. Initially thought to post date mineralisation, a single drill hole has
intersected the interpreted Norton Fault which returned 1m @ 2.9g/t Au and 1m @ 2.2g/t Au (ASX
MKB: Triumph Gold Project Update Amended (25 July 2014) indicating that the fault may have been active during
the main gold mineralisation event.
7|Page
On a local scale the Norton Tonalite has two distinct fracture orientations that both host gold
mineralisation. One fracture set is approximately east-west striking and the other is northwestsoutheast striking. These fracture orientations are likely to have formed contemporaneously (ASX
SHN: Robust Maiden Resource at Triumph Gold Project (31 March 2022)).
Mineralisation
Gold and silver mineralisation is hosted in quartz-sulphide veins with pyrite and arsenopyrite
forming the bulk of the sulphide. Calcite is abundant in some lodes and present in most or all of
them. Veins typically show sericite-chlorite alteration halos although this appears to be more
associated with quartz veining rather than sulphides. Mineralisation at Triumph is interpreted as an
intrusion related gold system (IRGS) (ASX SHN: Robust Maiden Resource at Triumph Gold Project (31 March 2022)).
Morrison (Intrusion-Related Gold Deposits in North Queensland, GSQ Project final meeting 7th December, 2017)
stated that there were over 130 known IRGS in Queensland with 17 of these having resources over
1 million ounces. Sunshine have stated that Triumph is analogous to the Ravenswood IRGS gold
deposit which has an endowment in excess of 5 million ounces of gold (ASX SHN: Follow Up Drilling at Liontown
(19 June 2024)).
Existing Resource Highlights
The Project is located across the historic Norton Goldfield and has a current JORC (2012) Mineral
Resource Estimate prepared over five prospects in close proximity: Inferred gold resource of
118,000 oz made up of 1,808,000 tonnes at a grade of 2.0g/t gold using a 1g/t cut-off (ASX SHN: Robust
Maiden Resource at Triumph Gold Project (31 March 2022)).
More than 85% of the Triumph Inferred resource is within 100m of the surface and largely located
within 1.2km of strike within a 6km long structural corridor (ASX SHN: Follow Up Drilling at Liontown (19 June
2024)).
Dart considers that there is potential for proving up mineralisation below current drilling and open
pit depths that may result in underground mining options subject to favourable economic studies.
Table 3: Mineral Resource Estimate – Triumph Gold Project above a 1g/t cut-off grade ((ASX SHN:
Robust Maiden Resource at Triumph Gold Project (31 March 2022)).
Dart Mining NL confirms in the above resource estimate that it is not aware of any new information or data that
materially affects the information included in the above, and that all material assumptions and technical parameters
underpinning the estimates in the relevant market announcement continue to apply and have not materially changed
8|Page
Existing drill intercept highlights are shown on Figure 8 for the Southern Mineralised Corridor
including the Super Hans, Big Hans, New Constitution and South Constitution resource blocks.
Existing drill intercept highlights are shown on Figure 10 for the Northern Mineralised Corridor
including the Bald Hill resource block and historic Advance mine area.
Figure 8 – Existing drill intercept highlights for the Southern Mineralised Corridor including (east to west) the Super
Hans, Big Hans, New Constitution and South Constitution resource blocks.
Figure 9 – Schematic model of Big Hans resource showing the multiple veins
and anastomosing nature.
9|Page
Big Hans schematic model (Figure 9) illustrates why diamond core should allow Dart to obtain a
better understanding of the multiple mineralised sulphide-quartz-calcite lodes and the degree of
continuity or anastomosing present at Triumph. Existing drilling is biased 10:1 to RC and structural
interpretation of oriented core is warranted to understand the controls on these veins. This could
lead to unlocking high grade ‘shoots’ or zones within the mineralized corridor, which can be applied
elsewhere at Triumph.
Figure 10 - Existing drill intercept highlights the Northern Mineralised Corridor including the Bald Hill resource block,
Bald Hill East and historic Advance mine area.
10 | P a g e
APPENDIX THREE
JORC Code, 2012 Edition – Table 1 report template
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut channels, random chips, or
specific specialised industry standard measurement tools appropriate
to the minerals under investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc). These examples should
not be taken as limiting the broad meaning of sampling.
• Include reference to measures taken to ensure sample representivity
and the appropriate calibration of any measurement tools or systems
used.
• Aspects of the determination of mineralisation that are Material to the
Public Report.
• In cases where ‘industry standard’ work has been done this would be
relatively simple (eg ‘reverse circulation drilling was used to obtain 1
m samples from which 3 kg was pulverised to produce a 30 g charge
for fire assay’). In other cases more explanation may be required,
such as where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types (eg
submarine nodules) may warrant disclosure of detailed information.
• Drill type (eg core, reverse circulation, open-hole hammer, rotary air
blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple
or standard tube, depth of diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by what method, etc).
• Method of recording and assessing core and chip sample recoveries
and results assessed.
• Measures taken to maximise sample recovery and ensure
representative nature of the samples.
• Whether a relationship exists between sample recovery and grade
and whether sample bias may have occurred due to preferential
loss/gain of fine/coarse material.
• Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
•
Drilling
techniques
Drill sample
recovery
Logging
•
•
•
Rockchip samples were collected from identified outcrops using rock
hammers. The samples are between 0.5 and 2.0kg and were collected
in marked calico bags for assaying.
Rockchip samples were collected by hand and in several locations and
in some instances, multiple samples were collected from a single
outcrop to understand the variability of the material.
Measurements of the apparent thickness of these outcrops are
reported in the announcement. These are apparent as the true
orientation of the outcrops are not fully known yet. The visual
estimates here are of the thickness of the outcrop only.
Sampling of the Ionic Leach is collecting up to a 1kg sample of
soil/sediment material from just below to surface at a consistent
depth.
• No drilling results are reported and is not applicable.
• No drilling results are reported and is not applicable.
•
Basic descriptions of the outcrops were made in the field by Dart
geologist which include observations of minerals, oxidation,
11 | P a g e
Criteria
JORC Code explanation
•
Subsampling
techniques
and sample
preparation
•
•
•
•
•
•
•
Mineral Resource estimation, mining studies and metallurgical
studies.
Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
The total length and percentage of the relevant intersections logged.
If core, whether cut or sawn and whether quarter, half or all core
taken.
If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
For all sample types, the nature, quality and appropriateness of the
sample preparation technique.
Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
Measures taken to ensure that the sampling is representative of the in
situ material collected, including for instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of the material
being sampled.
Commentary
•
•
•
•
•
•
Quality of
assay data
and
laboratory
tests
Verification
of sampling
• The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is considered
partial or total.
• For geophysical tools, spectrometers, handheld XRF instruments, etc,
the parameters used in determining the analysis including instrument
make and model, reading times, calibrations factors applied and their
derivation, etc.
• Nature of quality control procedures adopted (eg standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels
of accuracy (ie lack of bias) and precision have been established.
• The verification of significant intersections by either independent or
alternative company personnel.
• The use of twinned holes.
•
•
•
•
•
gossanous features, and orientation of the outcropping units where
possible. These logs are sufficient to support the preliminary nature of
assessing the outcrops.
The logging is qualitative in nature of the rock chip samples.
No field sub sampling has been undertaken on the samples. Whole
rocks were submitted to the laboratory for standard crushing and
pulverizing with the laboratory taking representative sub-samples as
required for analysis as per their accredited protocols.
The sampling technique is appropriate for the sample type and
material sampled. The rocks will be crushed to -2mm and then
pulverized to -75um for multi element acid digest and 50g fire assay
for gold analysis.
Sub-sampling QAQC is not applicable to this announcement.
Samples are selectively taken from outcrops. The samples represent
rockchips that are of geological interest for a variety of reasons
including minerals, shape, colour and alteration presented to the
sampler. The sampling is not representative of the entire outcrops
intercepted in the field, but rather to confirm if the outcrops are
mineralised.
Sample sizes are appropriate for the analysis proposed and the master
pulp after pulverization and initial analysis should be sufficient for
additional testing if required.
Assay results and laboratory procedures used are representative subsamples of the total sample mass and considered suitable for rock
chip samples.
pXRF was used to confirm he presence of anomalous elements as
pathfinders which included lead, zinc, silver, and arsenic which is
known to be related to gold mineralisation at Triumph.
No independent quality control samples were used considering these
samples represent initial reconnaissance sampling.
No significant intercepts have been returned in the rockchip assaying.
No drilling is defined in this announcement.
12 | P a g e
Criteria
JORC Code explanation
Commentary
and
assaying
• Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
• Discuss any adjustment to assay data.
•
•
Location of
data points
Data spacing
and
distribution
Orientation
of data in
relation to
geological
structure
Sample
security
Audits or
reviews
Logging and photographs of the samples were completed by Dart’s
experienced field geologist. These photos were reviewed by several
geologists remotely, including the Competent Person prior to being
submitted to the laboratory.
No data entry is performed and upon review of the samples spatially,
they reconcile with the planned coordinates provided to the field
team.
• Accuracy and quality of surveys used to locate drill holes (collar and
down-hole surveys), trenches, mine workings and other locations
used in Mineral Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient to establish the
degree of geological and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s) and
classifications applied.
• Whether sample compositing has been applied.
• Whether the orientation of sampling achieves unbiased sampling of
possible structures and the extent to which this is known, considering
the deposit type.
• If the relationship between the drilling orientation and the orientation
of key mineralised structures is considered to have introduced a
sampling bias, this should be assessed and reported if material.
• The measures taken to ensure sample security.
•
•
•
The location of the samples were recorded with a dGPS system.
The grid system used is GDA94 MGA Zone 56.
Topographic control is not applicable given the samples were collected
from outcrop.
•
The samples reported in this announcement were collected randomly
from outcrop.
No compositing has been applied.
• The results of any audits or reviews of sampling techniques and data.
• No audits or reviews have been completed of sampling techniques.
•
•
•
The rockchip samples were collected at the discretion of the field
geologist on site and are selective in nature.
No drilling results are reported.
• Samples were kept in the custody of Dart employees and delivered
directly to ALS Geochemistry in Brisbane.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Commentary
Mineral
tenement
• Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint
•
The Triumph project consists of EPM 18486 and EPM 19343, both
100% owned by XXXX Gold Pty Ltd, a wholly owned subsidiary of
13 | P a g e
Criteria
JORC Code explanation
and land
tenure status
ventures, partnerships, overriding royalties, native title interests,
historical sites, wilderness or national park and environmental
settings.
• The security of the tenure held at the time of reporting along with any
known impediments to obtaining a licence to operate in the area.
Commentary
•
•
Exploration
done by
other parties
• Acknowledgment and appraisal of exploration by other parties.
•
•
Geology
• Deposit type, geological setting and style of mineralisation.
•
•
Drill hole
Information
• A summary of all information material to the understanding of the
exploration results including a tabulation of the following information
for all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level in
metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
• If the exclusion of this information is justified on the basis that the
information is not Material and this exclusion does not detract from
the understanding of the report, the Competent Person should clearly
explain why this is the case.
Sunshine Gold Limited. The tenements are in good standing and no
known impediments exist. Dart Mining NL has completed the
acquisition of these two tenements and the process to transfer title is
underway.
ML80035 (covering an area of 0.2km) is located within the project
area and is excluded from the tenure.
Exploration is prohibited within a small area of Category B
environmentally protected area as well as a National Park shown in
Figure 2. The current approved Environmental Authority (EA) allows
for advanced exploration activities to occur up to the National Park
(NP) boundary.
AMOCO conducted limited exploration focussing on the Bald Hill vein
in 1987. Seven RC holes were drilled at Bald Hill. The bulk of
exploration across the tenure has been conducted by Metal Bank
Limited and subsidiary Roar Resources between 2012 – 2020.
Historical Exploration data and production records were compiled via
open file reports accessible via the QLD Geological Survey QDEX
system (notably Ball. L.C. 1906. Report on the Norton Goldfields,
Queensland Geological Survey Publication 208).
EPM18486 and EPM19343 overlaps the Calliope and Miriam Vale
1:100,000 map sheets.
The style of mineralisation intersected is interpreted to be intrusionrelated gold mineralisation within the northern New England Orogen.
• No drillhole information is reported in this announcement.
14 | P a g e
Criteria
JORC Code explanation
Commentary
Data
aggregation
methods
• In reporting Exploration Results, weighting averaging techniques,
maximum and/or minimum grade truncations (eg cutting of high
grades) and cut-off grades are usually Material and should be stated.
• Where aggregate intercepts incorporate short lengths of high grade
results and longer lengths of low grade results, the procedure used
for such aggregation should be stated and some typical examples of
such aggregations should be shown in detail.
• The assumptions used for any reporting of metal equivalent values
should be clearly stated.
• These relationships are particularly important in the reporting of
Exploration Results.
• If the geometry of the mineralisation with respect to the drill hole
angle is known, its nature should be reported.
• If it is not known and only the down hole lengths are reported, there
should be a clear statement to this effect (eg ‘down hole length, true
width not known’).
• Appropriate maps and sections (with scales) and tabulations of
intercepts should be included for any