Triumph Drilling Confirms New Constitution Mineralisation
Released
Released
Announcement PDF
ASX Release
4th September 2025
TRIUMPH DEEP DRILLING CONFIRMS NEW CONSTITUTION
MINERALISATION IS OPEN AT DEPTH
Dart Mining NL (“Dart” or the “Company”) is pleased to announce an update on its ongoing Triumph
diamond drilling programme. The drilling has aimed to provide information on the presence and
grade of mineralisation at depth below the New Constitution Mineral Resource. This update includes
assay results and mineralisation observations from drill hole TRDD013 and mineralisation
observations from TRDD014 (assays pending).
HIGHLIGHTS
•
Highlight significant assays for TRDD013 include:
•
•
•
•
0.4m @ 34.6 g/t Au and 15.0 g/t Ag from 258.6m;
0.5m @ 15.9 g/t Au and 68.3 g/t Ag from 62.5m;
1.8m @ 3.1 g/t Au and 10.0 g/t Ag from 151.7m;
o including 0.4m @ 13.25 g/t Au and 39.3 g/t Ag from 151.7m;
2.5m @ 2.3 g/t Au and 9.0 g/t Ag from 199.5m;
o including 0.5m @ 9.6 g/t Au and 32.5 g/t Ag from 199.5m
•
Drilling of TRDD013 has also confirmed the presence of new lodes to the east of the known
mineralisation which is consistent with Dart’s previously reported TRDD005 and TRDD006 drill
holes (ASX: DTM July 2025);
•
Depth extent of the mineralisation is still considered open at depth and to the east with all of
Dart’s diamond drill holes intersecting multiple new lodes, confirm by assay and TRDD014
(assays pending) also confirming mineralisation from geological logging with up to 70% pyrite
and 10% arsenopyrite in veins which were visually estimated from the core;
•
The focus on advancing diamond drilling at New Constitution has highlighted the potential to
deepen the Mineral Resource by another 140m (currently ~180m) with sufficient drilling and that
the zone of the New Constitution lodes are now twice as wide (from 100m to 190m wide) with
the discovery of new lodes.
Dart Mining NL
ABN: 84 119 904 880
Level 6, 412 Collins Street
Melbourne VIC 3000
Contact: James Chirnside
Email: jchirnside@dartmining.com.au
Mobile: +61 447 447 613
Webpage: www.dartmining.com.au
LinkedIn: Dart Mining NL
Twitter: @DartMining
ASX: DTM
1|Page
Visual estimates of mineralisation presence and abundance contained in this announcement
should never be considered a proxy or substitute for Laboratory analysis. Visual estimates
potentially provide no information regarding concentration of economic grades or factors,
impurities or deleterious physical properties relevant to valuation.
Darts Chairman, James Chirnside, commented: “Dart is excited with the Deep Drilling phase of our
maiden diamond work for two main reasons. One is the continued discoveries of new lodes to the
east of the New Con prospect, and the second is that the intersection of mineralisation at depth was
predicted very closely based on projections from higher in the sequence. The team will continue to
look at these results in the context of gold grade and pathfinder elements to understand what, if
any, changes in plunge orientation of the high-grade shoots exist at depth. Now that we know they
extend at depth, we will focus on the high-grade zones for understanding the underground
potential.”
The first of the deep drill holes completed by Dart has shown that zones of mineralisation to a total
vertical depth of ~300m are present under the New Constitution deposit. These zones are consistent
with discrete vein and alteration zones running nearly vertically through the host tonalite and match
well with the existing Mineral Resource interpretation at shallower depths.
Further, the drilling of TRDD013 assays has confirmed with a third Dart diamond drill hole that the
new eastern lodes of New Constitution are extensive and can carry significant grade (TRDD013). As
Dart continues to set drill collars further east, more and more new lodes are being intersected for
further interpretation and analysis.
Dart has completed 2,784m (14 holes – TRDD014 is still underway) of diamond core drilling across
New Constitution, South Constitution, and Big Hans (results previously released (ASX: DTM July
2025, ASX: DTM July 2025). The latest results from TRDD013 have been received and represented
Dart’s first deep drill hole into the Triumph Project. Table 1 outlines significant intercepts and
highlights intercepts that are new lodes to the New Constitution zone. Logging of TRDD014 has been
completed to the current depth (309m) and there is another 120m planned. Figure 1 shows the
location of TRDD013 and TRDD014 relative to the existing New Constitution Mineral Resource.
2|Page
Figure 1: Plan map of TRDD013 and TRDD014 relative to existing MRE.
Table 1: Summary of significant intercepts from TRDD013.
Drill Hole Name
From Depth (m)
Thickness (m)
Au g/t
Ag g/t
Notes
TRDD013
62.5
0.5
15.85
68.30
New Lode
TRDD013
72.6
1.5
0.85
7.28
New Lode
TRDD013
151.7
1.8
3.06
10.00
New Lode
Including
151.7
0.4
13.25
39.3
New Lode
TRDD013
199.5
2.5
2.34
9.01
New Lode
Including
199.5
0.5
9.64
32.5
New Lode
TRDD013
258.6
0.4
34.60
14.95
TRDD013
279.0
1.0
0.70
0.84
TRDD013
291.4
1.6
1.32
2.59
Including
292.0
0.5
2.82
6.53
TRDD013
348.5
3.0
0.67
9.38
Including
349.5
1.0
1.45
20.9
3|Page
The geological logging of TRDD014 highlights the strong presence of arsenopyrite, pyrite, and some
sphalerite and is vein dominated, which is typical of Triumph mineralisation. Alteration, which can be
seen in Figure 2, is characterised by strong sericitic to chloritic vein selvage alteration with observations
of silicification and albitisation of the host tonalite. Figure 2 also highlights a highly mineralised vein
with moderate levels of observed arsenopyrite, pyrite, and sphalerite. Importantly, the core shown in
Figure 2 is not current in Mineral Resource and is a NEW LODE to the east of New Constitution. This
highlights the depth potential of these new lodes. Dart will update the market on TRDD014 assays
when they become available, including a cross section to highlight the assay results.
Figure 2: Core tray highlighting broad zone of strong alteration and visual mineralisation present - TRDD014.
Visual estimates of mineralisation presence and abundance contained in this announcement should
never be considered a proxy or substitute for Laboratory analysis. Visual estimates potentially provide
no information regarding concentration of economic grades or factors, impurities or deleterious
physical properties relevant to valuation
Dart’s recent focus on deeper extensions to the high-grade zones of the Triumph prospects is to
highlight the depth potential of the existing Mineral Resource. As shown in the cross sections in Figure
3, the diamond drilling Dart is progressing is both opening up newly discovered lodes and providing
important depth extensions to the known mineralisation.
4|Page
Figure 3: TRDD013 cross section showing extensions as well as new zones of mineralisation and assays > 0.1
g/t Au.
Table 2: Mineralisation Logging Details for TRDD014.
Hole ID
Meters
From
Meters
To
Width
(m)
Pyrite
%
Arsenopyrite
%
Chalcopyrite
%
Sphalerite
%
TRDD014
33
35.6
2.6
5
0.5
TRDD014
35.6
43.2
7.6
0.5
0.2
TRDD014
43.2
56.4
13.2
0.2
TRDD014
56.4
56.85
0.45
70
TRDD014
80.5
88
7.5
2
TRDD014
101.9
102.7
0.8
TRDD014
102.7
116.2
13.5
0.2
0.1
TRDD014
116.2
118.5
2.3
1
0.4
TRDD014
131.9
132.25
0.35
0.5
TRDD014
146.65
154.5
7.85
0.2
TRDD014
154.5
154.7
0.2
10
2
TRDD014
166.3
166.75
0.45
1
2
TRDD014
189.75
189.85
0.1
2
10
TRDD014
207
207.15
0.15
2
TRDD014
233.75
234.05
0.3
10
TRDD014
234.05
238.8
4.75
0.5
TRDD014
271
272.45
1.45
0.2
TRDD014
280.3
283.8
3.5
0.1
Galena
%
Comments
Mineralized
fault zone
0.5
0.1
1
1
20
5
0.1
0.5
0.5
0.1
8
1
1
10
1
5
1
Visual estimates of mineralisation presence and abundance contained in this announcement should
never be considered a proxy or substitute for Laboratory analysis. Visual estimates potentially
provide no information regarding concentration of economic grades or factors, impurities or
deleterious physical properties relevant to valuation
5|Page
NEXT STEPS
At the Triumph Gold Project, Dart intends to:
•
Drill test depth potential beneath the Southern Mineralised Corridor and chargeability
anomaly to the Northwest of New Constitution;
•
Undertake the first diamond drilling at the Advance mine where previous drill intercepts
include 3m @ 24.97g/t gold, 1m @ 45g/t gold and 3m @ 9.7g/t gold (ASX: DTM 2 Dec 2024).
•
Continue Diamond drilling to expand the existing resources along strike and at depth;
•
In the current quarter complete and announce a high-quality Exploration Target for the
Triumph Gold Project based upon existing drilling in areas where this drilling does not yet
have the required density to proclaim a JORC Resource;
•
Undertake regional exploration, targeting the project area, as well as testing bulk tonnage
targets including those at depth;
•
Continue to review and identify additional prospective target zones for exploration in
addition to existing resource areas; and
•
Conduct an initial review of possible pathways to production for Triumph to determine the
likely timeframes and information requirements for a more comprehensive study.
Approved for release by the Board of Directors.
For more information contact:
Please see our Investor Hub for further information
James Chirnside
Managing Director
Dart Mining NL
jchirnside@dartmining.com.au
+61 419 605 842
Owen Greenberger
Head of Exploration / Investor Relations
Dart Mining NL
ogreenberger@dartmining.com.au
About Dart Mining
The Triumph Gold Project is Dart’s first step into an advanced intrusion related gold system project in
Queensland. Dart will look to develop a regional presence in Queensland through advanced stage intrusion
related and epithermal gold projects. Dart Mining will continue to evaluate several historic goldfields in
Central and Northeast Victoria including the Rushworth Goldfield and the new porphyry and lithium province
in Northeast Victoria identified by Dart. The area is prospective for precious, base, and strategic metals. Dart
Mining has built a strategic and highly prospective gold exploration portfolio in Central and Northeast regions
of Victoria, where historic surface and alluvial gold mining indicates the existence of potentially large gold
endowment.
6|Page
Competent Person’s Statement
The information in this report has been prepared, compiled, and verified by Mr. Owen Greenberger (B.Sc.
Geology), a Competent Person who is a Member of the Australian Institute of Geoscientists. Mr. Greenberger
is Head of Exploration for Dart Mining. Mr. Greenberger has sufficient experience that is relevant to the style
of mineralisation and type of deposits under consideration and to the activity being undertaken to qualify as
a competent person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves”. Mr. Greenberger takes responsibility for the exploration
results, and consents to the inclusion in the report of the matters based on his information in the form and
context in which it appears.
The information in this report that relates to Mineral Resources is based on information compiled and
reviewed by Mr Andrew Dawes, who is a Member of the Australasian Institute of Mining and Metallurgy and
a Member of the Australian Institute of Geoscientists. Mr Andrew Dawes is employed by AHD Resources and
consults to Dart Mining NL. Mr Andrew Dawes has sufficient experience that is relevant to the style of
mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a
Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Mineral Resources.
Mr Andrew Dawes consents to the inclusion in the report of the matters based on his information in the form
and context in which it appears.
Dart Mining confirms that it is not aware of any new information or data that materially affects the
information included in this, or referenced relevant market announcements and, in the case of estimates of
mineral resources or ore reserves, that all material assumptions and technical parameters underpinning the
estimates continue to apply and have not materially changed
Forward-Looking Statement
Certain statements contained in this document constitute forward-looking statements. Forward-looking
statements include, but are not limited to, Dart Mining’s current expectations, estimates and projections
about the industry in which Dart Mining operates, and beliefs and assumptions regarding Dart Mining’s future
performance. Such forward-looking statements are based on a number of estimates and assumptions made
by the Company and its consultants in light of experience, current conditions and expectations of future
developments which the Company believes are appropriate in the current circumstances. When used in this
document, words such as; “anticipate”, “could”, “intends”, “estimate”, “potential”, “plan”, “seeks”, “may”,
“should”, and similar expressions are forward-looking statements. Although Dart Mining believes that its
expectations presented in these forward-looking statements are reasonable, such statements are subject to
known and unknown risks, uncertainties and other factors, which may cause the actual results, achievements
and performance of the Company to be materially different from the future results and achievements
expressed or implied by such forward-looking statements. Investors are cautioned that forward-looking
information is no guarantee of future performance and accordingly, investors are cautioned not to place
undue reliance on these forward-looking statements.
7|Page
APPENDIX ONE
JORC Code, 2012 Edition – Table 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Sampling
techniques
• Nature and quality of sampling (eg cut channels, random
chips, or specific specialised industry standard measurement
tools appropriate to the minerals under investigation, such as
down hole gamma sondes, or handheld XRF instruments,
etc). These examples should not be taken as limiting the
broad meaning of sampling.
• Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
• Aspects of the determination of mineralisation that are
Material to the Public Report.
• In cases where ‘industry standard’ work has been done this
would be relatively simple (eg ‘reverse circulation drilling was
used to obtain 1 m samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other cases more
explanation may be required, such as where there is coarse
gold that has inherent sampling problems. Unusual
commodities or mineralisation types (eg submarine nodules)
may warrant disclosure of detailed information.
• Drill type (eg core, reverse circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic, etc) and details (eg core
diameter, triple or standard tube, depth of diamond tails, facesampling bit or other type, whether core is oriented and if so,
by what method, etc).
• Method of recording and assessing core and chip sample
recoveries and results assessed.
• Measures taken to maximise sample recovery and ensure
representative nature of the samples.
• Whether a relationship exists between sample recovery and
grade and whether sample bias may have occurred due to
Drilling
techniques
Drill sample
recovery
Commentary
•
•
•
•
Sampling has been made on NQ diamond drilled core.
Sampling is whole core sampling based on the geologists sub sampling
(down to 30cm) logging definition.
As it is whole core, no sub-sampling techniques were used.
Samples are prepared with PREP-31B which includes crush to 70 %
passing 2mm, riffle split off 1kg, pulverise split to better than 85%
passing 75 microns.
•
Drilling is diamond drilling NQ core size and is triple tube drilling. Core
is oriented where possible using the Reflex ACT III tool.
•
Core is measured after each run and core recovery based on the drill
metres is recorded.
Once in the transition and fresh material, Triumph experiences limited
to no core loss with the exception of intensely broken zones where
recovery is still > 95%.
•
8|Page
Criteria
JORC Code explanation
preferential loss/gain of fine/coarse material.
Logging
Subsampling
techniques
and sample
preparation
Quality of
assay data
and
laboratory
tests
• Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies and
metallurgical studies.
• Whether logging is qualitative or quantitative in nature. Core
(or costean, channel, etc) photography.
• The total length and percentage of the relevant intersections
logged.
• If core, whether cut or sawn and whether quarter, half or all
core taken.
• If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
• For all sample types, the nature, quality and appropriateness
of the sample preparation technique.
• Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
• Measures taken to ensure that the sampling is representative
of the in situ material collected, including for instance results
for field duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain size of the
material being sampled.
• The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is
considered partial or total.
• For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining the
analysis including instrument make and model, reading times,
calibrations factors applied and their derivation, etc.
• Nature of quality control procedures adopted (eg standards,
blanks, duplicates, external laboratory checks) and whether
acceptable levels of accuracy (ie lack of bias) and precision
have been established.
Commentary
•
•
•
•
•
•
•
•
•
•
No relationship has been observed between sample recovery and gold
grade.
The drill core has been geologically and geotechnically logged to a level
to support appropriate mineral resource estimation, mining studies and
metallurgical studies. Core is logged both qualitatively and
quantitatively. Core tray photography is both wet and dry photography.
All 2,784m have been logged so far. Sampling is discrete based on
observed mineralisation, alteration, key structural features.
Core is whole core sampling so no sub-sampling techniques in the field
are used which ensures appropriate in-situ representation.
The PREP-31B method includes crush to 70 % passing 2mm, riffle split
off 1kg, pulverise split to better than 85% passing 75 microns. The
larger 1kg riffle split is larger than the standard 250g to reduce sample
size bias.
Sampling size is suitable to represent the mineralisation intersected.
All samples were analysed at ALS Global (ALS, Brisbane).
All samples were assayed for Au using a 50g fire assay with AU-ICP22
determination as well as ME-MS61 for multi element. In the case
where key elements are over range, Ag, Pb, Zn, and Cu was completed
using OG-62. As completed with OG46, and Au completed with GRA22.
The three types of QAQC samples were used were Certified Reference
Material (CRM/Standards), Field Duplicates, and Blank material.
The Blanks consist of store-bought sand which has been shown to be
barren based on previous work. The Blanks are used to provide
information of any possible contamination or calibration issues during
the crush, pulverisation, and analytical phases. The field duplicates
utilised the spear to collect a second sample to test repeatability
(precision) of the original sample. The standards samples are used to
9|Page
Criteria
JORC Code explanation
Commentary
•
•
•
Verification
of sampling
and
assaying
• The verification of significant intersections by either
independent or alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
• Discuss any adjustment to assay data.
•
•
•
•
Location of
data points
Data spacing
and
distribution
• Accuracy and quality of surveys used to locate drill holes
(collar and down-hole surveys), trenches, mine workings and
other locations used in Mineral Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
•
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
• Whether sample compositing has been applied.
•
•
•
•
test the accuracy of the analyses.
Three CRMs were OREAS standards and include: OREAS 277, OREAS
245, and OREAS 233.
QAQC samples were entered into the sample stream at a rate of 1 in
20.
Where lower detection limits were reported for assay results these
were replaced by half the lower detection limit for geological
interpretation and modelling purposes.
All core photos are reviewed by the Competent Person and also visited
site during early drilling.
No twinned holes have been undertaken.
Data from the field log sheets is entered into a digital database,
primarily an Excel spreadsheet with subsequent conversion into an SQL
database maintained by EarthSQL at the completion of the hole. The
Excel spreadsheet has been created with a series of validation criteria
in the form of pulldown menus for each data entry that restricts what
can be entered into each field and significantly reduces the error
associated with data entry.
Assay results are received from the laboratory in electronic (via email)
format onsite and sent to Sample Data importing to the EarthSQL
database. The electronic results are provided in an CSV file.
Collars are collected by Dart Geologists using a dGPS Trimble device
and is suitable for collecting collar XYZ.
All collar coordinates are in MGA94 Z56.
Downhole survey has been surveyed using Reflex survey tool.
AHD Resources was provided a 3D elevation topography or digital
terrain model (“DTM”) for the Triumph area from Dart Mining in the
form of a .msh file.
The drilling is in fill drilling of the existing Mineral Resource Estimate. As
such, the geological continuity is known and expected. Where new
lodes are intercepted, multiple drill holes confirm the new lodes along
strike. Given the close proximity to the existing MRE, the spacing is
sufficient to have confidence in the continuity.
10 | P a g e
Criteria
JORC Code explanation
Commentary
•
•
Orientation
of data in
relation to
geological
structure
• Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which this is
known, considering the deposit type.
• If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to have
introduced a sampling bias, this should be assessed and
reported if material.
Sample
security
• The measures taken to ensure sample security.
•
Audits or
reviews
• The results of any audits or reviews of sampling techniques
and data.
•
•
No sample compositing has been applied.
Drilling is typically orientated perpendicular to the interpreted strike of
mineralization where possible.
Darts objecting in drilling TRDD012 was the see if the structures
continue southward or to the east (towards Super Hans). Observations
of the structural logging highlight all south striking mineralised veins.
The drill hole is drilled approximately 35 degrees to the strike
orientation of the interpreted mineralisation but considering the
consistent sub perpendicular drilling due to topography constraints and
the discrete sampling by the field geologist, the impact of orientation
bias is limited.
Samples are under the care of Dart Geologists from logging through to
delivery to ALS in Brisbane.
No external reviews of audits on this drilling have been completed.
Drilling has been reviewed internally within Dart.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Mineral
tenement
and land
tenure status
• Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint
ventures, partnerships, overriding royalties, native title interests,
historical sites, wilderness or national park and environmental
settings.
• The security of the tenure held at the time of reporting along with any
known impediments to obtaining a licence to operate in the area.
Commentary
•
The Triumph project consists of EPM 18486 and EPM 19343,
both 100% owned by Dart Exploration (QLD) Pty Ltd, a wholly
owned subsidiary of Dart Mining NL. The tenements are in good
standing, and no known impediments exist.
•
ML80035 (Norton Mine ML or Norton Mining Lease) (covering
an area of 0.2km) is located within the project area and is
excluded from the tenure.
Exploration is prohibited within a small area of Category B
environmentally protected area as well as a National Park
shown in Figure 2. The current approved Environmental
Authority (EA) allows for advanced exploration activities to
occur up to the National Park (NP) boundary.
•
11 | P a g e
Criteria
JORC Code explanation
Exploration
done by
other parties
• Acknowledgment and appraisal of exploration by other parties.
Commentary
•
•
•
The first record of modern exploration being undertaken in the
area was carried out by Delhi Australian Petroleum Limited
(Delhi) from 1966 to 1971. Initially Delhi undertook gridding,
mapping of the old workings, dump sampling and an IP survey.
The IP survey highlighted five anomalous zones in and around
the old Norton workings. Three of these zones, at the
Frampton, Bald Hill and Galena prospects, were drill tested with
five holes by Noranda Australia Limited in 1969 in joint venture
with Delhi. Following Noranda’s withdrawal from the joint
venture Delhi completed a further three drillholes, one at each
of the Bald Hill, Frampton and New Constitution prospects.
Frampton is now part of ML 80035. Significant gold
intersections in drillholes outside of ML 80035 were reported,
for example NCDH-1 at the New Constitution prospect that
returned 1.5 m @ 5.5 g/t Au and 24.5 g/t Ag from 109.8 m
depth.
A significant amount of exploration was undertaken by Amoco
Minerals Australia Company, its successor Cyprus Minerals
Australia Company and joint venture partners Pacific
Goldmines, Astrik Resources and Climax Mining Limited on EPM
3581 between 1985 and 1988. Much of this work was focused
on close-spaced drilling at the Frampton, Chandler and Never
Never prospects now within the Norton Gold Fields ML – to
outline ore reserves. Within the area of EPM 18486 the work on
historical EPM 3581 consisted of stream sediment, rock and
float sampling as well as trenching at Bald Hill and Han’s Big
Dyke and drilling at Bald Hill. Nine holes at the eastern end of
the Frampton-Chandler prospect also lie within SHN’s EPM
18486. Seven of these holes intersected narrow (0.2 m to 1 m)
intervals of high-grade gold mineralisation – examples being 1
m at 16.6 g/t, 1 m at 12.0 g/t and 0.2 m at 24.6 g/t.
From 1993 to 1999 much of the area was held by Gold
Exploration Pty Ltd and subsequently Coffee Gold NL under EPM
9778. MDL 130, then covering the core of the Norton goldfield,
12 | P a g e
Criteria
JORC Code explanation
Commentary
•
•
Geology
• Deposit type, geological setting and style of mineralisation.
•
•
was excluded from this project. The work undertaken during
this period was minimal and consisted mainly of rock chip
sampling and geological reconnaissance work.
Following a hiatus of several years the Norton Goldfield and
surrounding area was held under EPM 13584 and ML 80035,
initially by AT Prowse and latterly by Norton Gold Fields Limited
from 2002. EPM 13584 has been surrendered but ML 80035 still
exists.
From 2020 to 2023, Sunshine Gold Ltd completed an extensive
RC and DD programme with the aim to define a maiden Mineral
Resource at Triumph. Through their work, Sunshine Gold Ltd
declared a Mineral Resource for Triumph in March 2022.
The local geology comprises the metasedimentary Wandilla
Formation (part of the Devonian-Carboniferous Curtis Island
Group), intruded by a series of complex Permo-Triassic granitoid
units and complexes including the Many Peaks Granodiorite,
Castletower Granite and Norton Tonalite. The project is
positioned on the Norton Splay, a regional-scale north-west
trending fault located 7km to the east of the upper Boyne rift
valley (part of a major crustal dislocation of the Yarrol Fault
Zone). The fault divides the Norton Tonalite complex, with a
majority of the Wandilla Formation to the west and granitoids
to the east. Most of the Norton Tonalite complex is recessive,
forming a 25 km2 area of low relief. Approximately 90% of the
tenure is concealed beneath shallow sedimentary cover rocks
(<10 m thick) thus masking prospective basement rocks.
The intrusive phases include the host Norton Tonalite,
interpreted as an apophysis of the Permo-Triassic (268 Ma)
Many Peaks Granodiorite that intrudes and hornfelses the
Wandilla Formation. The Norton Tonalite pluton is
compositionally zoned from marginal gabbro and diorite to
quartz diorite, tonalite, granodiorite and possibly monzogranite.
The Castletower leuco-granite south of the Norton Tonalite is
interpreted as Triassic (221 Ma) and therefore should cut the
13 | P a g e
Criteria
JORC Code explanation
Commentary
•
•
Norton Tonalite. A late